Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.50    0.00 (0.00%)
Bid:
6.00
Ask:
7.00
Spread: 1.00 (16.667%)
Market Cap: £26.60m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project Update

10 Feb 2014 07:00

RNS Number : 6339Z
Rare Earth Minerals PLC
10 February 2014
 



10 February 2014

 

RARE EARTH MINERALS PLC

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project Update

Rare Earth Minerals PLC (AIM: REM) is pleased to announce significant progress on the Fleur Sauz Lithium Project in northern Mexico.

 

Highlights:

· Stage 2 drilling programme completed.

· Drill rig retained for further drilling to infill the current Lithium resource and extend the resource further in preparation for the pre-feasibility study.

· Metallurgical pilot plant due to be commissioned in 6 weeks and the JV is optimistic of successfully achieving battery grade Lithium Carbonate.

· Drilling is now planned to test the new Megalit Concession.

 

David Lenigas, The Company's Chairman, commented:

 

"REM are pleased that the drill rig has been retained in Mexico to continue to test for the limits of the Lithium mineralisation in this new Lithium Province. The Stage 2 drilling programme has proved very successful and should add significant value to the Fleur Sauz Lithium Project when all the results are received and factored in to the pre-feasibility study within the coming months."

"REM is also pleased that the metallurgical recovery test work is progressing well and that the recovery of battery grade Lithium Carbonate is now considered achievable."

 

Fleur Sauz Lithium Project Update:

Drilling:

Bacanora Minerals Limited has advised that the Stage 2 drilling programme has now been completed on the Fleur Sauz joint Venture lands.

Due to the success of the Stage 2 drilling programme, the drill rig has been retained for an infill drilling programme in the southern portion of Sauz claim over the next month with about 1,000 metres of core-drilling in 5 to 6 holes in order to upgrade the resources from the inferred to indicated category in preparation of the pre-feasibility study.

Drilling activities will then move to the new Megalit Concession in the southernmost recognized drill target called Perdices-Peñasco area, which is located about 7 km south of Sauz on the Megalit claim.

A trenching program will commence shortly in the Buenavista claim area, where >1,300 ppm Lithium grades have now been obtained in surface samples on a +40 m thick clay sequence exposed in the south-central portion of the claim.

 

Metallurgy Update:

Due to the encouraging results of the bench-scale test work, the construction of the Lithium Carbonate pilot plant has begun and is expected to be operational in approximately 6 weeks. Test work is also being conducted in parallel by Inspectorate in Canada and results from both facilities will be certified by Inspectorate.

Results to date from work carried out in our pilot plant and by Inspectorate at their facility in Vancouver, Canada, have been very encouraging and the goal of producing battery grade lithium carbonate is now considered as achievable.

 

- Ends -

 

For further information please contact:

 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUGUPUPCPPB
Date   Source Headline
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSUpdate on the Amapa Iron Ore Project
9th Feb 20217:00 amRNSMacarthur signs MOU with Southern Ports Authority
2nd Feb 20211:04 pmRNSEMH Cinovec Project - Drilling Update
27th Jan 20212:34 pmRNSForm TR1
12th Jan 20211:03 pmRNSExercise of Warrants
8th Jan 20217:00 amRNSResult of AGM
30th Dec 20207:00 amRNSForm TR1
23rd Dec 20202:37 pmRNSExercise of Warrants
14th Dec 20207:00 amRNSNotice of Annual General Meeting
4th Dec 202010:49 amRNSDirector Share Purchases
20th Nov 202012:43 pmRNSDirector Share Purchases
16th Nov 20203:58 pmRNSYangibana Drilling Extends Simons Find
13th Nov 20202:10 pmRNSExercise of Warrants and Conversion of Loan Note
12th Nov 20209:53 amRNSDirector Share Purchases
10th Nov 20206:21 pmRNSAdmission of Shares
10th Nov 20209:31 amRNSDirector Share Purchases
9th Nov 202010:54 amRNSDirector Share Purchases
4th Nov 202010:18 amRNSDirector Share Purchases and Exercise of Options
2nd Nov 20207:06 amRNSEmployee Benefit Trust and Share Incentive Plan
2nd Nov 20207:04 amRNSUpdated Mineral Resource Estimate - Amapa Iron Ore
2nd Nov 20207:00 amRNSAmapa Iron Ore Project - Update
13th Oct 202011:18 amRNSOutstanding Yangibana Drill Results
2nd Oct 20203:48 pmRNSMacarthur Lake Giles Magnetite Mineral Resource
23rd Sep 202010:02 amRNSEuropean Metals Appoints Lead Engineer at Cinovec
21st Sep 20204:41 pmRNSSecond Price Monitoring Extn
21st Sep 20204:36 pmRNSPrice Monitoring Extension
17th Sep 202010:22 amRNSExcellent Drill Results at Yangibana
10th Sep 20209:04 amRNSBacanora Sonora and Lithium Market Update
2nd Sep 20202:42 pmRNSMacarthur Minerals Develops Port Rail Solution
2nd Sep 202012:09 pmRNSAgreement in Principle to Bank Creditor Settlement
28th Aug 20209:38 amRNSInterim Results
26th Aug 202010:34 amRNSHastings Technology Metals Placement Raises $14.6m
26th Aug 20207:00 amRNSUpdate on Investment in the Amapa Iron Ore Project
21st Aug 20201:40 pmRNSMacarthur JV Partner Acquires Iron Ore Project
21st Aug 20207:00 amRNSPlacing to Raise £1.25 million
17th Aug 20204:41 pmRNSSecond Price Monitoring Extn
17th Aug 20204:35 pmRNSPrice Monitoring Extension
14th Aug 20201:04 pmRNSExercise of Warrants
12th Aug 20208:34 amRNSMacarthur Moonshine Magnetite Resource Upgrade
11th Aug 20207:00 amRNSAmapa Update
10th Aug 20209:49 amRNSEMH Commences Cinovec Drilling Programme
29th Jul 20209:40 amRNSYangibana Project Costs Reduced By A$68m Or 13%
29th Jul 20209:35 amRNSA$68m Capex Reduction at Yangibana Project
29th Jul 20207:00 amRNSMacarthur Minerals engages RCR Rail Technology
28th Jul 20202:05 pmRNSSecond Price Monitoring Extn
28th Jul 20202:00 pmRNSPrice Monitoring Extension
28th Jul 20201:55 pmRNSChange of Registered Address

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.