Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.24    0.00 (0.00%)
Bid:
6.00
Ask:
6.50
Spread: 0.50 (8.333%)
Market Cap: £25.54m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Mexico Lithium Project Update

10 Feb 2014 07:00

RNS Number : 6339Z
Rare Earth Minerals PLC
10 February 2014
 



10 February 2014

 

RARE EARTH MINERALS PLC

("Rare Earth Minerals", "REM" or "the Company")

 

Mexico Lithium Project Update

Rare Earth Minerals PLC (AIM: REM) is pleased to announce significant progress on the Fleur Sauz Lithium Project in northern Mexico.

 

Highlights:

· Stage 2 drilling programme completed.

· Drill rig retained for further drilling to infill the current Lithium resource and extend the resource further in preparation for the pre-feasibility study.

· Metallurgical pilot plant due to be commissioned in 6 weeks and the JV is optimistic of successfully achieving battery grade Lithium Carbonate.

· Drilling is now planned to test the new Megalit Concession.

 

David Lenigas, The Company's Chairman, commented:

 

"REM are pleased that the drill rig has been retained in Mexico to continue to test for the limits of the Lithium mineralisation in this new Lithium Province. The Stage 2 drilling programme has proved very successful and should add significant value to the Fleur Sauz Lithium Project when all the results are received and factored in to the pre-feasibility study within the coming months."

"REM is also pleased that the metallurgical recovery test work is progressing well and that the recovery of battery grade Lithium Carbonate is now considered achievable."

 

Fleur Sauz Lithium Project Update:

Drilling:

Bacanora Minerals Limited has advised that the Stage 2 drilling programme has now been completed on the Fleur Sauz joint Venture lands.

Due to the success of the Stage 2 drilling programme, the drill rig has been retained for an infill drilling programme in the southern portion of Sauz claim over the next month with about 1,000 metres of core-drilling in 5 to 6 holes in order to upgrade the resources from the inferred to indicated category in preparation of the pre-feasibility study.

Drilling activities will then move to the new Megalit Concession in the southernmost recognized drill target called Perdices-Peñasco area, which is located about 7 km south of Sauz on the Megalit claim.

A trenching program will commence shortly in the Buenavista claim area, where >1,300 ppm Lithium grades have now been obtained in surface samples on a +40 m thick clay sequence exposed in the south-central portion of the claim.

 

Metallurgy Update:

Due to the encouraging results of the bench-scale test work, the construction of the Lithium Carbonate pilot plant has begun and is expected to be operational in approximately 6 weeks. Test work is also being conducted in parallel by Inspectorate in Canada and results from both facilities will be certified by Inspectorate.

Results to date from work carried out in our pilot plant and by Inspectorate at their facility in Vancouver, Canada, have been very encouraging and the goal of producing battery grade lithium carbonate is now considered as achievable.

 

- Ends -

 

For further information please contact:

 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Joint Broker) +44 (0) 20 7220 1666

James Joyce

Nick Field

 

XCAP Securities plc (Joint Broker) +44 (0) 207 101 7070

Guy Peters

Jon Belliss

 

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUGUPUPCPPB
Date   Source Headline
22nd Jan 20157:00 amRNSDismissal of Adviser
21st Jan 201510:14 amRNSYangibana Update
15th Jan 20155:54 pmRNSResult of Placing of Ordinary Shares
15th Jan 20154:30 pmRNSProposed placing to raise up to £2.5 million
15th Jan 20157:00 amRNSSonora Lithium Project expanded
7th Jan 20157:00 amRNSWestern Lithium Ships First Organoclay Order
22nd Dec 20147:00 amRNSScoping Study
19th Dec 20149:55 amRNSStatement re: Press Speculation
18th Dec 20142:48 pmRNSHolding(s) in Company
17th Dec 201410:10 amRNSREM completes £7m funding
10th Dec 20147:29 amRNSUpdate - Yangibana Rare Earths Element Project
3rd Dec 20148:24 amRNSYangibana Mining Scoping Study
28th Nov 20148:26 amRNSResults of Metallurgical Testing from Yangibana
12th Nov 20147:00 amRNSAppointment of SRK & Increased Bacanora Holding
11th Nov 201410:58 amRNS230% Increase in JORC Resources at Yangibana
10th Nov 20147:00 amRNSYangibana Update
4th Nov 20147:00 amRNSDrilling Re-Commences at Sonora Lithium Project
22nd Oct 20147:00 amRNSHatch appointed for the Sonora Lithium Project
15th Oct 20147:00 amRNSUpdate on Magdalena Borate Project
13th Oct 20147:00 amRNSNew Discovery of REE on Greenland Licences
1st Oct 20147:00 amRNSExpansion Plans for the Sonora Lithium Project
30th Sep 20142:46 pmRNSWestern Lithium Signs Distribution Agreement
25th Sep 20141:08 pmRNSREM increases strategic holding in Bacanora
24th Sep 20142:54 pmRNSPositive results from Greenland regional sampling
23rd Sep 20147:00 amRNSIncrease in strategic holding in Nevada Lithium Co
11th Sep 20144:33 pmRNSEstablishment of Share Incentive Plan and EBT
11th Sep 20147:00 amRNSREM's CEO appointed to the board of Bacanora
9th Sep 20147:00 amRNSWestern Lithium - Update
27th Aug 20147:00 amRNSInterim Results
26th Aug 20147:00 amRNSYangibana Update
21st Aug 20147:00 amRNSSonora Lithium Project Update
19th Aug 20147:00 amRNSMegalit Lithium Joint Venture
5th Aug 20147:29 amRNSYangibana Update - Maiden JORC resource
4th Aug 20147:00 amRNSYangibana Update - Maiden JORC resource expected
4th Aug 20147:00 amRNSInitial TREO results from Greenland
1st Aug 20147:00 amRNSREM increases strategic holding in Bacanora
28th Jul 20147:00 amRNSREM reports holding in Bacanora Minerals at 11.68%
15th Jul 20147:00 amRNSUpdate - Yangibana Rare Earth Prospect
15th Jul 20147:00 amRNSREM increases strategic holding in Bacanora
11th Jul 20141:06 pmRNSUpdate re. Bacanora Minerals
4th Jul 20147:00 amRNSREM increases strategic holding in Bacanora
27th Jun 20148:02 amRNSBacanora - conditional approval of offering
26th Jun 201410:07 amRNSBacanora announces terms of equity offering
25th Jun 20149:14 amRNSSonora Lithium Project - NI43-101 Technical Report
25th Jun 20147:00 amRNSUpdate - El Sauz Fleur Lithium Property, Mexico
17th Jun 201410:21 amRNSDrilling Update on Yangibana Rare Earth Prospect
13th Jun 20143:32 pmRNSIssue of Debt
6th Jun 20147:24 amRNSREM increases strategic holding in Bacanora
4th Jun 20147:01 amRNSLithium Resource Increase and Upgrade
30th May 20147:00 amRNSUpdate on Greenland Exploration

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.