Update on the Sonora Lithium Project Mexico

6 May 2014 07:01

RNS Number : 2986G
Rare Earth Minerals PLC
06 May 2014
 



 

 

 

 

 

6 May 2014

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Update on the Sonora Lithium Project, Mexico

 

Rare Earth Minerals Plc (LSE AIM: REM) is pleased to provide an update on recent exploration activities and technical progress on its joint ventures with Bacanora Minerals Ltd (TSX-V: BCN) on the Sonora Lithium Project in northern Mexico.

Highlights:

· Drilling and Exploration:

o El Sauz - Fleur Joint Venture:

§ Stage 3 drill program was recently completed on the El Sauz - Fleur concessions; and

§ Mapping and prospecting have discovered new clay exposures on the Fleur concession.

o Megalit Joint Venture:

§ Diamond drilling has commenced on the Penasco lithium clay prospect on the Megalit concession;

§ Mapping and prospecting have discovered new clay exposures on the Megalit concession; and

§ Trenching of lithium clay surface showings on the Buenavista concession will be initiated shortly as a part of the exploration programme on Megalit.

 

· Engineering and Pilot Plant:

§ After achieving lithium carbonate product with over 99.5% purity, engineering design work has been commissioned to scope and design a lithium carbonate plant with the capacity of 35,000 - 50,000 tones per year of lithium carbonate;

§ Pilot plant continues to produce lithium carbonate samples for potential buyers; and

§ Test work on the clay units from La Ventana and Sauz-Fleur areas was conducted in order to determine suitability for use in drilling mud.

 

David Lenigas, the Company's Chairman commented:

"Now that 99.5% battery grade lithium carbonate has been confirmed at Sonora, REM is pleased to see that engineering studies are now being initiated on a lithium carbonate plant of a size that could rank Sonora high on the list of potential significant global lithium producers. World production of lithium carbonate is currently running at over 150,000 tonnes of a year, with demand expected to double by 2020 through organic growth and growth in the Lithium-Ion battery market driven mainly by the electric vehicle industry.

"We continue to see excellent progress on both the exploration and technical fronts at Sonora. Drilling continues to better delineate the lithium deposit and we are now planning on stepping out quite significantly to test for further extensions of the deposit."

El Sauz and Fleur Concessions (Joint Venture #1) Update:

Stage 3 diamond drilling, consisting of 1,096.48 metres in 11 holes, was completed in April 2014, with analytical results having been recently received for 3 of the eleven holes. To date, a total of 4,997.51 metres have been drilled in 41 holes by the Company on the Fleur and El Sauz concessions ("Joint Venture #1"). Results for significant lithium intercepts in Stage 3 holes for which analyses have been received varied from 1,369 ppm Li to 3,623 ppm Li across 6.63 metres and 15.24 metres respectively in the Upper Clay unit and from 1,713 to 4,997 ppm Li across 17.37 metres and 34.14 metres respectively in the Lower Clay unit (Table 1).

Table 1. Significant Lithium Analyses Stage 3 Holes to Date

Hole

Unit

From (m)

To (m)

Length (m)

Li ppm

LCE %

ES-31

Upper Clay

17.91

27.99

10.08

1,472

0.78

Including

22.10

27.13

5.03

2,218

1.18

Upper Clay

43.89

59.13

15.24

3,623

1.93

Lower Clay

69.49

103.63

34.14

4,997

2.66

ES-35

Upper Clay

93.35

99.97

6.63

1,369

0.73

Lower Clay

106.68

124.05

17.37

1,713

0.91

 

Mapping and prospecting on the Joint Venture #1 lands has continued to be productive, resulting in the discovery of new lithium-bearing clay showings that have potential to significantly increase the lithium resource on the lands under joint venture. Further testing of these new zones will be undertaken as a part of the current program. In addition, trenching of surface exposures on El Sauz will be undertaken once the current drilling has finished.

San Gabriel, Buena Vista and Megalit Concessions (Joint Venture #2) Update:

Diamond drilling has commenced to test a new lithium bearing clay prospect, Penasco, located on the Megalit concession, to the south of El Sauz. In addition, a new clay occurrence, Cieneguita, to the east of the Penasco prospect will be drill tested. The seven hole, 1,500 metre diamond drill program is expected to be completed in late May with results to follow in late June.

In conjunction with the drilling, mapping and prospecting will continue on the large (94,815 hectare) Megalit concession in order to locate and sample additional exposures of the lithium-bearing clay basin. Trenching is also planned for lithium-bearing clays exposed in a northerly striking direction along 6 kilometres on the Buenavista concession. Previous sampling by Bacanora returned lithium values ranging from 121 to 1,350 ppm Li from surface clay samples collected on Buenavista.

Engineering and Lithium Pilot Plant Update:

In conjunction with the ongoing surface work at the Sonora Lithium Project, initial engineering design work is being initiated by independent contractors for a lithium carbonate plant capable of producing between 35,000 - 50,000 tonnes per year of lithium carbonate. The combined La Ventana, El Sauz and Fleur concessions have been estimated to contain inferred lithium resources totalling 148,271,000 tonnes averaging 3,097 ppm Li, a resource potential equivalent to 2.45 million tonnes of lithium carbonate, assuming no process losses and 100% recovery of lithium from the clays. Bulk samples continue to be processed at the pilot plant in Hermosillo in order to produce lithium carbonate samples for prospective buyers.

In addition, clay samples have been submitted to Grinding Solutions Ltd, a metallurgical and mineral processing consultancy and laboratory Services Company based in the UK. Initial test work on the clays from the Sonora Lithium Project have been undertaken to determine suitability for petroleum drilling muds. Preliminary results indicate that a commercial drilling mud product could potentially be produced from the clays. Grinding Solutions has recommended further tests be carried out in order to formulate a process for the production of a marketable drilling mud product.

About REM's interests in the Sonora Lithium Project:

REM has a 30% interest in the Bacanora subsidiary that owns the contiguous El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions (the "Joint Venture #1 Lands") under joint venture with Bacanora. Inferred lithium resources for the El Sauz and Fleur concessions total 88,271,000 tonnes, averaging 3,163 ppm Li at a 2,000 ppm cut-off (1.68% lithium carbonate equivalent assuming 100% recovery and no process losses). The resource on the Joint Venture #1 Lands is open down dip to the east and to the south. For further details concerning the Company's first agreement with REM and details of Joint Venture #1, please refer to the Company's press release dated May 22, 2013. REM has a 10% interest in the Bacanora subsidiary that will hold the Buenavista, Megalit and San Gabriel concessions which are subject to an agreement (Joint Venture #2) with Bacanora in which REM has rights to acquire up to a 30% interest - for details on this agreement please refer the Company's press release dated March 13, 2014.

 

REM has a [6.1%] of Bacanora where Inferred resources have also been estimated for the La Ventana Lithium Deposit totaling 60 million tonnes, averaging 3,000 ppm Li (equivalent to 1.6% lithium carbonate equivalent assuming 100% recovery and no process losses).

Qualified Person's Statement:

Information in this announcement relates to information compiled by Carl G Verley, P.Geo, a consultant to the Company, who is a member of the Association of Professional Engineers and Geoscientists of British Columbia and is a Qualified Person with respect to the information disclosed herein.

- Ends -

 

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 207 220 1666

James Joyce

Nick Field

 

Hume Capital plc (Joint Broker) +44 (0) 203 693 1470

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQKPDKDBKBDPK
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.