Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.50    -0.66 (-9.43%)
Bid:
6.00
Ask:
7.00
Spread: 1.00 (16.667%)
Market Cap: £25.95m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project Update

10 Feb 2014 07:00

RNS Number : 6339Z
Rare Earth Minerals PLC
10 February 2014
 



10 February 2014

 

RARE EARTH MINERALS PLC

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project Update

Rare Earth Minerals PLC (AIM: REM) is pleased to announce significant progress on the Fleur Sauz Lithium Project in northern Mexico.

 

Highlights:

· Stage 2 drilling programme completed.

· Drill rig retained for further drilling to infill the current Lithium resource and extend the resource further in preparation for the pre-feasibility study.

· Metallurgical pilot plant due to be commissioned in 6 weeks and the JV is optimistic of successfully achieving battery grade Lithium Carbonate.

· Drilling is now planned to test the new Megalit Concession.

 

David Lenigas, The Company's Chairman, commented:

 

"REM are pleased that the drill rig has been retained in Mexico to continue to test for the limits of the Lithium mineralisation in this new Lithium Province. The Stage 2 drilling programme has proved very successful and should add significant value to the Fleur Sauz Lithium Project when all the results are received and factored in to the pre-feasibility study within the coming months."

"REM is also pleased that the metallurgical recovery test work is progressing well and that the recovery of battery grade Lithium Carbonate is now considered achievable."

 

Fleur Sauz Lithium Project Update:

Drilling:

Bacanora Minerals Limited has advised that the Stage 2 drilling programme has now been completed on the Fleur Sauz joint Venture lands.

Due to the success of the Stage 2 drilling programme, the drill rig has been retained for an infill drilling programme in the southern portion of Sauz claim over the next month with about 1,000 metres of core-drilling in 5 to 6 holes in order to upgrade the resources from the inferred to indicated category in preparation of the pre-feasibility study.

Drilling activities will then move to the new Megalit Concession in the southernmost recognized drill target called Perdices-Peñasco area, which is located about 7 km south of Sauz on the Megalit claim.

A trenching program will commence shortly in the Buenavista claim area, where >1,300 ppm Lithium grades have now been obtained in surface samples on a +40 m thick clay sequence exposed in the south-central portion of the claim.

 

Metallurgy Update:

Due to the encouraging results of the bench-scale test work, the construction of the Lithium Carbonate pilot plant has begun and is expected to be operational in approximately 6 weeks. Test work is also being conducted in parallel by Inspectorate in Canada and results from both facilities will be certified by Inspectorate.

Results to date from work carried out in our pilot plant and by Inspectorate at their facility in Vancouver, Canada, have been very encouraging and the goal of producing battery grade lithium carbonate is now considered as achievable.

 

- Ends -

 

For further information please contact:

 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUGUPUPCPPB
Date   Source Headline
13th Apr 20238:56 amRNSNotice of Substantial Shareholder in Evergreen
1st Mar 20237:00 amRNSCorporate Update
30th Jan 202311:47 amRNSEuropean Metals Announcement: Just Transition Fund
26th Jan 20238:26 amRNSListing of Evergreen Lithium on the ASX
25th Jan 20238:35 amRNSCompletion of Sale of Yangibana JV Interest
10th Jan 20232:05 pmRNSSecond Price Monitoring Extn
10th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSDirector Share Purchases
3rd Jan 20237:00 amRNSCompletion of PFS on Amapá Iron Ore Project
30th Dec 20227:00 amRNSCorporate Update
31st Oct 20229:00 amRNSInvestment Update
7th Oct 20227:00 amRNSMineral Resource Increase & Upgrade Amapá Project
28th Sep 20227:00 amRNSInterim Results for six months ended 30 June 2022
10th Aug 20223:50 pmRNSResult of AGM
12th Jul 20227:00 amRNSDirector Share Purchases
7th Jul 20222:58 pmRNSNotice of AGM
27th Jun 20227:00 amRNSCompletion of LT & LS sale & Amapa Project Update
23rd Jun 20227:00 amRNSSale of Yangibana JV Interest to Hastings
21st Jun 20227:00 amRNSAnnual Results for the year ended 31 December 2021
25th Apr 20228:53 amRNS4th Amapa Iron Ore Shipment Completed & En Route
19th Apr 20227:00 amRNSExercise of Warrants
11th Apr 202211:14 amRNSDirector Share Purchases
7th Apr 20229:50 amRNSCommencement of Shipment of Iron Ore from Amapa
30th Mar 20227:00 amRNSConditional Sale Agreement of its Stake in LT & LS
21st Mar 20227:00 amRNSPFS Update for the Amapa Project
15th Mar 20229:28 amRNSCadence completes to vest its 27% in Amapa Project
21st Feb 20223:42 pmRNSResult of Open Offer
21st Feb 20227:00 amRNSYangibana Project NPV Increases 84% to A$1bn
7th Feb 20227:00 amRNSAmapa - Formal Completion & Vesting of 20%
4th Feb 20221:45 pmRNSOpen Offer and Posting of Circular
3rd Feb 20229:05 amRNSSecond Price Monitoring Extn
3rd Feb 20229:00 amRNSPrice Monitoring Extension
3rd Feb 20227:00 amRNSResult of Placing & Subscription and TVR
2nd Feb 20224:40 pmRNSProposed Placing
2nd Feb 20221:54 pmRNSNAIF A$140m Loan - Yangibana Rare Earths Project
19th Jan 20222:05 pmRNSEMH Cinovec PFS Update - Outstanding Results
14th Jan 20227:00 amRNSProject & Corporate Updates. Presentation Q&A
5th Jan 20227:00 amRNSQuestions for Investor Q&A Session
29th Dec 202111:06 amRNSSecond Price Monitoring Extn
29th Dec 202111:00 amRNSPrice Monitoring Extension
29th Dec 20219:06 amRNSSecond Price Monitoring Extn
29th Dec 20219:00 amRNSPrice Monitoring Extension
29th Dec 20217:00 amRNSAmapa Iron Ore Project Update
25th Nov 202111:45 amRNSCastillo Extends Option Over Lithium Projects
22nd Nov 20218:57 amRNSCastillo Copper Picasso Lithium Project Update
1st Nov 20219:01 amRNSPort Concession Update, Amapa Project
27th Oct 20219:50 amRNSCastillo - Picasso Lithium Project Site Visit
20th Oct 202111:43 amRNSLitchfield Lithium surface sampling by Castillo
13th Oct 202110:27 amRNSEuropean Metals Cinovec Resource Upgrade
11th Oct 202111:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.