If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
5.20    -0.30 (-5.45%)
Bid:
4.90
Ask:
5.50
Spread: 0.60 (12.245%)
Market Cap: £21.28m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project Update

10 Feb 2014 07:00

RNS Number : 6339Z
Rare Earth Minerals PLC
10 February 2014
 



10 February 2014

 

RARE EARTH MINERALS PLC

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project Update

Rare Earth Minerals PLC (AIM: REM) is pleased to announce significant progress on the Fleur Sauz Lithium Project in northern Mexico.

 

Highlights:

· Stage 2 drilling programme completed.

· Drill rig retained for further drilling to infill the current Lithium resource and extend the resource further in preparation for the pre-feasibility study.

· Metallurgical pilot plant due to be commissioned in 6 weeks and the JV is optimistic of successfully achieving battery grade Lithium Carbonate.

· Drilling is now planned to test the new Megalit Concession.

 

David Lenigas, The Company's Chairman, commented:

 

"REM are pleased that the drill rig has been retained in Mexico to continue to test for the limits of the Lithium mineralisation in this new Lithium Province. The Stage 2 drilling programme has proved very successful and should add significant value to the Fleur Sauz Lithium Project when all the results are received and factored in to the pre-feasibility study within the coming months."

"REM is also pleased that the metallurgical recovery test work is progressing well and that the recovery of battery grade Lithium Carbonate is now considered achievable."

 

Fleur Sauz Lithium Project Update:

Drilling:

Bacanora Minerals Limited has advised that the Stage 2 drilling programme has now been completed on the Fleur Sauz joint Venture lands.

Due to the success of the Stage 2 drilling programme, the drill rig has been retained for an infill drilling programme in the southern portion of Sauz claim over the next month with about 1,000 metres of core-drilling in 5 to 6 holes in order to upgrade the resources from the inferred to indicated category in preparation of the pre-feasibility study.

Drilling activities will then move to the new Megalit Concession in the southernmost recognized drill target called Perdices-Peñasco area, which is located about 7 km south of Sauz on the Megalit claim.

A trenching program will commence shortly in the Buenavista claim area, where >1,300 ppm Lithium grades have now been obtained in surface samples on a +40 m thick clay sequence exposed in the south-central portion of the claim.

 

Metallurgy Update:

Due to the encouraging results of the bench-scale test work, the construction of the Lithium Carbonate pilot plant has begun and is expected to be operational in approximately 6 weeks. Test work is also being conducted in parallel by Inspectorate in Canada and results from both facilities will be certified by Inspectorate.

Results to date from work carried out in our pilot plant and by Inspectorate at their facility in Vancouver, Canada, have been very encouraging and the goal of producing battery grade lithium carbonate is now considered as achievable.

 

- Ends -

 

For further information please contact:

 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUGUPUPCPPB
Date   Source Headline
26th Oct 20179:30 amRNSAuroch Minerals Update
20th Oct 20171:32 pmRNSMacarthur Minerals Update
19th Oct 20171:10 pmRNSMacarthur Minerals Update
13th Oct 20172:27 pmRNSUpdate - Macarthur Minerals
12th Oct 20171:59 pmRNSUpdate - Macarthur Minerals
4th Oct 20173:57 pmRNSUpdate - Macarthur Minerals
4th Oct 20171:19 pmRNSUpdate - Auroch Minerals
3rd Oct 201711:33 amRNSUpdate - European Metals Holdings
29th Sep 20177:00 amRNSInterim Results
28th Sep 20172:18 pmRNSUpdate - Macarthur Minerals
18th Sep 201712:35 pmRNSUpdate - Auroch Minerals
13th Sep 20179:27 amRNSYangibana - Update
12th Sep 20172:59 pmRNSMacarthur Minerals - Update
12th Sep 201710:01 amRNSUpdate - Auroch Minerals
8th Sep 20174:53 pmRNSHolding(s) in Company
7th Sep 20171:28 pmRNSPartial sale of stake in Bacanora Minerals
5th Sep 20179:46 amRNSUpdate - Clancy Exploration
4th Sep 20179:49 amRNSUpdate - Auroch Minerals
1st Sep 201710:24 amRNSYangibana Update
31st Aug 20174:36 pmRNSUpdate - Macarthur Minerals
29th Aug 20175:07 pmRNSUpdate - Macarthur Minerals
29th Aug 20174:03 pmRNSResult of AGM
24th Aug 20179:22 amRNSUpdate - Bacanora Minerals
24th Aug 20179:05 amRNSUpdate - Auroch Minerals
21st Aug 20171:31 pmRNSMacarthur Minerals Update
21st Aug 20179:22 amRNSUpdate - Yangibana
21st Aug 20179:07 amRNSCleansing Statement
16th Aug 201710:53 amRNSEMH - Drill Results, Appointment and Equity Issue
15th Aug 201711:55 amRNSUpdate - Auroch Minerals
14th Aug 20171:29 pmRNSUpdate - Macarthur Minerals
14th Aug 201710:36 amRNSUpdate - Auroch Minerals
10th Aug 20179:02 amRNSUpdate - Auroch Minerals
7th Aug 201711:44 amRNSNotice of AGM
1st Aug 20178:40 amRNSYangibana Update
25th Jul 20171:40 pmRNSMacarthur Minerals Update
11th Jul 20171:39 pmRNSMacarthur Minerals Update
4th Jul 20171:32 pmRNSCinovec Maiden Ore Reserve - Further Information
3rd Jul 201710:00 amRNSAuroch Minerals Update
3rd Jul 20178:58 amRNSAustrian Cobalt Project - Update
27th Jun 201712:23 pmRNSInfill Drilling Commenced at Cinovec Project
21st Jun 201711:45 amRNSYangibana Update
19th Jun 20179:15 amRNSLive Webinar
19th Jun 20177:00 amRNSLive Webinar
15th Jun 20172:19 pmRNSMacarthur Minerals Update
15th Jun 20178:00 amRNSInvestment in Austrian Leogang Project
6th Jun 20172:06 pmRNSMacarthur Minerals Update
5th Jun 20179:12 amRNSHolding(s) in Company
1st Jun 20171:48 pmRNSMacarthur Minerals Update
31st May 20177:00 amRNSResults for the year ended 31 December 2016
25th May 20179:23 amRNSUpdate on Cinovec Lithium/Tin Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.