Adam Davidson, CEO of Trident Royalties, discusses offtake milestones and catalysts to boost FY24. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0375
Bid: 0.035
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.005 (14.286%)
Open: 0.0375
High: 0.0375
Low: 0.0375
Prev. Close: 0.0375
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Half-year Report

24 Sep 2021 08:00

RNS Number : 8799M
Kibo Energy PLC
24 September 2021
 

Kibo Energy plc (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

("Kibo" or "the Group" or "the Company")

 

Unaudited Interim results for the six months ended 30 June 2021

 

 

Dated 24 September 2021

 

Kibo Energy plc, the multi-asset, Africa focused, Energy Company, is pleased to announce its unaudited interim results for the 6 month period ended 30 June 2021.

 

Highlights

· Refocused strategy centred around renewable energy opportunities and capitalising on the global clean energy revolution.

· Proceeding with the agreement to jointly develop a portfolio of Waste to Energy projects in South Africa with Industrial Green Energy Solutions (Pty) Ltd, which will initially develop a phased c. 8MW project for an industrial client, to be followed by six other projects at different sites, to a total generation of up to 50MW. This aims to address the country's insecure energy supply environment as well as the renewable energy portfolio in the UK, currently the subject of a due diligence investigation.

· Intention to dispose of coal assets in accordance with a disposal strategy that will realise value for shareholders.

· Successful technical and business workshop with Mozambique Utility Electricidade De Moçambique("EDM") to negotiate and agree next steps in the process towards the agreement and finalization of a PPA for the Benga Power Project, and a formal submission of an advanced technical and commercial information pack to EDM, as part of the ongoing development workstreams provided for under the existing MoU with EDM and emanating from the Definitive Feasibility Study previously submitted to EDM.

· Successful listing in April 2021 of Mast Energy Developments which raised £5.54 million to support the company's aggressive expansion plans following the listing.

· Moreover, the market value of Kibo's 55.42% interest in MAST is valued at c. £12 million as of 23 September 2021, which is approximately twice the current valuation of Kibo.

· Post reporting period:

o All conditions have been satisfied and the agreement completed with South Africa-based Industrial Green Energy Solutions (Pty) Ltd to jointly develop a portfolio of Waste to Energy projects in South Africa. Kibo and IGES have entered into an amendment (the "Amendment") to fast track the implementation of the first project. Completion of the agreement and Amendment follows the positive findings of an extensive due diligence process.

o Completed a Heads of Terms (the "Agreement") with EQTEC plc (AIM: EQT) ("EQTEC"), a world-leading gasification solutions company, to acquire a 54.54% interest in the proposed 25 MWe Billingham waste gasification and power plant (the "Project") at Haverton Hill, Teesside, UK. The Project is at advanced stages of development with a concept design for the full plant produced, planning permission approved, grid connection offer secured. Furthermore, the Project is expected to annually process 200,000 metric tonnes of non-recyclable everyday Municipal Solid Waste into 25 Mwe of green electricity, enough to power 50,000 homes.

 

Chairman's Statement

 

Following a shift in international climate policies we recently announced a significant pivot in our strategy. We have decided to focus on the acquisition and development of a portfolio of sustainable, renewable energy assets and dispose of, or reposition, our fossil fuel utility projects. Set against this, and in following our adjusted strategy, we are currently undertaking due diligence on a portfolio comprising mostly of waste to energy projects in the UK and have signed an agreement with Industrial Green Energy Solutions (Pty) Ltd ("IGES") to jointly develop a portfolio of waste-to-energy projects in South Africa.

 

It has become increasingly apparent that the development and funding of large-scale coal - fired utility projects such as our MCPP, Benga and Mabesekwa Projects, is becoming increasingly challenging and especially for small companies like Kibo. This does not change our view that our focus should remain on the development of sustainable energy opportunities. It is in this context that Kibo has decided to refocus on smaller scale renewable energy projects, initially in countries such as the UK and South Africa, where the market opportunities, government support and technical innovation are rapidly evolving.

 

Kibo has developed much experience in the renewable energy sector in recent years primarily through its work in developing renewable energy and storage solutions for integration with its large utility coal projects in Africa. The Company was also a key driver behind Mast Energy Developments plc (Kibo holds a 55% equity stake) which has an ambitious reserve energy site portfolio and recently completed a successful IPO on the London Stock Exchange. While Mast's focus is on the niche reserve energy/peaking power site development in the UK, Kibo's will rather concentrate on Renewable Energy and Waste to Energy Opportunities.

 

I would also like to remind shareholders that we have developed significant inherent value in our large-scale utility projects over the last few years supported by our ownership interests in two large coal deposits (MCPP and Mabesekwa). We are committed to structuring our disposal plans for these projects to ensure that our shareholders retain the benefit of any future upside potential from the development of these projects. Advisers have been engaged in order to retain maximum value in the projects for Kibo whilst making them attractive for acquisition, funding and construction by potential purchasers.

 

 

Operations

 

Industrial Green Energy Solutions (IGES) Projects

 

The agreement in May 2021 with IGES for the joint development of a portfolio of waste to energy projects in South Africa (with an initial aggregate target of 50 MW generating capacity) is our first investment as part of the new strategy. Though subject to the completion of certain conditions, it will give Kibo a 65% interest (IGES will hold the balance) in a South African company holding seven projects at different sites. The intention is to convert specified grades of non-recyclable waste plastic to syngas for the generation of electricity and heat for industrial clients. Kibo's initial investment in the project will comprise R11.1 million (c. £0.55m) as an equity loan.

 

One of these sites, based South of Pretoria, will have a phased generation capacity of up to 8 MW, with the first stage of development of 4 MW expected to be completed within 14 months.

 

I believe the IGES business opportunity is timely as it coincides with intensified legal restrictions pertaining to disposal of plastics and increased demand for private electricity generation in South Africa where the state utility ESKOM are finding it difficult to meet this demand.

 

UK Energy Portfolio

 

Earlier this year we announced that an extensive due diligence process by an independent specialist was in progress on a portfolio of several attractive standalone waste-to-energy projects in the UK. Based on exclusivity, and subject to the findings, successful acquisition(s) from this portfolio will further enhance Kibo's new strategy adjustment, and in the process support the UK's Renewable Energy Strategy.

 

Other Projects

 

Our large-scale coal utility projects, Benga, MCIPP and Mabesekwa remain in good standing, and we will determine how these can be disposed of while realising a significant portion of their value.

 

Investment Holdings

 

Mast Energy Development Projects ("MED")

 

During the current year to date, Kibo had diluted its equity interest in MAST Energy Developments plc, previously a wholly owned subsidiary, as MAST raised in excess of £5m through Clear Capital Markets Ltd from its IPO on the Official List of the London Stock Exchange plc by way of a Standard Listing. On the date of listing the market capitalisation for MAST Energy Developments plc was c. £23 million.

 

Furthermore, initially Kibo's equity holding measured at cost pre-IPO in MAST was £2,615,929 which increased substantially to £6,580,050 post-IPO when calculated as a portion of the net assets of MAST. Moreover, the current market value of Kibo's 55.42% interest in MAST is valued at c. £12 million, which is approximately twice the current valuation of Kibo.

 

In addition, the recent IPO has enabled MED to expedite the addition of further reserve power sites to its portfolio to increase its generating capacity while preparing its first site for production. MED's target is to assemble a portfolio of well-located flexible power sites in the UK, commencing with c. 50 MW in the first year and building up to a portfolio of up to 300 MW of flexible power generating capacity.

 

Katoro Gold plc ("Katoro")

 

Our commitment to supporting our 25.37% investment in Katoro Gold plc (AIM: KAT) remains strong as Katoro actively progresses its projects in Tanzania (nickel sulphides & battery metals) and gold development in South Africa. The Katoro board is currently receiving and evaluating comprehensive funding proposals from several interested parties for the construction and commissioning of the Blyvoor Gold Tailings Project. A drilling programme at the Nickel-PGM Haneti project in Tanzania has also been designed and will be implemented before the end of 2021.

 

Corporate

 

During the period, we continued exploring funding options for the Company and benefited from warrant exercises resulting in the issue of 188,431,556 new shares at prices ranging from 0.2p to 0.4p yielding total proceeds of £697,726. We also settled the total outstanding amount of £339,437 pursuant to the Forward Payment Facility signed between Sanderson Capital Partners Ltd and the Company in December 2016 in cash and shares. The share component comprised £169,718 (50% of the total) for which we issued 65,276,346 new shares at a deemed value of 0.26p per share.

 

At an EGM held on 22 February 2021 the shareholders of Kibo approved resolutions to permit the migration of the Company's dematerialised shares held through CREST to Euroclear Nominees Ltd (the "Eurobank Migration") The Eurobank Migration was required to allow shareholders to continue to hold the Company shares in dematerialised form following the UK's exit from the EU and this successfully completed on the 12 March 2021.

 

Conclusion

 

I am pleased to report that the Covid-19 pandemic has not unduly impacted our business operations so far this year and would like to place on record my sincere thanks to all our employees and shareholders.

 

We are now well positioned to focus primarily on the acquisition and development of sustainable renewable energy projects, on which we have made significant progress while concurrently exploring the optimum disposal route for our large-scale utility projects.

 

The pace at which renewable energy technologies are evolving and the fragmentation of the electricity generation and supply markets including the increasing popularity of small bespoke renewable energy solutions for industry provides an attractive opportunity for Kibo to participate in these evolving energy markets.

 

 

 

Christian Schaffalitzky

Chairman

 

Unaudited Interim Results for the six months ended 30 June 2021

 

Unaudited Condensed Consolidated Interim Statement of Comprehensive Income

For the six months ended 30 June 2021

6 months to

6 months to

12 months to

30 June

30 June

31 December

Note

2021

2020

2020

(Unaudited)

(Unaudited)

(Audited)

£

£

£

Revenue

-

-

-

Administrative expenses

(1,052,448)

(1,136,966)

(3,393,687)

Exploration Expenditure

(432,678)

(181,283)

(2,052,202)

Capital raising fees

(417,315)

-

(1,027,658)

Operating Loss

(1,902,441)

(1,318,249)

(6,473,547)

Other Income

56,565

62,621

78,945

Loss from equity accounted investment

-

(336)

(332)

Finance income

11,945

-

-

Finance costs

(12,363)

-

(22,303)

Loss before Tax

(1,846,294)

(1,255,964)

(6,417,237)

Tax

-

-

-

Loss for the period

(1,846,294)

(1,255,964)

(6,417,237)

Other comprehensive income:

Exchange differences on translating of foreign operations, net of taxes

579,500

673,457

152,635

Exchange differences reclassified on disposal of foreign operation

-

-

121,670

Total Comprehensive Loss for the Period

(1,266,794)

(582,507)

(6,142,932)

Loss for the period attributable to

(1,846,294)

(1,255,964)

 

(6,417,237)

Owners of the parent

(1,011,565)

(1,426,128)

(4,726,286)

Non-controlling interest

(834,729)

170,164

(1,690,951)

Total comprehensive loss attributable to

(1,266,794)

(582,507)

(6,142,932)

Owners of the parent

(432,065)

(752,671)

(4,451,981)

Non-controlling interest

(834,729)

170,164

(1,690,951)

Basic loss per share

4

(0.0004)

(0.001)

(0.003)

Diluted loss per share

4

(0.0004)

(0.001)

(0.003)

 

 

Unaudited Condensed Consolidated Interim Statement of Financial Position

As at 30 June 2021

 

Note

30 June

30 June

31 December

2021

2020

2020

(Unaudited)

(Unaudited)

 

(Audited)

£

£

£

Assets

Non-current assets

Property, plant and equipment

2,050

10,103

2,118

Intangible assets

7

18,491,105

18,491,105

18,491,105

Investment in associates

8

9,696,351

9,696,347

9,696,351

Other financial assets

9

-

443,362

-

Goodwill

300,000

300,000

300,000

Right of use asset

11

295,860

-

-

Total non-current assets

28,785,366

28,940,917

28,489,574

Current assets

Other financial assets

9

-

1,159,200

-

Other receivables

45,455

237,371

115,886

Cash and cash equivalents

4,882,121

68,612

256,760

Total current assets

4,927,576

1,465,183

372,646

Total assets

33,712,942

30,406,100

28,862,220

Equity

Called up share capital

5

20,631,196

19,564,383

20,411,493

Share premium

5

44,960,112

43,214,322

44,312,371

Common control reserve

(18,329)

(18,329)

(18,329)

Translation reserve

(19,137)

(199,485)

(598,637)

Share based payment reserve

1,952,969

1,118,630

1,728,487

Retained deficit

(38,001,194)

(36,052,082)

(39,019,856)

Attributable to equity holders of the parent

29,505,617

27,627,439

26,815,529

Non-controlling interest

2,242,907

441,173

(256,841)

Total Equity

31,748,524

28,068,612

26,558,688

Liabilities

Non-current liabilities

Lease liability

11

296,435

-

-

Total non-current liabilities

296,435

-

-

Current liabilities

Trade and other payables

1,166,160

1,730,873

1,444,986

Borrowings

10

499,401

606,615

858,546

Lease liability

11

2,422

-

-

Total current liabilities

1,667,983

2,337,488

2,303,532

Total liabilities

1,964,418

2,337,488

2,303,532

Total equity and liabilities

33,712,942

30,406,100

28,862,220

Unaudited Condensed Interim Consolidated Statement of Changes in Equity

 

Share

Capital

Share

Premium

Share based payment reserve

Control Reserve

Foreign currency translation reserve

Retained deficit

Non-controlling interest

Total

£

£

£

£

£

£

£

Balance at 31 December 2020 (audited)

20,411,493

44,312,371

1,728,487

(18,329)

(598,637)

(39,019,856)

(256,841)

26,558,688

Loss for the year allocated to equity owners

-

-

-

-

-

(1,011,565)

-

(1,011,565)

Loss for the period allocated to non-controlling interest

-

-

-

-

-

-

(834,729)

(834,729)

Other comprehensive income- translation of foreign operations

-

-

-

-

579,500

-

-

579,500

Issue of share capital

219,703

647,741

-

-

-

-

-

867,444

Acquisition of the Non-Controlling Interest without gaining control

-

-

-

-

-

(300,029)

300,029

-

Disposal of equity to Non-Controlling Interest without losing control

-

-

-

-

-

(3,034,448)

3,034,448

-

Changes in ownership interest in

subsidiaries without a change in control

-

-

-

-

-

5,354,486

-

5,354,486

Warrants and Share Options issued by Katoro Gold plc

-

-

234,700

-

-

-

-

234,700

Expirations of share warrants

-

-

(10,218)

-

-

10,218

-

-

Balance as at 30 June 2021(unaudited)

20,631,196

44,960,112

1,952,969

(18,329)

(19,137)

(38,001,194)

2,242,907

31,748,524

Balance at 1 January 2020 (audited)

19,532,350

42,750,436

1,504,513

(18,329)

(872,942)

(34,625,954)

27,073

28,297,147

Loss for the year

-

-

-

-

-

(1,426,128)

170,164

(1,255,964)

Other comprehensive income- translation of foreign operations

-

-

-

-

673,457

-

-

673,457

Issue of share capital

32,033

463,886

(421,471)

-

-

-

-

74,448

Equity contribution of minorities

-

-

-

-

-

-

243,936

243,936

Issue of share options or share warrants

-

-

35,588

-

-

-

-

35,588

Balance at 30 June 2020

19,564,383

43,214,322

1,118,630

(18,329)

(199,485)

(36,052,082)

441,173

28,068,612

Balance at 1 January 2020 (audited)

19,532,350

42,750,436

1,504,513

(18,329)

(872,942)

(34,625,954)

27,073

28,297,147

Loss for the year

-

-

-

-

-

(4,726,286)

(1,690,951)

(6,417,237)

Other comprehensive income - exchange differences

-

-

-

-

152,635

-

-

152,635

Shares issued

871,984

1,149,095

-

-

-

-

-

2,021,079

Shares issued to pay deferred vendor liability

7,159

412,840

(421,471)

-

-

-

-

(1,472)

Warrants issued by Katoro Gold plc

-

-

419,667

-

-

-

-

419,667

Share Options issued by Katoro Gold plc

-

-

225,778

-

-

-

-

225,778

Change in shareholding without a loss of control

-

-

-

-

-

332,384

1,407,037

1,739,421

Disposal of subsidiary

-

-

-

-

121,670

-

-

121,670

Balance at 31 December 2020 (audited)

20,411,493

44,312,371

1,728,487

(18,329)

(598,637)

(39,019,856)

(256,841)

26,558,688

Unaudited Condensed Consolidated Interim Statement of Cash Flow

For the six months ended 30 June 2021

 

6 months to

6 months to

12 months to

30 June

30 June

31 December

2021

2020

2020

(Unaudited)

(Unaudited)

(Audited)

£

£

£

Loss for the period before taxation

(1,846,294)

(1,255,964)

(6,417,237)

Adjusted for:

Other income

(56,565)

-

-

Warrants and options issued

-

35,588

697,006

Exploration and development expenditure on a Joint Operation

83,532

-

1,122,676

Expenses settled through share issues

310,369

-

436,076

Profit on sale of property, plant and equipment

-

-

(53,574)

(Profit)/Loss from the disposal of subsidiary

-

(28,400)

102,414

Impairment of other financial asset

-

-

640,821

Loss from equity accounting

-

336

332

Depreciation on property, plant and equipment

1,733

-

5,686

Operating income before working capital changes

(1,507,225)

(1,248,440)

(3,465,800)

Decrease in trade and other receivables

70,431

143,322

108,872

Increase/(Decrease) in trade and other payables

(278,826)

706,747

982,244

Net cash outflows from operating activities

(1,715,620)

(398,371)

(2,374,684)

Cash flows from financing activities

Proceeds from borrowings

-

792,800

1,370,000

Repayment of borrowings

(25,000)

-

-

Proceeds from issue of share capital

6,449,513

243,936

2,277,000

Net cash proceeds from financing activities

6,424,513

1,036,736

3,647,000

Cash flows from investing activities

Cash received/(forfeited) on disposal of subsidiary

-

(23,022)

76,716

Cash advanced to Joint Venture

(83,532)

(753,500)

(1,122,676)

Cash received on sale of plant and equipment

-

54,303

58,628

Net cash used in(out) from investing activities

(83,532)

(722,219)

(987,332)

Net movement in cash and cash equivalents

4,625,361

(83,854)

284,984

Cash and cash equivalents at beginning of period

256,760

91,634

91,634

Exchange movements

-

(60,832)

(119,858)

Cash and cash equivalents at end of period

4,882,121

68,612

256,760

 

Notes to the unaudited condensed consolidated interim financial statements

For the six months ended 30 June 2021

 

1. General information

 

Kibo Energy plc is a public company incorporated in Ireland. The condensed consolidated interim financial results consolidate those of the Company and its subsidiaries (together referred to as the "Group"). The Company's shares are listed on the AIM Market ("AIM") of the London Stock Exchange and the Alternative Exchange ("AltX") of the Johannesburg Stock Exchange ("JSE") Ltd. The principal activities of the Company and its subsidiaries are related to the development of energy projects in Mozambique, Botswana, Tanzania, South Africa and the United Kingdom.

 

2. Statement of Compliance and Basis of Preparation

 

The unaudited condensed consolidated interim financial results are for the six months ended 30 June 2021, and have been prepared using the same accounting policies as those applied by the Group in its December 2020 consolidated annual financial statements, which are in accordance with the framework concepts and the recognition and measurement criteria of the International Financial Reporting Standards and Financial Reporting Pronouncements as issued by the Financial Reporting Standards Council issued by the International Accounting Standards Board ("IASB"), including the SAICA Financial Reporting Guides as issued by the Accounting Practices Committee, IAS 34 - Interim Financial Reporting, the Listings Requirements of the JSE Ltd, the AIM rules of the London Stock Exchange and the Irish Companies Act 2014.

 

These condensed consolidated interim financial statements do not include all the notes presented in a complete set of consolidated annual financial statements, as only selected explanatory notes are included to explain key events and transactions that are significant to obtaining an understanding of the changes throughout the financial period, accordingly the report must be read in conjunction with the annual report for the year ended 31 December 2020.

 

The comparative amounts in the consolidated financial results include extracts from the consolidated annual financial statements for the period ended 31 December 2020.

 

These extracts do not constitute statutory accounts in accordance with the Irish Companies Act 2014. All monetary information is presented in the presentation currency of the Company being Pound Sterling. The Group's principal accounting policies and assumptions have been applied consistently over the current and prior comparative financial period.

 

3. Use of estimates and judgements

 

Preparing the condensed consolidated interim financial statements requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expenses. Actual results may differ from these estimates.

 

In preparing these condensed consolidated interim financial statements, significant judgements made by management in applying the Group's accounting policies and the key sources of estimation uncertainty were the same as those applied to the consolidated financial statements as at and for the year ended 31 December 2020.

 

 

 

4. Loss per share

 

Basic, dilutive and headline loss per share for the six months ended 30 June 2021 are as follows:

 

6 months to

6 months to

12 months to

30 June

30 June

31 December

2021

2020

2020

£

£

£

Loss for the year attributable to equity holders of the parent

(1,011,565)

(1,426,128)

(4,726,286)

Weighted average number of ordinary shares for the purposes of basic and dilutive loss per share

2,339,072,536

1,261,786,374

1,546,853,959

Basic loss per share

(0.0004)

(0.001)

(0.003)

Dilutive loss per share

(0.0004)

(0.001)

(0.003)

 

6 months to

6 months to

12 months to

Reconciliation of Headline loss per share

30 June

30 June

31 December

2021

2020

2020

£

£

£

Loss for the year attributable to equity holders of the parent

(1,011,565)

(1,426,128)

(4,726,286)

 

Adjusted for:

 

(Profit)/Loss on disposal of subsidiaries

-

28,400

102,414

 

Profit on disposal of motor vehicle

-

-

(53,574)

 

Headline loss per share

(1,011,565)

(1,397,728)

(4,677,446)

 

 

Weighted average number of ordinary shares for the purposes of headline loss per share

2,339,072,536

1,261,786,374

1,546,853,959

 

 

Headline loss per share

(0.0004)

(0.001)

(0.003)

 

Headline earnings per share (HEPS) is calculated using the weighted average number of ordinary shares in issue during the period and is based on the earnings attributable to ordinary shareholders, after excluding those items as required by Circular 1/2021 issued by the South African Institute of Chartered Accountants (SAICA).

 

 

5. Called up share capital and share premium

 

Ordinary share capital of the company is 5,000,000,000 ordinary shares of €0.001 each.

 

Deferred shares of the company is 1,000,000,000 of €0.014 and 3,000,000,000 of €0.009 respectively.

 

Authorised share capital of the company is 9,000,000 shares.

 

Details of issued share capital is as follows:

Number of

Ordinary

Share

Deferred Share

Share

 

shares

Capital

Capital

Premium

£

£

£

Balance at 31 December 2019

1,257,276,078

326,468

19,205,882

42,750,436

Shares issued in period (net of expensed for cash)

 

964,364,757

879,143

-

1,561,935

Balance at 31 December 2020

2,221,640,835

1,205,611

19,205,882

44,312,371

Warrants exercised

188,431,556

163,278

-

534,447

Shares issued to convert debt

65,276,346

56,425

-

113,294

Balance at 30 June 2021

2,475,348,737

1,425,314

19,205,882

44,960,112

The company issued the following ordinary shares during the period, with regard to key transactions:

 

- 65,276,346 new Kibo Shares were issued on 27 May 2021 of €0.001 each at a deemed issue price of £0.0026 per share to Sanderson Capital Partners Ltd ("Sanderson") in settlement of £169,718.50 of the total outstanding amount of £339,437 pursuant to the Forward Payment Facility signed between Sanderson and the Company in December 2016;

- 74,569,556 Company warrants to subscribe for 74,569,556 new Kibo shares under the terms of warrants announced on the 17 September 2020 were exercised on 3 March 2021 at a price of GBP 0.004 (0.4p) per warrant; and

- 50,000,889 Company warrants to subscribe for 50,000,889 new Kibo shares under the terms of warrants announced on the 17 September 2020 were exercised on 4 May 2021 at a price of GBP 0.004 (0.4p) per warrant.

- 24,000,000 and 7,500,000 Company warrants to subscribe for an aggregate 31,500,000 new Kibo shares under the terms of warrants announced on the 17 September 2020 were exercised on 19 February 2021 at a price of GBP 0.0025 (0.25p) and GBP 0.004 (0.4p) per warrant respectively.

 

 

As the remainder of the shares issued were in relation to smaller equity tranches these have not been disclosed.

 

6. Segment analysis

 

IFRS 8 requires an entity to report financial and descriptive information about its reportable segments, which are operating segments or aggregations of operating segments that meet specific criteria. Operating segments are components of an entity about which separate financial information is available that is evaluated regularly by the chief operating decision-maker.

 

The Chief Executive Officer is the chief operating decision maker of the Group.

 

Management currently identifies two divisions as operating segments - mining and corporate. These operating segments are monitored, and strategic decisions are made based upon them together with other non-financial data collated from exploration activities. Principal activities for these operating segments are as follows:

 

30 June 2021

Benga Power

Mabesekwa Independent Power

Mbeya Coal to Power

Mast Energy (£) Development

Haneti

Blyvoor

Corporate

30 June 2021 (£) Group

Revenue

-

-

-

-

-

-

-

-

Administrative cost

-

(806)

(4,968)

(275,445)

(5,084)

(4,228)

(761,917)

(1,052,448)

Exploration expenditure

-

-

(33,254)

(120,333)

(119,802)

(35,021)

(124,268)

(432,678)

Investment and other income

-

-

1,821

-

-

-

54,744

56,565

Capital raising fees

-

-

-

(260,878)

-

-

(156,437)

(417,315)

Loss from equity accounted investment

-

-

-

-

-

-

-

-

Finance income

-

-

-

-

-

-

11,945

11,945

Finance costs

-

-

-

(12,363)

-

-

-

(12,363)

Loss after tax

-

(806)

(36,401)

(669,019)

(124,886)

(39,249)

(975,933)

(1,846,294)

 

30 June 2020

Benga Power

Mabesekwa Independent Power

Mbeya Coal to Power

Mast Energy Development

Haneti

Lake Victoria Gold

Corporate

30 June 2020 (£) Group

Revenue

-

-

-

-

-

-

-

-

Administrative cost

-

(223,177)

-

(15,687)

(292)

-

(897,810)

(1,136,966)

Exploration expenditure

-

-

-

(123,000)

(26)

-

(58,257)

(181,283)

Investment and other income

-

54

-

-

-

-

62,567

62,621

Capital raising fees

-

-

-

-

-

-

-

-

Loss from equity accounted investment

-

-

-

-

-

-

(336)

(336)

Finance costs

-

-

-

-

-

-

-

-

Loss after tax

-

(223,123)

-

(138,687)

(318)

-

(893,836

(1,255,964)

 

 

30 June 2021

 

 

 

Benga Power

Mabesekwa Independent Power

Mbeya Coal to Power

 

Mast Energy Development

 

 

Haneti

 

 

Blyvoor

 

Corporate Group

 

30 June 2021 (£) Group

Assets

Segment assets

-

-

9,822

4,590,930

5,536

1,818

29,104,836

33,712,942

Liabilities

Segment liabilities

-

8,464

98,090

686,205

90,527

1,499

1,079,633

1,964,418

Depreciation

-

-

-

(1,733)

-

-

-

-

 

30 June 2020

 

 

Benga Power

 

Mabesekwa Independent Power

 

Mbeya Coal to Power

 

 

Mast Energy Development

 

 

 

Haneti

 

Lake Victoria Gold

 

 

Corporate Group

 

 

30 June 2020 (£) Group

Assets

Segment assets

-

218,912

-

-

2,244

-

30,184,944

30,406,100

Liabilities

Segment liabilities

2,150

622,301

69,876

372,694

6,223

-

1,264,244

2,337,488

Depreciation

-

-

-

-

-

-

-

-

 

7. Intangible assets

Composition of Intangible assets

30 June

30 June

31 December

2021

2020

2020

£

£

£

Mbeya Coal to Power Project

15,896,105

15,896,105

15,896,105

 

Mabesekwa Coal Independent Power Project

-

-

-

 

Bordersley Power Project

2,595,000

2,595,000

2,595,000

 

18,491,105

18,491,105

18,491,105

 

 

Intangible assets are not amortised, due to the indefinite useful life which is attached to the underlying prospecting rights, until such time that active mining operations commence, which will result in the intangible asset being amortised over the useful life of the relevant mining licences.

 

Intangible assets with an indefinite useful life are assessed for impairment on an annual basis, against the prospective fair value of the intangible asset. The valuation of intangible assets with an indefinite useful life is reassessed on an annual basis through valuation techniques applicable to the nature of the intangible assets.

 

As at reporting period end, taking into account the various applicable aspects, the Group concluded that none of the impairment indicators had been met in relation to the Mbeya Coal to Power Project or the Bordersley Power Project.

 

8. Investment in associate

 

30 June

30 June

31 December

2021

2020

2020

£

£

£

Mabesekwa Coal Independent Power Plant

9,696,351

9,696,347

9,696,683

 

Share of loss for the year

-

-

(332)

 

9,696,351

9,696,347

9,696,351

 

 

The value of the equity interest in Kibo Energy Botswana (Pty) Ltd was determined based on the fair value of the proportionate equity interest retained in the in the enlarged resource following the restructuring in 2019.

 

As at reporting period end, taking into account the various applicable aspects, the Group concluded that none of the impairment indicators had been met in relation to the Mabesekwa Coal Independent Power Plant project.

 

 

9. Other financial assets

30 June 2021

30 June 2020

31 December 2020

£

£

£

Other financial assets consists of:

At Amortised Cost:

Lake Victoria Gold Ltd

-

811,400

640,821

Blyvoor Joint Venture - Loans Advanced

-

753,501

-

At Fair value through profit or loss

-

-

Lake Victoria Gold Ltd

-

37,661

-

Impairment

-

-

(640,821)

-

1,602,562

-

 

Spilt of other financial assets between current and non-current portions

Current

-

443,362

-

Non-current

-

1,159,200

-

-

1,602,562

-

 

 

On 30 June 2020, the last condition precedent related to the disposal of Reef Miners Ltd ("Reef") as per the SPA, comprising the Imweru gold project and the Lubando gold project in northern Tanzania, was met resulting in the effective disposal of the subsidiary to Lake Victoria Gold Ltd ("LVG").

 

The following profit on disposal of the subsidiary was recognised in the audited annual report at 31 December 2020:

Group (£)

Intangible assets

787,108

Cash and cash equivalents

(336)

Trade and other payables

9,136

Net liability value disposed of at 31 December 2020

(778,308)

Foreign currency translation reserve reclassified through profit or loss

(121,670)

Proceeds from disposal

797,564

Profit on disposal for group

102,414

Impairment

(640,821)

Net loss on disposal for group at 31 December 2020

743,235

 

 

The amount receivable from Lake Victoria Gold will be due and payable on the following dates:

1. US$100,000 upon the satisfaction of the Condition Precedent;

2. US$100,000 upon registration of Reef in the name of LVG;

3. US$100,000 four months from the date of the SPA;

4. US$200,000 nine months from the date of the SPA; and

5. US$500,000 upon the earlier of the commissioning of the first producing mine of LVG in the Tanzania or the date 24 months from the date of the SPA.

 

As at 31 December 2020, funds of $100,000 have been received from Lake Victoria Gold in respect of the sale of Reef Miners Ltd ("Reef")

 

The receivable in Lake Victoria Gold has been fully impaired at 31 December 2020 due to the significant increase in credit risk, which is as a result of payments 1, 3 and 4 not being received as they became due and are still outstanding at the date of this interim report.

 

Blyvoor Joint Venture

 

On 30 January 2020, the Group entered into a Joint Venture Agreement with Blyvoor Gold Mines (Pty) Ltd, whereby Katoro Gold plc and Blyvoor Gold Mines (Pty) Ltd would become 50/50 participants in an unincorporated Joint Venture.

 

In accordance with the requirements of the Joint Venture Agreement, the Katoro Group was to provide a ZAR15.0 million loan (approximately £790,000) to the JV ("the Katoro Loan Facility"), which will fund ongoing development work on the Project.

 

As at 31 December 2020, the Group has advanced funding in the amount of £1,122,676 of which 100% relate to expenditure allocated to the Joint Venture operations, carried by the Katoro Gold plc Group.

 

Furthermore, the Group has continued to advance funding in the amount of £83,532 of which 100% relate to expenditure allocated to the Joint Venture operations, carried out by the Katoro Gold plc Group.

 

The Katoro Loan Facility shall form part of the development capital project financing that Katoro shall procure in accordance with its obligations contained in the Agreement, as detailed below, provided that:

· the balance of the Katoro Loan Facility then outstanding shall be subordinated to third party creditors participating in the development capital project financing;

· the Katoro Loan Facility will bear interest at the 12-month London Inter Bank Offered Rate, or its successor; and

· the Katoro Loan Facility will be repayable within 12 months after:

- the last third-party creditor participating in the project financing shall have been paid; or

- any earlier date on which the Parties may agree.

 

10. Borrowings

Amounts falling due within one year

30 June

30 June

31 December

2021

2020

2020

£

£

£

Short term borrowings

499,401

606,615

858,546

 

499,401

606,615

858,546

 

 

The borrowings relate to the unsecured interest free loan facility from Sanderson Capital Partners Ltd ("Sanderson") and St Anderton on the Vaal ("St Anderton") which is repayable either through the issue of cash or ordinary shares in the Company. Furthermore, the Sanderson loan balance has been partially settled in the current year through the issue of shares and a cash payment.

 

11. Right of use asset and Lease liability

 

The Group has one lease contract for land it shall utilise to construct a 5MW gas-fuelled power generation plant. The land is located at Bordersley, Liverpool Street, Birmingham. The lease of the land has a lease term of 20 years, with an option to extend for 10 years which the Group has opted to include due to the highly likely nature of extension as at the time of the original assessment. The Group's obligations under its leases are secured by the lessor's title to the leased assets. The Group's incremental borrowing rate implicit to the lease is 8.44%.

 

Right of use asset

30 June 2021(£)

30 June 2020(£)

31 December 2020(£)

Set out below are the carrying amounts of right-of-use assets recognised and the movements during the period:

 

Opening balance

-

-

-

Additions

297,593

-

-

Depreciation

(1,733)

-

-

Closing balance

295,860

-

-

 

 

Lease liability

 

30 June 2021(£)

30 June 2020(£)

31 December 2020(£)

Set out below are the carrying amounts of lease liabilities and the movements during the period:

Opening balance

-

-

-

Additions

297,594

-

-

Interest

12,363

-

-

Payments

(11,100)

-

-

Closing balance

298,857

-

-

Spilt of lease liability between current and non-current portions

Current

2,422

-

-

Non-current

296,435

-

-

298,857

-

-

 

12. Financial instruments

30 June

30 June

31 December

2021

2020

2020

£

£

£

Financial assets - carrying amount

 

At fair value through other comprehensive income

 

Other financial assets

-

37,661

-

 

Loans and receivables held at amortised cost

 

Other financial assets

-

1,564,901

-

 

Trade and other receivables

45,455

237,371

86,719

 

Cash and cash equivalents

4,882,121

68,612

256,760

 

4,927,576

1,908,545

343,479

 

 

Financial liabilities - carrying amount

Financial liabilities held at amortised cost

 

Trade and other payables

1,166,160

1,730,873

1,444,986

 

Borrowings

499,401

606,615

858,546

 

1,665,561

2,337,488

2,303,532

 

 

The Board of Directors considers that the fair values of financial assets and liabilities approximate their carrying values at each reporting date due to the short-term nature thereof, and market related interest rate applied.

 

13. Corporate transactions

 

During the current year to date, Kibo had diluted its equity interest in MAST Energy Developments plc, previously a wholly owned subsidiary, as MAST raised in excess of £5m through Clear Capital Markets Ltd from its IPO on the Official List of the London Stock Exchange plc by way of a Standard Listing. On the date of listing the market capitalisation for MAST Energy Developments plc was c. £23 million.

 

Furthermore, initially Kibo's equity holding measured at cost pre-IPO in MAST was £2,615,929 which increased substantially to £6,580,050 post-IPO when calculated as a portion of the net assets of MAST. Moreover, the current market value of Kibo's 55.42% interest in MAST is valued at c. £12 million, which is approximately twice the current valuation of Kibo.

 

14. Unaudited results

 

These condensed consolidated interim financial results have not been audited or reviewed by the Group's auditors.

 

15. Dividends

 

No dividends were declared during the interim period.

 

16. Board of Directors

 

There were no changes to the board of directors during the interim period, or any other committee's composition.

 

17. Subsequent events

 

The following subsequent events have been noted:

 

· MAST entered into a Sale and Purchase Agreement to acquire Pyebridge Power Ltd, a Special Purpose Vehicle comprising an installed and commissioned synchronous gas-powered standby generation facility with 9 MW export capacity.

 

· MAST entered into a definitive Sale and Purchase Agreement to acquire a 100% interest in Rochdale Power Ltd, a Special Purpose Vehicle from Balance Power Projects Ltd, for the installation of a 4.4 MW flexible gas power project.

 

· A period of limited political unrest in South Africa temporarily delayed the funding process for the Blyvoor Joint Venture Project when some of the short-listed parties requested additional time to re-assess the country risk profile as a result of the unrest. However, the Company is pleased to announce that discussions with these potential funders have since resumed and the joint venture partners hope to conclude a final funding arrangement for Blyvoor during the latter part of 2021.

 

· All conditions have been satisfied and an agreement completed with South Africa-based Industrial Green Energy Solutions (Pty) Ltd to jointly develop a portfolio of Waste to Energy projects in South Africa. Kibo and IGES have entered into an amendment (the "Amendment") to fast track the implementation of the first project. Completion of the Agreement and Amendment follows the positive findings of an extensive due diligence process.

 

· Completed a Heads of Terms (the "Agreement") with EQTEC plc (AIM: EQT) ("EQTEC"), a world-leading gasification solutions company, to acquire a 54.54% interest in the proposed 25 MWe Billingham waste gasification and power plant (the "Project") at Haverton Hill, Teesside, UK. The Project is at advanced stages of development with a concept design for the full plant produced, planning permission approved, grid connection offer secured.

 

 

18. Going concern

 

The Group currently generates no revenue and had net assets of £31,748,524 as at 30 June 2021 (31 December 2020: net assets of £26,558,688).

 

Following multiple warrant exercising and successful cash placings for the subscription of new ordinary shares, where the Group raised in cash an aggregate amount of £6,449,513 , the Group has adequate cash and cash equivalents (financial resources) to ensure the Group is able to continue as a going concern for the foreseeable future.

 

Furthermore, after reviewing the Group's financial projections, the directors of the Company (the "Directors") have a reasonable expectation that the Group will have adequate resources to continue in operational existence for the foreseeable future.

 

For this reason, they adopted the going concern basis in preparing the Group Financial Information.

 

The effective implementation of COVID-19 vaccination protocol within the key areas the Group operations has led to an increase in operational activity for the Group. As at the time of preparing these results, the Group does not anticipate any further significant foreseeable disruption from the COVID-19 pandemic and expects operational activities to normalise in the coming months.

 

Post period end there has been a period of limited political unrest in South Africa, however the impact on the Group's operations have been temporary and limited in this regard.

 

19. Commitments and contingencies

 

There are no material commitments, contingent assets or contingent liabilities as at 30 June 2021.

 

20. Seasonality of operations

 

The company's operations are not considered to be seasonal or cyclical. These interim results were therefore not impacted by seasonality or cyclicality.

 

24 September 2021

**ENDS**

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014 ("MAR").

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy plc

Chief Executive

Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate and Designated

Adviser on JSE

Claire Noyce

+44 (0) 20 3764 2341

Hybridan LLP

AIM Broker

Bhavesh Patel /

Stephen Allen

+44 20 3440 6800

RFC Ambrian

Ltd

NOMAD on AIM

Isabel de Salis /

Beth Melluish

+44 (0) 20 7236 1177

St Brides Partners

Ltd

Investor and Media

Relations Adviser

 

Notes

Kibo Energy plc is a multi-asset, Africa and UK focused, energy company positioned to address the acute power deficit, which is one of the primary impediments to economic development in Sub-Saharan Africa. To this end, it is the Company's objective to become a leading independent power producer in the region.

 

Kibo is simultaneously developing three similar coal-fuelled power projects: the Mbeya Coal to Power Project ("MCPP") in Tanzania; the Mabesekwa Coal Independent Power Project ("MCIPP") in Botswana; and the Benga Independent Power Project ("BIPP") in Mozambique. By developing these projects in parallel, the Company intends to leverage considerable economies of scale and timing in respect of strategic partnerships, procurement, equipment, human capital, execution capability / capacity and project finance.

 

Additionally, the Company has a 55% interest in MAST Energy Developments Limited ("MED"), a private UK registered company targeting the development and operation of flexible power plants to service the UK Reserve Power generation market.

 

Johannesburg

24 September 2021

Corporate and Designated Adviser River Group

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
IR USVSRAOUKURR
Date   Source Headline
8th May 20247:00 amRNSKibo Subsidiary Notice of Annual General Meeting
7th May 20247:00 amRNSKibo Subsidiary Business Update & Financing
30th Apr 20247:00 amRNSKibo Subsidiary MED Accounts’ Publication
26th Apr 20247:00 amRNSKibo Subsidiary Announces Business Update
23rd Apr 20242:30 pmRNSKibo Subsidiary Announces Major Shareholdings
11th Apr 20247:00 amRNSKibo Subsidiary MAST Announces Business Update
5th Mar 20247:00 amRNSIssue of Shares to Service Provider
4th Mar 202410:45 amRNSKibo Subsidiary Announces TR-1 Notification
28th Feb 20247:00 amRNSMAST New Funding Partner & Proventure Cancellation
21st Feb 20242:46 pmRNSHolding(s) in Company
20th Feb 20241:00 pmRNSKibo Subsidiary Announces TR-1 Notification
9th Feb 202412:45 pmRNSResults of Extraordinary General Meeting
5th Feb 20241:55 pmRNSKibo Subsidiary MAST Announces TR-1 Notification
31st Jan 202410:48 amRNSDirector/PDMR Shareholding
24th Jan 20243:45 pmRNSKibo Subsidiary MAST Announces TR-1 Notification
19th Jan 20241:52 pmRNSPDMR Share Sale
18th Jan 20247:00 amRNSNotice of Extraordinary General Meeting (“EGM”)
16th Jan 202410:50 amRNSCorrection on MED Shareholding
16th Jan 20247:00 amRNSKibo Strategy Update
11th Jan 20247:00 amRNSConversion, Equity Issue, TVR & Board Changes
8th Jan 20247:00 amRNSKibo Subsidiary Announces an Update on JVA
2nd Jan 20247:00 amRNSKibo Subsidiary - Further Update of Payment to JVA
22nd Dec 20237:00 amRNSKibo Subsidiary Announces JVA Completion Update
19th Dec 20232:00 pmRNSPDMR Share Sale
15th Dec 20237:00 amRNSSubsidiary Director Loan & PMDR Share Sale
11th Dec 20238:21 amRNSKibo Subsidiary Update JVA Completion Announcement
11th Dec 20237:00 amRNSMAST: Further Update to the Completion of JVA
7th Dec 20232:15 pmRNSResult of AGM
1st Dec 20237:00 amRNSKibo Subsidiary Announces Update of JVA
15th Nov 20237:00 amRNSNotice of AGM
13th Nov 20237:00 amRNSKibo UK Subsidiary JVA Interim Payment Update
26th Oct 20237:00 amRNSChange of Holding in Mast Energy Developments PLC
23rd Oct 20237:00 amRNSKibo Subsidiary - Update on the Completion of JVA
5th Oct 20237:00 amRNSPartial Settlement of Outstanding Shareholder Loan
4th Oct 20237:00 amRNSSale of Coal Interest in Botswana Power Project
29th Sep 20237:00 amRNSUnaudited Interim Results
22nd Sep 20237:00 amRNSKibo Subsidiary Announces Update on JVA Completion
1st Sep 20237:00 amRNSKibo Subsidiary Announces Further Update on JVA
25th Aug 20237:00 amRNSKibo Subsidiary MED Unaudited Interim Results
16th Aug 202310:10 amRNSClarification on Inaccurate Moneyweb Article
7th Aug 202310:25 amRNSDirector/PDMR Shareholding
4th Aug 20237:00 amRNSKibo Subsidiary Announces Update on JV Completion
31st Jul 20237:00 amRNSUpdate on MED Definitive and Binding JVA
24th Jul 20234:40 pmRNSTR-1: Notification of major holdings
12th Jul 20231:15 pmRNSKibo Subsidiary Announces Definitive & Binding JVA
3rd Jul 20237:00 amRNSOperational Update: Q2 2023
29th Jun 20237:00 amRNSAnnual Financial Report
16th Jun 20233:51 pmRNSHolding(s) in Company
2nd Jun 20232:30 pmRNSResults of EGM
26th May 202312:15 pmRNSWarrant Exercise

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.