Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Operations Update

5 Aug 2011 07:00

RNS Number : 7907L
Jubilee Platinum PLC
05 August 2011
 



 

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN GB0031852162

Jubilee Platinum PLC

("Jubilee" or the "Company")

Operations Update

 

Jubilee Platinum Plc, the AIM and JSE quoted mine to metal specialist is pleased to announce that is has reached operational temperatures at the Company's new 5MW AC furnace at Middelburg which is now moving towards full production of 2,400 tonnes per month of ferroalloy feed stock and/or concentrate.

 

In addition, the Company is delighted to announce exceptional results from Platinum Group Metals ("PGMs") flotation recovery testwork carried out on a representative UG2 chromitite reef drill core samples from its Tjate Platinum project ("Tjate") as part of its on-going prefeasibility study.

 

HIGHLIGHTS

 

·; The additional capacity provided by the new furnace could potentially generate additional monthly revenues of around R6.0 million (c.£540,000 at current exchange rates ) while producing ferroalloys;

 

·; Currently the furnace is being fine tuned and final inspections concluded after the initial smelting runs, for ramp up to full production;

 

·; Tjate continues to produce positive results towards its pre-feasibility study;

 

·; Recoveries of 90.0% to 91.5% of 4E (platinum palladium rhodium & gold) from flotation testwork on the UG2 ore while producing above average concentrate grade; and

 

·; The exceptional recoveries of the platinum group elements ("PGEs") were achieved by producing a UG2 concentrate containing high chrome. ConRoast is the only available smelting solution for effectively processing such chrome rich platinum concentrates.

 

Leon Coetzer, CEO of Jubilee Platinum commented:

 

"We are delighted to report that we have commenced feeding ferroalloy concentrate to the new 5MW furnace at our Middelburg smelting facility.

 

"Tjate testwork results continue to add value to our project, supported by our ability to process high chrome containing platinum concentrates."

 

Bringing into production of the new 5MW AC furnace

Aligned with the two existing 2.5MW AC furnaces, the new 5 MW AC furnace effectively doubles the furnace capacity on site at Middelburg to 10MW. The new furnace's production will be ramped up to a designed throughput of feed material of 2,400 tonnes per month. This additional capacity is potentially capable of generating additional monthly revenues of around R 6.0 million (c.£540,000 at current exchange rates) while operating as a ferroalloy furnace.

 

Tjate Flotation testwork

Eight UG2 reef drill core samples were tested at the laboratories of Maelwgwyn Mineral Services Africa to determine the optimum recoverability of the PGEs in the reef.

 

The results achieved indicate excellent consistent recoveries in excess of 90% of 4E to flotation concentrate, while maintaining a concentrate grade of above 290 g/tonne.

 

The results were achieved by not constraining the recovery of PGEs in order to limit the recovery of chrome in the concentrate. The results clearly demonstrate the potential for high recoveries from UG2 ores when not constrained by considerations around limiting the chrome levels in concentrate. This approach is only feasible due to the proven ability of Jubilee's ConRoast smelting process which allows it to smelt platinum concentrates containing high levels of chrome.

 

The Company believes that as much as 4% higher PGE recovery to concentrate is possible - and would be achievable in commercial practice - from the UG2 ore by producing platinum concentrate containing high chrome for further smelting in the ConRoast process.

 

The Company is actively negotiating with interested committed entities on securing funding for an integrated approach towards completing both the pre feasibilty and a bankable feasibility study.

New Website

Jubilee Platinum is pleased to announce that it has today launched an updated Company website which can be viewed at:

http://www.jubileeplatinum.com

The site has been redesigned to improve its efficiency and to be user friendly. Jubilee Platinum is committed to providing shareholders and potential shareholders with concise information on the Company and its operations. The new website will be updated regularly as the Company operations continue to develop apace

----ENDS----

 

Contacts

 

Colin Bird/Leon Coetzer/ Andrew Sarosi

Jubilee Platinum plc

Tel +44 (0) 20 7584 2155 / Tel +27 (0)11 465 1913 / +44 (0) 1752 221937

 

Matthew Robinson/Rose Herbert - corporate finance

Joanna Weaving - corporate broking

finnCap Ltd

Tel +44 (0) 20 7600 1658

 

Shore Capital Stockbrokers Limited (Joint Broker)

Jerry Keen/Dru Danford/Edward Mansfield

Tel: +44 (0) 20 7 408 4090

 

Leonard Eiser /Sharon Owens

Sasfin Capital

Tel +27 (0) 11 809 7500

 

Nick Rome/Shabnam Bashir

Bishopsgate Communications Ltd

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFMGGRKDVGMZM
Date   Source Headline
29th May 20267:00 amRNSNotice of General Meeting
28th May 20262:10 pmRNSStrategic Investment to Support Copper Growth
6th May 20267:00 amRNSOperational and Production Update 9m FY2026
29th Apr 20267:00 amRNSCapital Reduction Court Approval
20th Apr 20264:05 pmRNSHolding(s) in Company
8th Apr 20262:57 pmRNSResults of GM & Proposed Capital Reduction
31st Mar 20267:01 amRNSImplementation of Mine Plan at Molefe
31st Mar 20267:00 amRNSFinancial report for 6 months to end-December 2025
25th Mar 20267:05 amRNSMolefe Mine Phase 1 Drilling Results
24th Mar 20267:00 amRNSMolefe Mine Phase 1 Drilling Results delayed
23rd Mar 202610:05 amRNSReduction of Share Premium Account & Notice of GM
23rd Mar 20267:00 amRNSReduction of Share Premium Account & Notice of GM
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
27th Feb 20267:00 amRNSShareholder update and Dealing in securities
19th Feb 20267:00 amRNSOperational and Projects update H1 FY2026
23rd Jan 20267:00 amRNSChanges to the Board
14th Jan 20262:19 pmRNSResults of Annual General Meeting
6th Jan 20267:00 amRNSReceipt of US$10 million in funds from SA sale
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
17th Dec 20257:00 amRNSAudited Results for FY2025 & Notice of AGM
28th Nov 20257:00 amRNSMolefe Mine Co-Operation and Development Agreement
21st Nov 20257:00 amRNSOperational Update Zambia Q1 FY2026
17th Nov 20257:00 amRNSCompetition Tribunal Approval
17th Oct 20257:00 amRNSOperational Update South Africa Q1 FY2026
6th Oct 20256:06 pmRNSTR-1: notification of major holdings
6th Oct 20257:00 amRNSZambia Copper Strategy and SA Disposal Update
8th Sep 20257:00 amRNSDealing in securities
28th Aug 20252:05 pmRNSResults of General Meeting
12th Aug 20257:00 amRNSPosting of Circular & Notice of General Meeting
6th Aug 20257:00 amRNSZambia Copper and SA Business Proposed Sale Update
21st Jul 20257:00 amRNSQ4 Operational Update - South Africa
10th Jul 20257:00 amRNSChange of Broker and Proposed Disposal Update
19th Jun 20257:00 amRNSDirectorate Change
5th Jun 20257:00 amRNSProposed Disposal of Chrome and PGM Operations
28th May 20257:02 amRNSZambia Projects Update & Issue of equity
30th Apr 20257:40 amRNSZambia Progress Update
16th Apr 20257:00 amRNSOperational Update Q3 FY2025
14th Apr 20257:00 amRNSDirectorate Change
9th Apr 20257:00 amRNSTransaction on Surplus PGM Feed Material
3rd Apr 20257:00 amRNSJubilee Transaction on Large Waste Project
31st Mar 20257:00 amRNSInterim Financial Report 6 Months to December 2024
14th Feb 20257:00 amRNSRoan Commences High Grade Copper Production
6th Feb 20257:00 amRNSZambia Projects Update
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options
21st Nov 20247:00 amRNSTR-1: notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.