Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

30 Jan 2008 12:30

Highland Gold Mining Limited30 January 2008 Highland Gold Mining Limited 30 January 2008 Progress Made at Three Highland Gold Mining limitedExploration Properties Highland Gold Mining Limited ("Highland Gold", or the "Company") is pleased toannounce that exploration results from 3 of its exploration properties which arein advanced stage of work indicate strong development potentials. At Belaya Gora, a total of 13,000 metres of diamond drilling have been completedin 2007 at the two targets Pologaya and Stockwork. Assay results received todate are in line with our previous expectations and corroborate the property'sresource potential which is estimated to be within the C1+C2 Russian reservecategory at 22 million tonnes grading 1.68 g/t of gold. Resource delineationdrilling is now continuing at Stockwork with an additional 7,500 metres plannedto be completed by mid-year 2008. Metallurgical testing on two 300kg bulksamples from both targets is also in progress and preliminary results point tohigh recovery rates by gravitation alone. A pre-feasibility report including acut-off grade study and a report with reserves calculation is being compiled andwill be submitted for state approval by year-end 2008 as set out in the licenseagreement. At the Lyubov property in the Chita region, the 2007 exploration programmefocused on two targets, the Lyubov gold trend in the south and the Khaverga orefield in the north of the license area. At the Lyubov gold trend our drilltesting programme identified a stockwork-type mineralization within the Evgrafzone which hosts a potential resource of (C1+C2) + P2 category of 28 milliontonnes grading 1.5 g/t of gold, based on drilling results from previousexplorers and our own results to date. In 2008 an additional 9,500 metres ofdiamond drilling is planned on the Evgraf zone and its western extension inorder to delineate the zone's overall resource potential estimated at 4-5 Moz.of gold (C1+C2+P1). At the Khaverga ore field the analysis of our 2007 geochemical soil-samplingsurvey revealed a 4 km long and 1.5 km wide zone ofdistinct gold anomalies with high gold grades of 0.03-8.0 g/t occurring withinunconsolidated sediments. The geochemical anomalies spatially coincide with avery favourable geological setting marked by a regional fracture zone which wasidentified also during our geophysical survey work in the area. The Companyconsiders that the mineral resource potential of the Khaverga could becomparable to that of the Lyubov trend. A trenching and sampling programme isplanned for 2008 to delineate targets for follow-up drilling. In 2007 the Company completed the preliminary stage of geological exploration atits Unkurtash project in Kyrgyzstan and the adjoining Sarytube and Karytubeprospects. Based on these results the overall resource potential has beenestimated and the type and volume of future exploration works formulated in anew "Exploration Project" as per the regulatory requirement. Accordingly, awidespread gold mineralization occurs in parallel zones of steeply dippingstockworks which form an elongated belt 4,000m long and 250-500 metres wide witha vertical extent of at least 350 metres. Extrapolating from the most exploredareas, results of our own and previous works indicate a total resource potential(C1+C2+P1) for the exploration properties of 200 million tonnes grading 1.5 g/tof gold. The 2008 exploration programme allocates 12,000 metres of drilling forpotentially delineating resources of 60 tonnes of gold of C1+C2 category and 120tonnes of P1 category. Mr. Werner Klemens, Director Exploration at Highland Gold has reviewed andverified the information contained in this release. Mr. Klemens holds a Ph.D. inGeology from the University of Toronto. He has 11 years of experience in mineralexploration and is fellow of the Geological Association of Canada. - A rigorousquality assurance programme complying to international standards is in effect atall exploration projects and includes duplicate sampling, insertion of standardsand check assaying at external laboratories. Commenting on today's announcement, Henry Horne, Managing Director said: "Thesepositive results underline the Company's strong commitment to continue with itsextensive exploration programme and highlights the potential that lies in ourportfolio. Work at these as well as other prospects should contribute to theCompany's growth going forwards." Enquiries:Highland Gold MiningHenry Horne, Managing Director, Moscow - +7 495 777 5529Dmitry Yakushkin, Director of Communications - +7 495 777 3155Dominic Palmer-Tomkinson - +44 207 7239 0140 Fin Public RelationsAlex Glover - +44 (0) 207 608 2280 JPMorgan CazenoveMichael Wentworth-Stanley, Managing Director(Nominated Adviser) - +44 (0) 207 588 2828 Highland Gold Mining Limited trades under the ticker, HGM.Lwww.highlandgold.com * * *Belaya Gora project. - New assay results from drilling and trenching at the twotargets Pologaya and Stockwork. Belaya Gora - Target Pologaya - Drilling - Fire AssaysDrill Hole ID From (m) To (m) Intersect Avg. grade Au Length (m) (g/t)7201 12.3 24.2 11.9 3.3 Belaya Gora - Target Pologaya - Trenching - Fire AssaysDrill Hole ID From (m) To (m) Intersect Avg. grade Au Length (m) (g/t)TR70 46 70 24 8.11TR80 27 44 17 1.96 Belaya Gora - Target Stockwork - Drilling - Fire AssaysDrill Hole ID From (m) To (m) Intersect Avg. grade Au Length (m) (g/t)4502 163 188.0 25.0 1.24005 29.7 47.5 17.8 2.05 55.5 78.7 23.2 1.134503 106 135 29.0 1.626509 7.2 60.2 53.0 10.766007 118.0 144.0 26.0 5.725003 110.3 133.5 23.2 2.984506 56.8 72.8 16.0 3.57 86.8 114.0 27.2 0.95 120.0 138.0 18.0 1.645503 2.2 8.3 6.1 1.10 14.6 32.3 17.7 5.50 63.5 104.3 40.8 1.66 135.4 188.9 53.5 1.554008 32.8 47.1 14.3 1.745506 74.0 144.7 70.7 3.77 Belaya Gora - Target Stockwork - Drilling - Spectroscopic Assays(XRF)Drill Hole ID From (m) To (m) Intersect Avg. grade Au Length (m) (g/t)4008bis 28.8 37.8 9.0 1.31 45.8 67.1 21.3 1.775006 104.8 157.4 52.6 4.556009 55.7 110.8 55.1 3.28 Lyubov project, Evgraf prospect. - Significant assay results from drilling andunderground sampling from Highland Gold's 2007 programme and previousexploration. +----------------------------------------------------------------------+ |Lyubov - Target Evgraf East - Drilling - Fire Assays - HGM (2007) | +-------------+-------------+-------------+--------------+-------------+ |Drill Hole ID|From (m) |To (m) |Intersect |Avg. grade Au| | | | |Length (m) |(g/t) | +-------------+-------------+-------------+--------------+-------------+ |BGL-211 |42.1 |76.6 |34.5 |1.3 | +-------------+-------------+-------------+--------------+-------------+ |BGL-211 |108.6 |119.6 |11.0 |1.6 | +-------------+-------------+-------------+--------------+-------------+ |BGL-213 |59.0 |97.2 |38.2 |1.3 | +-------------+-------------+-------------+--------------+-------------+ |BGL-214 |4 |28 |24.0 |1.7 | +-------------+-------------+-------------+--------------+-------------+ |BGL-221 |45.4 |62.4 |17.0 |1.4 | +-------------+-------------+-------------+--------------+-------------+ |Lyubov - Target Evgraf East - Drilling - Fire Assays - Previous (1996)| +-------------+-------------+-------------+--------------+-------------+ |C-849 |75.0 |92.0 |17 |1.6 | +-------------+-------------+-------------+--------------+-------------+ |C-850 |36.0 |87.0 |51.0 |2.9 | +-------------+-------------+-------------+--------------+-------------+ |C-850A |22.0 |53.0 |31.0 |1.4 | +-------------+-------------+-------------+--------------+-------------+ |C-859 |6.0 |44.0 |38.0 |1.4 | +-------------+-------------+-------------+--------------+-------------+ Lyubov - Target Evgraf - Underground - Fire Assays - Previous(1996) Drill Hole ID From (m) To (m) Intersect Avg. grade Au Length (m) (g/t)ug 1210-10 3.88 18.48 14.60 0.65ug 1210-10 28.39 41.69 13.30 1.02ug 1210-10 51.03 71.31 20.28 2.15ug 1210-1 0.00 84.24 84.24 5.21ug 1210-29 3.68 19.15 15.47 1.14ug 1210 - 9 5.23 7.19 1.96 1.68ug 1210 - 9 13.88 27.55 13.67 1.02ug 1210 - 9 33.43 41.74 8.31 0.88ug 1280-13 2.18 73.65 71.47 1.52 Lyubov - Target Evgraf - Trenching - Fire AssaysDrill Hole ID From (m) To (m) Intersect Avg. grade Au Length (m) (g/t)Tr-10 15.21 33.27 18.06 0.40Tr-10 39.92 74.14 34.22 1.59Tr-10 83.64 87.44 3.80 0.60Tr-10 115.01 137.82 22.81 0.65Tr-10 147.32 148.27 0.95 2.40Tr-10 153.98 307.00 153.02 0.96Tr-11 0.00 76.94 76.94 0.65Tr-11 85.61 216.72 131.11 1.42Tr-11 229.73 265.48 35.75 1.13 Unkurtash project. - Significant assay results from drilling and undergroundsampling from Highland Gold's 2007 programme and previous exploration.Unkurtash - Target Unkurtash - Trenching - Fire Assays - Previous(1990) Drill Hole ID From (m) To (m) Intersect Avg. grade Length (m) Au (g/t)-30 14.50 23.50 9.00 1.57-30 37.00 80.80 43.80 3.35-30 127.50 148.60 21.10 1.29-31 106.00 174.00 68.00 5.24-31A 22.50 55.50 33.00 0.85-31A 65.50 74.50 9.00 2.63-31A 91.50 94.50 3.00 2.40-31A 112.50 114.00 1.50 12.30-31A 123.00 143.00 20.00 28.57-31A 168.00 176.00 8.00 1.50 Unkurtash - Target Unkurtash - Underground - Fire Assays - Previous(1990) Drill Hole ID From (m) To (m) Intersect Avg. grade Length (m) Au (g/t)Drift1, west 7.00 97.00 90.00 1.92wallDrift 4, 7.50 10.00 2.50 1.28x-cut 4, eastwallDrift 4, 23.00 58.00 35.00 1.70x-cut 4, eastwallDrift 4, 74.00 102.00 28.00 2.54x-cut 4, eastwallUnkurtash - Target Unkurtash - Drilling - Fire Assays - Previous(1990) Drill Hole ID From (m) To (m) Intersect Avg. grade Length (m) Au (g/t)-4 188.00 192.00 4.00 1.17-4 206.00 216.00 10.00 1.14-4 284.00 296.00 12.00 1.90-4 378.00 428.00 50.00 0.90-5 48.70 61.50 12.80 0.75-5 71.50 74.40 2.90 1.74-5 87.40 138.30 50.90 1.17-5 183.50 204.80 21.30 0.90-5 229.00 237.50 8.50 2.03-5 262.00 270.50 8.50 0.78-5 281.00 308.00 27.00 1.15-5 353.00 360.00 7.00 1.29-5 366.60 369.70 3.10 1.30-7 1.00 44.00 43.00 0.99-7 50.00 64.00 14.00 0.69-7 74.00 97.00 23.00 1.50-7 133.50 161.00 27.50 0.85-7 178.50 202.00 23.50 1.29 Unkurtash - Target Unkurtash - Drilling - Fire Assays - Barrick/Highland (2005-2007) BG-U-1 0.00 2.00 2.00 1.64BG-U-1 9.00 17.20 8.20 0.58BG-U-1 35.70 57.60 21.90 0.63BG-U-1 63.40 76.50 13.10 0.51BG-U-1 95.40 147.90 52.50 1.17BG-U-1 155.90 172.90 17.00 2.08BG-U-1 178.90 231.00 52.10 0.86BG-U-1 236.90 248.80 11.90 0.62HG-U-5 1.00 54.00 53.00 1.29HG-U-7 0.00 46.00 46.00 1.27HG-U-7 52.00 58.00 6.00 3.14HG-U-7 65.00 116.00 51.00 2.14 Note: all intervals in the above tables have been calculated using a minimum 5mwaste interval and Au cut-off grade of 0.5g/t. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Jul 20201:49 pmRNSAdjournment of Annual General Meeting
9th Jul 20207:00 amRNSQ2 2020 Operating Results
6th Jul 20204:07 pmRNSTR-1: Notification of major holdings
29th Jun 20207:00 amRNSUpdate on COVID-19 Response
2nd Jun 20207:00 amRNSSale of Kayen
20th May 20207:00 amRNSMailing of 2019 Annual Report and Notice of AGM
22nd Apr 20207:00 amRNSQ1 2020 Operating Results
15th Apr 20207:00 amRNSFull Year 2019 Audited Results
9th Apr 20207:00 amRNSFull Year Results Announcement Date
20th Mar 20207:05 amRNSHGM Updates on COVID-19 Policies and Measures
19th Mar 20207:00 amRNS1st Gold Pour at Kekura and Capital Project Update
17th Mar 20207:00 amRNSExploration Licence for Krasnaya Gorka
11th Mar 20207:00 amRNSAppointment of Chief Operating Officer
21st Jan 20207:00 amRNSQ4 2019 Operating Results
12th Dec 20197:00 amRNSDividend Declaration
3rd Dec 20192:00 pmRNSHGM Conducts First Gold Sale on Moscow Exchange
2nd Dec 20197:00 amRNSDirectorate Change
21st Oct 20197:00 amRNSQ3 2019 Operating Results
3rd Sep 20197:00 amRNSInterim Results Announcement for H1 2019
28th Aug 20191:17 pmRNSInterim Results Announcement Date
19th Aug 20192:38 pmRNSDeath of a Director
19th Jul 20197:00 amRNSQ2 2019 Operating Results
3rd Jul 20197:00 amRNSKekura and Klen Admitted to Special Economic Zone
4th Jun 20192:04 pmRNSResults of Scrip Dividend Election
23rd May 201911:24 amRNSResults of Annual General Meeting
2nd May 20197:00 amRNSInterim Scrip Dividend Pricing Announcement
30th Apr 20191:13 pmRNSMailing of 2018 Annual Report and Notice of AGM
25th Apr 20197:00 amRNSQ1 2019 Operating Results
12th Apr 20197:00 amRNSFull Year 2018 Audited Results
5th Apr 20192:01 pmRNSFull Year Results Announcement Date
2nd Apr 20197:00 amRNSHIGHLAND GOLD MINING LIMITED
15th Feb 20194:34 pmRNSHolding(s) in Company
15th Feb 20197:00 amRNSDirector/PDMR Shareholdings
4th Feb 20194:06 pmRNSBlock listing Interim Review
21st Jan 20197:00 amRNSQ4 2018 Operating Results
14th Jan 20197:00 amRNSNew Reserve Audit Extends MNV Life of Mine to 2029
3rd Jan 20199:34 amRNSHolding(s) in Company
3rd Jan 20199:24 amRNSDirector/PDMR Shareholding
31st Dec 20187:00 amRNSCompletion of Acquisition and Issue of Equity
20th Dec 20181:34 pmRNSUpdate on Valunisty Acquisition
13th Dec 20187:00 amRNSDividend Declaration
18th Oct 20187:00 amRNSQ3 2018 Operating Results
17th Oct 20183:25 pmRNSHolding(s) in Company
8th Oct 20187:00 amRNSNew Branding, Website and Mission Statement
4th Sep 20187:00 amRNSInterim Results Announcement for H1 2018
29th Aug 201811:30 amRNSInterim Results Announcement Date
6th Aug 20189:25 amRNSBlock listing Interim Review
2nd Aug 201810:19 amRNSNew Exploration Licence Near MNV
26th Jul 20187:00 amRNSQ2 2018 Operating Results
24th May 20182:29 pmRNSResult of Extraordinary General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.