We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksItm Power Regulatory News (ITM)

Share Price Information for Itm Power (ITM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 51.10
Bid: 51.30
Ask: 51.55
Change: 1.10 (2.20%)
Spread: 0.25 (0.487%)
Open: 51.00
High: 54.35
Low: 50.85
Prev. Close: 50.00
ITM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Northern Gas Networks Deployment Study Findings

24 Apr 2018 07:00

RNS Number : 8506L
ITM Power PLC
24 April 2018
 

24 April 2018

 

ITM Power plc

("ITM Power" or the "Company")

 

Northern Gas Networks Deployment Study Findings

 

ITM Power (AIM: ITM), the energy storage and clean fuel company, is pleased to announce the outcome of the Large-Scale Power-to-Gas Energy Storage Deployment Study with Northern Gas Networks, the gas distributer for the North of England, Northern Cumbria and much of Yorkshire.

 

The feasibility study, announced in November 2017, and funded from the Department for Business, Energy and Industrial Strategy (BEIS) was to collaborate with Northern Gas Networks (NGN) to undertake an examination of the potential deployment of large-scale Power-to-Gas energy storage. The focus was on deployments capable of operating cost-effectively from 50MW energy storage capacity upwards within the boundaries of the NGN gas distribution network.

 

Findings

Four locations would be suitable for a large-scale first-of-a-kind power-to-gas demonstration supplying the stored energy to either majority domestic or industrial customers gas customers. Of the four locations Low Thornley in Gateshead is recommended as the most suitable site for deployment of a large-scale first-of-a-kind power-to-gas demonstration facility in the size range 50-100MW.

 

Low Thornley, the site of the InTEGReL (Integrated Transport Electricity and Gas Research Laboratory) facility in Gateshead, is capable of supporting large scale Power-to-Gas throughout the year from peak demands in winter, to the lower demand conditions experienced in the summer months. Hydrogen injected at Low Thornley would deliver stored energy in the form of low carbon gas to over 243,000 customers. Also, Low Thornley' s close proximity to the A1 and the urban centres of Newcastle and Gateshead would provide opportunity for local export of hydrogen necessary to develop a local hydrogen refuelling station network which would enable fuel cell electric vehicles to travel from London to Aberdeen.

 

The recommended next steps are:

Undertake a Front End Engineering Design (FEED) study for a large-scale power-to-gas demonstrator in the size range 50-100MW to be built at the Northern Gas Networks Low Thornley site, to fully scope the programme and to establish the cost to build, install, commission and demonstration the facility.

 

Develop and agree a UK-wide gas network industry strategy for the wider demonstration and deployment of power-to-gas energy storage as a near-term contribution to the decarbonisation of heat and as a means to support the wider deployment of renewable generation by providing a route to a proven technology which can bridge the power and energy networks.

 

Process:

Areas of existing network constraint on the electricity distribution network were identified and the system balancing mechanisms in use by the System Operator were reviewed. Candidate locations were identified within the area of NGN's two Local Distribution Zones (LDZ), that could form the basis for large-scale power-to-gas energy storage demonstration sites on NGN's large scale distributed gas network.

 

Candidate locations were prioritised and analysed from a gas network perspective to identify sites suitable for detailed analysis including; pressure, gas flows, seasonal variations in demand, grid infrastructure. Taking existing network planning models for NGN's North and North East LDZ, maximum and minimum hourly natural gas flows across a range of demand levels were extracted.

 

Hydrogen production and efficiency data was taken from ITM Power's existing electrolysers and extrapolated to provide a long-list of hydrogen production rates up to 100MW size that could accommodate hydrogen injection at 20 vol%. From the long-list sites were categorised based on their ability to support the volumes of hydrogen energy produced by electrolysis at different scales and gas demand conditions.

 

These were centred on offtakes and large pressure regulator installations (PRIs) where the flows of natural gas are such that all year-round hydrogen injection can be achieved. One area identified, Seal Sands, is adjacent to three existing salt caverns used for hydrogen which are sufficient to provide low pressure intra-day and inter-seasonal storage.

 

Cross-sector export opportunities for hydrogen as a transport fuel for Fuel Cell Electric Vehicles (FCEV) in the North and North East regions were investigated using the rollout strategy set out by the industry / Government led UK Hydrogen Mobility (UKH2Mobility). Conclusions were drawn and suggestions made for the location and scale of size for a next step first of a kind deployment and demonstration of large-scale power-to-gas energy storage project in the region.

 

 

Graham Cooley, CEO of ITM Power, said: "This feasibility study has resulted in a close working relationship with Northern Gas Networks and the results are very exciting for the deployment of large scale Power-to-Gas energy storage on their network. Northern Gas Networks have emerged as leaders in the use of hydrogen in the UK gas network for both energy storage and for renewable heat. "

 

Mark Horsley, CEO of Northern Gas Networks said: "Power-to-gas technology has the potential to answer some of our key energy storage challenges because of the gas network's sheer size and flexibility. This study has delivered some compelling results and insight into how a whole systems approach and green hydrogen can facilitate decarbonisation across all energy vectors. By bringing gas and electric together, there is a valuable opportunity to drive down costs for customers, increase resilience and improve sustainability."

 

Keith Owen, Head of Systems Development and Energy Strategy at Northern Gas Networks, added: "The outcome of this feasibility study shows the exciting potential of power-to-gas energy storage on our network. With four preferred locations identified to cost-effectively deploy 50MW of energy storage facilities we now look to practical implementation. A Whole Systems approach to UK energy will drive decarbonization across the gas, electricity and mobility sectors. Power-to-Gas energy storage offers a new role for the UK gas grid which places a new value on an important UK asset, delivering new market opportunities, options for flexibility for the UK electricity Grid and Ultra Low Carbon solutions for transport."

 

For further information please visit www.itm-power.com or contact:

 

ITM Power plc

Andy Allen, CFO

+44 (0)114 244 5111

Investec Bank plc (Nominated Adviser and Broker)

Jeremy Ellis / Chris Sim / Jonathan Wynn

+44 (0)20 7597 5970

Tavistock (Financial PR and IR)

Simon Hudson / James Collins

+44 (0)20 7920 3150

 

About ITM Power plc

ITM Power manufactures integrated hydrogen energy solutions for grid balancing, energy storage and the production of green hydrogen for transport, renewable heat and chemicals. ITM Power was admitted to the AIM market of the London Stock Exchange in 2004. In September 2017 the Company announced the completion of a GBP29.4m working capital fundraise. The Company signed a forecourt siting agreement with Shell for hydrogen refuelling stations in September 2015 and subsequently a deal to deploy a 10MW electrolyser at Shell's Rhineland refinery. Additional customers include National Grid, RWE, Engie, BOC Linde, Toyota, Honda, Hyundai, Anglo American among others. The Company's order pipeline stands at £33.3m of projects under contract and £5.8m of contracts in the final stages of negotiation, totaling £39.1m (subject to exchange rate variation).

 

About Northern Gas Networks

Northern Gas Networks Limited (NGN) distributes gas to households and businesses in the north of England. It owns and maintains approximately 37,000 kilometres of gas pipes and delivers gas to 2.7 million customers in the North East, Northern Cumbria, and Yorkshire. NGN is regarded as a frontier network, taking a lead on efficiency, safety and relentless focus on the customer to ensure the highest levels of service. NGN has pioneered the research into hydrogen as a new fuel source and has been actively pursuing the possibilities of utilising hydrogen as a heating source in the UK through the H21 Leeds City Gate project.

 

-ends-

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDUOVKRWKASUAR
Date   Source Headline
5th Jul 20137:00 amRNSParticipation in French Mobility Programme
3rd Jul 20137:08 amRNSTrading Statement
2nd Jul 20133:40 pmRNSLeaked Announcement
24th Jun 20137:00 amRNSITM Power joins Californian HES Program
20th Jun 20137:00 amRNSITM Power joins German P2G Strategy Platform
17th Jun 20137:00 amRNSIncorporation of ITM Power ApS in Denmark
10th Jun 20137:00 amRNSCorporate and Technical Due Diligence
6th Jun 201311:09 amRNSTotal Voting Rights
22nd May 20137:00 amRNSCalifornia Energy Commission Report
14th May 20137:00 amRNSParticipation in H2USA
9th May 20137:00 amRNSDECC Grant
1st May 201310:30 amRNSTotal Voting Rights
1st May 20137:00 amRNSHannover Fair and First Sale to New Territories
26th Apr 201310:10 amRNSParticipation in North Sea Power-to-Gas Platform
25th Apr 20137:00 amRNSSainsbury's joins UKH2Mobility
15th Apr 20134:35 pmRNSPrice Monitoring Extension
28th Mar 20134:51 pmRNSBlocklisting Interim Review
13th Mar 201311:00 amRNSFirst Power-to-Gas Sale in Germany
12th Mar 20137:44 amRNSFirst Sale in Russia
27th Feb 20134:35 pmRNSPrice Monitoring Extension
25th Feb 201310:49 amRNSEcoIsland Update
18th Feb 20137:00 amRNSFirst Sale in Japan
4th Feb 201312:09 pmRNSUK H2 Mobility Phase 1 Completion
31st Jan 20137:01 amRNSCE Marking of Fuel Cell System
31st Jan 20137:00 amRNSHalf Yearly Report
3rd Jan 20137:00 amRNSImportant Intellectual Property Additions
6th Dec 20127:00 amRNSFuel Cell Durability Update
30th Nov 20127:00 amRNSAppointment of Lucas Bertrand
28th Nov 20127:00 amRNSGrant Award for an Advanced Refueling Product
26th Nov 20124:35 pmRNSPrice Monitoring Extension
26th Nov 20127:00 amRNSAgreement with AEG Power Solutions
19th Nov 20127:00 amRNSDECC Funding Award
15th Nov 20127:00 amRNSAdviser Change of Name
12th Nov 20127:00 amRNSUK Government Energy Storage Policy - Update
9th Nov 20127:00 amRNSEU funding for PEM Fuel Cell Innovation - IMPACT
2nd Nov 20127:00 amRNSAgreement with ABO Wind of Wiesbaden
12th Sep 201211:22 amRNSResult of AGM
3rd Sep 20127:00 amRNSLetter of Intent signed with German Utility
29th Aug 20127:00 amRNSShell and National Grid Join Gas Inject Project
21st Aug 20125:24 pmRNSNotice of AGM
14th Aug 20127:00 amRNSMarketing Update
8th Aug 20128:01 amRNSDirectors and Major Interests
3rd Aug 20125:00 pmRNSRESULTS OF FIRM PLACING AND OPEN OFFER
3rd Aug 20127:00 amRNSAgreement with GMI Energy
2nd Aug 20125:07 pmRNSGrant of Options
1st Aug 201212:16 pmRNSTotal Voting Rights
26th Jul 20127:00 amRNSSale of Equipment to CEA
24th Jul 20127:00 amRNSAppointment of Geoff Budd
20th Jul 20128:01 amRNSDirectors' and Significant Shareholders' Interests
19th Jul 20123:00 pmRNSGrant of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.