If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.20    -0.40 (-7.27%)
Bid:
4.90
Ask:
5.50
Spread: 0.60 (12.245%)
Market Cap: £20.87m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project Update

10 Feb 2014 07:00

RNS Number : 6339Z
Rare Earth Minerals PLC
10 February 2014
 



10 February 2014

 

RARE EARTH MINERALS PLC

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project Update

Rare Earth Minerals PLC (AIM: REM) is pleased to announce significant progress on the Fleur Sauz Lithium Project in northern Mexico.

 

Highlights:

· Stage 2 drilling programme completed.

· Drill rig retained for further drilling to infill the current Lithium resource and extend the resource further in preparation for the pre-feasibility study.

· Metallurgical pilot plant due to be commissioned in 6 weeks and the JV is optimistic of successfully achieving battery grade Lithium Carbonate.

· Drilling is now planned to test the new Megalit Concession.

 

David Lenigas, The Company's Chairman, commented:

 

"REM are pleased that the drill rig has been retained in Mexico to continue to test for the limits of the Lithium mineralisation in this new Lithium Province. The Stage 2 drilling programme has proved very successful and should add significant value to the Fleur Sauz Lithium Project when all the results are received and factored in to the pre-feasibility study within the coming months."

"REM is also pleased that the metallurgical recovery test work is progressing well and that the recovery of battery grade Lithium Carbonate is now considered achievable."

 

Fleur Sauz Lithium Project Update:

Drilling:

Bacanora Minerals Limited has advised that the Stage 2 drilling programme has now been completed on the Fleur Sauz joint Venture lands.

Due to the success of the Stage 2 drilling programme, the drill rig has been retained for an infill drilling programme in the southern portion of Sauz claim over the next month with about 1,000 metres of core-drilling in 5 to 6 holes in order to upgrade the resources from the inferred to indicated category in preparation of the pre-feasibility study.

Drilling activities will then move to the new Megalit Concession in the southernmost recognized drill target called Perdices-Peñasco area, which is located about 7 km south of Sauz on the Megalit claim.

A trenching program will commence shortly in the Buenavista claim area, where >1,300 ppm Lithium grades have now been obtained in surface samples on a +40 m thick clay sequence exposed in the south-central portion of the claim.

 

Metallurgy Update:

Due to the encouraging results of the bench-scale test work, the construction of the Lithium Carbonate pilot plant has begun and is expected to be operational in approximately 6 weeks. Test work is also being conducted in parallel by Inspectorate in Canada and results from both facilities will be certified by Inspectorate.

Results to date from work carried out in our pilot plant and by Inspectorate at their facility in Vancouver, Canada, have been very encouraging and the goal of producing battery grade lithium carbonate is now considered as achievable.

 

- Ends -

 

For further information please contact:

 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUGUPUPCPPB
Date   Source Headline
28th Aug 20154:35 pmRNSPrice Monitoring Extension
28th Aug 20157:00 amRNSSonora Project Signs Lithium Supply Contract
25th Aug 20158:48 amRNSHolding(s) in Company
19th Aug 201511:58 amRNSYangibana REE Project Update
12th Aug 201511:55 amRNSUpdate on Yangibana Rare Earths Element Project
31st Jul 20157:00 amRNSAppointment of Director
24th Jul 201512:00 pmRNSResult of AGM
17th Jul 20152:00 pmRNSHolding(s) in Company
8th Jul 20157:00 amRNSREM increases interest in European Lithium Project
8th Jul 20157:00 amRNSSonora Lithium Project Update
1st Jul 201510:30 amRNSNotice of AGM and Posting of Results
1st Jul 201510:23 amRNSREM increases interest in European Lithium Project
1st Jul 20157:00 amRNSWestern Lithium Announces Merger
29th Jun 20157:30 amRNSFiling of Technical Report, Sonora Lithium Project
25th Jun 20157:00 amRNSResults for the year ended 31 December 2014
24th Jun 20157:00 amRNSHolding(s) in Company
23rd Jun 20153:33 pmRNSREM acquires strategic interest in Lithium Project
17th Jun 20157:27 amRNSWestern Lithium Continues Optimisation Studies
10th Jun 20152:04 pmRNSREM increases strategic holding in Bacanora
9th Jun 201512:50 pmRNSREM increases strategic holding in Bacanora
5th Jun 20157:00 amRNSSonora Lithium and Borates Project Update
28th May 20157:00 amRNSHolding(s) in Company
22nd May 20157:00 amRNSSonora Lithium Project Drilling Results
14th May 20157:00 amRNSUpdate in Lithium Resources for the Sonora Project
22nd Apr 20157:00 amRNSDirectorate Change
21st Apr 20154:53 pmRNSHolding(s) in Company
21st Apr 201511:37 amRNSHolding(s) in Company
9th Apr 201510:46 amRNSREM increases strategic holding in Bacanora
8th Apr 20157:01 amRNSUpdate on Yangibana Rare Earths Element Project
1st Apr 20154:35 pmRNSPrice Monitoring Extension
25th Mar 20157:15 amRNSSonora Lithium Project Update
25th Mar 20157:14 amRNSYangibana Update
20th Mar 20157:00 amRNSREM's Chairman joins the board of Bacanora
17th Mar 20157:00 amRNSSRK Consulting contracted to Sonora Project
13th Mar 20154:28 pmRNSHolding(s) in Company
9th Mar 20159:15 amRNSUpdate on Yangibana Rare Earths Element Project
4th Mar 201510:55 amRNSHolding(s) in Company
4th Mar 20157:00 amRNSREM's Chairman to join the board of Bacanora
3rd Mar 20152:36 pmRNSHolding(s) in Company
3rd Mar 20157:40 amRNSREM increases strategic holding in Bacanora
2nd Mar 201511:03 amRNSUpdate on Mexico Investments
25th Feb 20157:17 amRNSWestern Lithium Produces First High Purity Lithium
19th Feb 201512:00 pmRNSHolding(s) in Company
19th Feb 20157:00 amRNSREM increases strategic holding in Bacanora
17th Feb 20151:38 pmRNSHolding(s) in Company
16th Feb 20154:34 pmRNSREM increases strategic holding in Bacanora
12th Feb 20156:12 pmRNSREM increases strategic holding in Bacanora
12th Feb 20157:00 amRNSREM Requisitions Meeting of Bacanora
27th Jan 20157:00 amRNSFull Scoping Study & Updated Company Presentation
22nd Jan 201511:35 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.