Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Update from Madagascar

6 Oct 2005 07:00

Jubilee Platinum PLC06 October 2005 6th October 2005 AIM: JLP JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Second Borehole Confirms Continuity of Recent Discovery in Madagascar Jubilee announces the results of its second borehole LAV2A, drilled on theLavatrafo property (Londokomanana Project) in Madagascar. The Lavatrafo depositis the southern unit of two currently disparate nickel-copper-platinum-palladiumdeposits that fall within the Londokomanana concession held by Mineral Resourcesof Madagascar Sarl, Jubilee's 85% owned subsidiary. This borehole was steppedout 150 metres southeast of borehole LAV1. The Londokomanana project is locatedapproximately 150 kilometres north of the Madagascan capital Antananarivo. Highlights • Multi-metal intersection in the second borehole confirms continuity along strike of formation • The 75-metre true width of mineralization lends itself to low cost bulk mining • Mineralization is consistent with that identified in borehole LAV1 - as reported on 5th September 2005 • In-situ gross metal value (GMV) of the intersection is US$52/t rock or 1.32% Cu equivalent at current metal prices • Intersections of higher GMV include 20 metres at US$98 per tonne rock and 43.8 metres at $77/tonne rock. • These results compare favourably with bulk mining projects currently being developed world-wide Results of the full 92 metres (from 72 to 164 metres) apparent width ofmineralised intersection are appended and selected intercepts summarised below: From metres To Intercept Nickel Copper 3E* % Cu In-situ GMV $/ t (at current metres metres % % g/t equiv. prices) 72.35 164.05 91.7 0.26 0.14 0.66 1.32 52 82.35 162.05 79.7 0.29 0.16 0.73 1.46 57 115.0 158.8 43.8 0.40 0.25 0.80 1.95 77 136.1 156.2 20.1 0.52 0.33 0.92 2.49 98 *3E platinum, palladium, gold The continuity of the formation, its strike direction and the lithology of thehost and contact rocks generally correlate well with the geophysical datagenerated in our earlier exploration. A stratigraphic sequential pattern oflithologies is emerging, and it is anticipated that this pattern will direct thedrilling in several formations in the vicinity, showing similar geophysicsfurther to the south and to the north of the current drilling programme. Set Point Laboratories (ISO 17025 and SANAS Accredited) in Johannesburg, SouthAfrica carried out the analyses of the borehole core samples. Quality assurancein place currently comprises of standards, blanks and check samples making 10%of samples submitted. Colin Bird, CEO of Jubilee, said: "The results of this step out hole haveconfirmed our prediction of the continuity of a wide mineralised package atLavatrafo. Assuming this formation continues, we are potentially looking at alarge open-pit mineable bulk deposit, at an $11/t cut-off. Our immediateobjective is to delineate the strike of the formation and then prove up themodel. We believe that the results could lead to Lavatrafo becoming asignificant mining region and we will report further on our drilling programmeas soon as possible." Ends For further information please contact: Colin Bird Cathy Malins / Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel: 07768 397 627 Tel +44 20 7493 3713 Appendix Lavatrafo drill results - Borehole LAV2A Grade Sample From To Interval Au Pt Pd Ni Cu no. metres metres metres ppm ppm ppm ppm ppm S7469 72.35 73.35 1.00 0.01 0.16 0.12 856 94 S7471 73.35 74.35 1.00
Date   Source Headline
31st Jul 201711:52 amRNSPlatinum Projects Quarterly Update - Q2 2017
22nd Jun 20173:00 pmRNSDirector Dealing
15th Jun 20171:30 pmRNSHernic Project Reaches Full Production
19th May 201710:30 amRNSHernic Project Ramping-Up and Live Webcast
9th May 20179:00 amRNSMarket Update
30th Mar 20173:18 pmRNSInterim Results - replacement
30th Mar 201712:15 pmRNSInterim Results
29th Mar 20172:15 pmRNSJubilee commences platinum production
17th Mar 20177:00 amRNSExecution of Platinum Tailings Agreement
14th Mar 20171:15 pmRNSFinal proceeds from Middelburg and DCM update
9th Mar 20177:00 amRNSJubilee Executes Surface Tailings Transaction
6th Mar 20179:45 amRNSDCM Operations update and Exercise of warrants
2nd Mar 20178:30 amRNSTjate Executes Mining Right
21st Feb 20173:15 pmRNSExercise of last warrants at specific issue price
15th Feb 20173:31 pmRNSExercise of Last Warrants at Specific Issue Price
13th Feb 201711:45 amRNSExercise of Warrants
8th Feb 20178:45 amRNSExercise of Warrants
6th Feb 20172:45 pmRNSHernic Project in Production
3rd Feb 20179:30 amRNSExercise of Warrants
30th Jan 20179:00 amRNSHernic Tailings Project update
25th Jan 20172:00 pmRNSExercise of Warrants
17th Jan 20171:00 pmRNSUpdate notification and Exercise of Warrants
6th Dec 20161:31 pmRNSResults of AGM and Change of Registered Office
28th Nov 20161:15 pmRNSJubilee Live Interactive Webcast
14th Nov 20168:00 amRNSAudited results for the year ended 30 June 2016
11th Nov 20161:15 pmRNSExercise of Warrants & Dealing in Securities
9th Nov 201612:30 pmRNSBraemore Tailings Project
21st Oct 20168:45 amRNSPlatinum Projects quarterly update
15th Sep 20167:00 amRNSPlatinum Projects update
19th Aug 201612:00 pmRNSJubilee Live Interactive Webcast
18th Aug 20167:00 amRNSPlatinum Projects update
11th Jul 20168:00 amRNSPlatinum Projects Quarterly Update
7th Jun 201611:30 amRNSJubilee Processing Operational Update
27th May 201612:00 pmRNSExercise of Warrants
20th May 201612:30 pmRNSDealing in securities
12th May 20161:30 pmRNSJubilee Processing Operational Update
29th Apr 201612:30 pmRNSResults of General Meeting
28th Apr 201612:30 pmRNSTailings Projects Further Update
19th Apr 201611:00 amRNSTailings Projects Update
8th Apr 20167:00 amRNSNotice of General Meeting
31st Mar 20167:00 amRNSInterim Results
22nd Mar 20167:00 amRNSProject Funding for Surface Platinum Processing
14th Mar 201611:15 amRNSUpdate on Platinum Surface Processing Operations
1st Mar 20162:30 pmRNSExercise of Warrants
22nd Feb 20167:00 amRNSShareholder update
12th Jan 20167:00 amRNSJubilee Live Interactive Webcast
15th Dec 201510:30 amRNSFinal Agreement for Surface platinum project
8th Dec 20151:30 pmRNSCompletion of acquisition in DCM Platinum Project
2nd Dec 20153:30 pmRNSResults of Annual General Meeting
12th Nov 20152:00 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.