Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHerencia Resources Regulatory News (HER)

  • There is currently no data for HER

Drilling Report

2 May 2006 11:40

Herencia Resources PLC02 May 2006 Herencia Resources plc Exploration Update Highlights - Iquique project drilling program of 36 holes and 3887 metrescompleted. - The assayed results of the Iquique drilling program will be releasedas soon as received, collated and assessed. - Paguanta sampling and mapping is continuing to define themineralization and identify drill targets. Background of Herencia Resources Plc in Chile Herencia Resources Plc (Herencia) acquired an interest in 2 prospective silverand copper districts in Chile in November 2005, both of which have never beendrilled or explored using modern systematic exploration techniques. Herencia hasa right to earn a 70% interest in the Iquique and Paguanta projects located innorthern Chile. Iquique Project The Iquique project area covers secured tenements over approximately 97 km2 onthe coast of northern Chile. This mineral field contains numerous old silverworkings dating back to the Inca Empire and the Spanish colonial era. Thisproject area covers almost the entire Iquique mining district, which in the 19thCentury, with over 60 operating mines, was the second largest silver producer inChile. A drilling program of 36 holes was completed in March 2006. A total of 3887metres was drilled to an average depth of 110 metres. Drill holes wereclustered at the Rose Marie oxide copper prospect (7 drill holes), the RosaAmelia mine area (8 drill holes), the Monte Cristo mining centre (8 drill holes)and in three groups in the Pajonales mining centre (13 drill holes). Drill holeswere spread at an average of 50 metres along the drilled line, with drilledlines spread at an average of 188 metres apart. The drill samples have all been delivered to the local sample processinglaboratory and are shipped for analysis as soon as they are processed. Delaysin processing have occurred due to the large load of both production andexploration samples inundating the laboratories as a result of higher metalsprices and increased exploration activity. Results for only 19% of the sampleshave been received to date. Due to the current delays being encountered inprocessing and analysis it is not expected at this stage that the final assayswill be received for six more weeks. If there are any further delays or theresults are received earlier than expected then a further announcement will bemade. The average grades of mineralization will be announced as soon as all the assayresults have been received, collated and assessed. Paguanta project The Paguanta Project is located on the northern trend of the main Chileanporphyry copper belt, approximately 120km east of the coastal port of Iquiqueand 20 km south of highway to Bolivia. Paguanta has old workings which providedrill targets and additionally our geologists have identified a number of othertargets of potential disseminated base and precious metal mineralization thatwill be evaluated. Bad weather and initial difficult road access delayed the planned start of workat Paguanta. Improved weather and alternative road access has enabled theinitial program of geologic mapping and sampling to get under way. Channel sampling is being undertaken in the old underground mine workings. Thesamples collected will be analysed and the results announced as soon as all havebeen received, collated and assessed. Geologic mapping and sampling on a 25 metre grid is also being undertaken withthe objective to further develop information about the alteration andmineralization that was evident from previous mapping at a larger scale. Geologic mapping and sampling on a 25 metre detailed grid area is also beingundertaken with the objective to develop detailed information about thealteration and mineralization that was not evident from the previous mapping at50 metre centres a larger scale. A total of 345 surface and underground samples have been taken at Paguanta anddelivered to the CESMEC laboratory near Iquique, Chile, for processing, of which192 have now been shipped to Acme Analytical Laboratories S. A. for analysis forgold, silver, copper, lead and zinc. Approximately 250 more samples are plannedfrom other underground workings, from trenches and from mineralization exposedby road cuts. A program of stream sediment sampling covering the entire property will beinitiated in the near future to evaluate the extensive alteration zones found onthe property. A diamond drill program of approximately 2000 metres isanticipated to begin in September. James R. Reeves, Registered Professional Geologist, General Manager of IquiqueResources, has reviewed the information contained in this announcement. JamesReeves has over 36 years experience in the resources sector and is a qualifiedperson within the definition of the AIM guidelines. Further background details on the Company and its Iquique and Paguanta projectscan be found at www.herenciaresources.com. **ENDS** Contacts: Tony Barton +618 9325 8888 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Aug 20118:02 amRNSHigh Grade Drill Assay Rslts Continue at Patricia
4th Aug 201111:15 amRNSMore high grade results at Paguanta
20th Jul 20119:19 amRNSDrilling to recommence at Paguanta
8th Jul 20112:18 pmRNSProject Update
4th Jul 20118:07 amRNSUpdate on Project Activity
24th Jun 20117:50 amRNSIssue of Equity
15th Jun 201111:00 amRNSMore Copper and Silver at Doris
14th Jun 20117:00 amRNSProject Update
9th Jun 20113:17 pmRNSResult of AGM
31st May 201111:00 amRNSNew Copper-Gold Project Agreement Signed
27th May 20114:53 pmRNSHolding(s) in Company - Replacement
27th May 20112:45 pmRNSHolding(s) in Company
27th May 20117:00 amRNSProject Update
18th May 20119:55 amRNSProject Update
9th May 201110:53 amRNSProject Update
19th Apr 201110:58 amRNSFinal Results
18th Apr 201110:46 amRNSProject Update
11th Mar 20117:00 amRNSDrilling Commences at Paguanta
28th Feb 20111:34 pmRNSDrilling Update
3rd Feb 20114:12 pmRNSNew Copper-Gold Project Opportunity
31st Jan 201112:18 pmRNSTotal Voting Rights
18th Jan 201112:23 pmRNSDirector/PDMR Shareholding
12th Jan 201112:48 pmRNSDirector/PDMR Shareholding
31st Dec 20107:56 amRNSTotal Voting Rights
23rd Dec 201010:48 amRNSPaguanta Project Update
22nd Dec 20103:31 pmRNSIssue of Equity
1st Dec 20108:31 amRNSIssue of Equity
25th Nov 20108:52 amRNSProject Update - Doris Geophysical Survey
22nd Nov 201011:07 amRNSProject Update
19th Nov 20103:41 pmRNSHolding(s) in Company
16th Nov 20108:03 amRNSHolding(s) in Company
10th Nov 20102:20 pmRNSPaguanta Project Update
29th Oct 20103:33 pmRNSTotal Voting Rights
27th Oct 20102:08 pmRNSMore High Grade Copper and Silver Assays at Doris
12th Oct 201012:33 pmRNSIssue of Options
8th Oct 201011:45 amRNSHolding(s) in Company
7th Oct 20109:38 amRNSMining Inventory Upgraded for Paguanta Project
4th Oct 20109:22 amRNSHolding(s) in Company
1st Oct 20109:42 amRNSDirectors Dealings/Issue of Equity
22nd Sep 201011:51 amRNSHolding(s) in Company
22nd Sep 201010:18 amRNSDirectorate Change
17th Sep 20108:03 amRNS2010 Mineral Resource Update for Paguanta Project
10th Sep 20109:07 amRNSHigh Copper and Silver Grades Confirmed at 'Doris'
9th Sep 20103:56 pmRNSHalf Yearly Report
12th Aug 20109:10 amRNSHigh Grade Surface Copper and Silver at Paguanta
2nd Aug 20108:30 amRNSFinal Results from Drilling Program at Paguanta
23rd Jun 20103:37 pmRNSResult of AGM
23rd Jun 20107:41 amRNSContinued High Grade Intercepts
18th Jun 201010:42 amRNSDMS test work to commence on Paguanta Ore
25th May 20107:48 amRNSFurther extension to Cathedral vein at Paguanta

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.