Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHelium One Regulatory News (HE1)

Share Price Information for Helium One (HE1)

Share Price is delayed by 15 minutes
Get Live Data
0.52    -0.002 (-0.38%)
Bid:
0.51
Ask:
0.53
Spread: 0.02 (3.922%)
Market Cap: £51.27m
HE1 Live PriceLast checked at - London Stock Exchange

Intraday Helium One Share Chart

Forward Operational Update

7 Mar 2024 07:01

RNS Number : 9040F
Helium One Global Ltd
07 March 2024

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as amended by The Market Abuse (Amendment) (EU Exit) Regulations 2019.

07 March 2024

Helium One Global Ltd

("Helium One" or "the Company")

Forward Operational Update

Helium One Global (AIM: HE1), the primary helium explorer in Tanzania, is pleased to provide the following update on future operations at Rukwa.

Highlights

· Drill stem test ("DST") results carried out on the Itumbula West-1 well calculate a minimum flow rate of 0.5 million cubic feet per day ("mmscfd") containing 4.7% helium

· Extended well test ("EWT") planned on Itumbula West-1 well in Q3 2024

· Resource estimates and subsurface modelling being progressed

· Early engagement with vendors regarding production facility engineering as the Company's focus transitions towards development and production

· Company-owned Epiroc Predator 220 drilling rig is currently hot stacked and remains in a state of operational readiness

Details

The DST results from Itumbula West-1 well have demonstrated that the well has flowed the equivalent of 0.5 mmscfd of 4.7% helium (without any artificial lift) from the fractured Basement and faulted zone. These flow rates in a pure helium play, without the presence of hydrocarbons and carbon dioxide, indicate the uniqueness of this helium project.

The Company is currently advancing its subsurface modelling and updating its internal resource estimates in order to determine the best path towards the commercialisation of Itumbula.

Helium One is currently working towards an EWT in Q3 2024 on Itumbula West-1 in order to confirm flow rates and the fluid composition. Conditional upon these results, the Company will then be in a position to advance discussions with off-takers and industry partners and will help determine the design of any future production facility. The Company has already approached vendors regarding such facilities and will be working closely with them over the coming months.

The Company is also reviewing its options to drill another well this year, following the commencement of the EWT. These options include the deepening of Tai-3 to test the Basement play or the drilling of an appraisal well at Itumbula. The outcome of this, as well as the planned EWT, is subject to securing the necessary long lead items required for such operations.

The Company-owned Epiroc Predator 220 drilling rig is currently hot stacked at the Itumbula West-1 wellsite. Additional spare parts are being obtained while the rig remains in a state of operational readiness.

Recent positive engagement with the Mining Commission of Tanzania has enabled the Company to align on forward appraisal and development plans, including associated licensing requirements. The Company looks forward to making further updates in due course.

Lorna Blaisse, Chief Executive Officer, commented:

"The Company's focus is now on appraising and evaluating the resource potential at Itumbula West-1. Whilst progressing the subsurface work, to better understand the resource estimates in a fractured Basement and fault play, we are planning the next phase of operations. An extended well test at site will enable us to confirm commercial flow rates and fluid composition, whilst continuing to plan for development and production scenarios in parallel.

This is a highly exciting time for the Company as we transition beyond exploration. I look forward to providing further updates as we progress our plans in due course."

For further information please visit the Company's website: www.helium-one.com

Contact

Helium One Global Ltd

Lorna Blaisse, CEO

+44 20 7920 3150

Liberum Capital Limited (Nominated Adviser and Broker)

Scott Mathieson

Ed Thomas

Nikhil Varghese

+44 20 3100 2000

Tavistock (Financial PR)

Nick Elwes

Tara Vivian - Neal

+44 20 7920 3150

Notes to Editors

Helium One Global, the AIM-listed Tanzanian explorer, holds prospecting licences totalling more than 2,965km2 across three distinct project areas, with the potential to become a strategic player in resolving a supply-constrained helium market.

The Rukwa, Balangida, and Eyasi projects are located within rift basins on the margin of the Tanzanian Craton in the north and southwest of the country. The assets lie near surface seeps with helium concentrations ranging up to 10.6% He by volume. All Helium One's licences are held on a 100% equity basis.

The Company's flagship Rukwa Project is located within the Rukwa Rift Basin covering 1,900km2 in south-west Tanzania. The project is considered to be an advanced exploration project with leads and prospects defined by a subsurface database including multispectral satellite spectroscopy, airborne gravity gradiometry, 2D seismic data, and QEMSCAN analysis. The Rukwa Project has been de-risked by the 2023/24 drilling campaign, which has identified a working helium system.

Helium One is listed on the AIM market of the London Stock Exchange with the ticker of HE1 and on the OTCQB in the United States with the ticker HLOGF.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
UPDDGGDXGDGDGSL
Date   Source Headline
22nd Apr 20257:00 amRNSHelium and CO2 Plant Construction Permit Approved
16th Apr 20257:00 amRNSJackson-27 Spud at Galactica Project
10th Apr 20257:00 amRNSJackson-29 Well Drilled to TD & Free Gas Confirmed
4th Apr 20258:33 amRNSJackson-29 Operational Update
1st Apr 20257:00 amRNSJackson-4 Flow Testing and Gas Sampling Analysis
31st Mar 20257:00 amRNSJackson-29 Spud at Galactica Project
31st Mar 20257:00 amRNSSouthern Rukwa Mining Licence – Formal Acceptance
24th Mar 202510:39 amRNSBlocklisting Six Monthly Return
24th Mar 20257:00 amRNSJackson-4 Well Drilled to TD & Free Gas Confirmed
21st Mar 20257:00 amRNSUnaudited Interim Results
18th Mar 20257:00 amRNSJackson-4 Intermediate Section Drilling Complete
14th Mar 20257:00 amRNSJackson-31 Flow Testing and Gas Sampling Analysis
6th Mar 20257:00 amRNSState-16 Well, Galactica Project Update
5th Mar 20257:00 amRNSJackson-4 Spud at Galactica Project
3rd Mar 20257:00 amRNSCompany Receives Offer of Mining Licence
3rd Mar 20257:00 amRNSJackson-31 Well Drilled to TD & Free Gas Confirmed
26th Feb 20257:00 amRNSJackson-31 Intermediate Section Drilled
19th Feb 20257:00 amRNSJackson-31 Spud at Galactica Project
12th Feb 20257:00 amRNSJackson-31 Drilling Update Galactica Project
29th Jan 20257:00 amRNSJackson-31 Drilling Update Galactica Project
23rd Jan 202511:04 amRNSChange of Registered Office
15th Jan 20257:00 amRNSGalactica Project Drilling Update
23rd Dec 20247:00 amRNSDevelopment Drilling Update: Galactica Project
16th Dec 20241:17 pmRNSResults of AGM
13th Dec 20247:00 amRNSDevelopment Drilling Update Galactica Project
11th Dec 202411:01 amRNSIssue of Equity - Replacement
10th Dec 20247:00 amRNSIssue of Equity
20th Nov 20247:02 amRNSNotice of Annual General Meeting
20th Nov 20247:00 amRNSAudited Results for the year ended 30 June 2024
15th Nov 20247:00 amRNSGalactica-Pegasus Project Update
4th Nov 20247:01 amRNSDirectorate Change
4th Nov 20247:00 amRNSCompletion of Farm-In
17th Oct 20247:00 amRNSCompany Update
23rd Sep 20244:38 pmRNSBlocklisting Six Monthly Return
17th Sep 20247:00 amRNSCompany Update
4th Sep 20247:00 amRNSSustained helium flow at ITW-1
27th Aug 20247:01 amRNSAcquisition of He & CO2 project, and fundraise
27th Aug 20247:00 amRNSSuccessful EWT at ITW-1 flows up to 7.6% He
6th Aug 20247:00 amRNSSuccessful deepening of Itumbula West-1 well
29th Jul 20247:00 amRNSItumbula West-1 Commencement of Operations
17th Jul 20241:14 pmRNSDirectors Dealings
8th Jul 20243:16 pmRNS-RInvestor Presentation via Investor Meet Company
8th Jul 20247:00 amRNS-RNotice of focusIR Investor Webinar
1st Jul 20247:00 amRNSNominated Adviser and Joint Broker
1st Jul 20247:00 amRNSOperational Update
11th Jun 20247:00 amRNSResult of Placing and Subscription
10th Jun 20245:56 pmRNSProposed Placing of a minimum of £8.0 million
16th May 20247:00 amRNS-RAfrica Energies Summit
10th Apr 20247:00 amRNSRukwa Project update
22nd Mar 20247:00 amRNSBlocklisting Six Monthly Return

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.