Adrian Hargrave, CEO of SEEEN, explains how the new funds will accelerate customer growth Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Revere Project Operational Update

5 Oct 2009 07:00

RNS Number : 1963A
Nighthawk Energy plc
05 October 2009
 



Nighthawk Energy plc

Revere Project Operational Update

The directors of Nighthawk Energy plc ("Nighthawk"), the US focused hydrocarbon production and development company, are pleased to announce an operational update in respect of the Revere project.

Revere is a waterflood project covering in excess of 40,000 acres and is the product of the consolidation of the Devon Oilfield (Nighthawk 80%), Buchanan and Worden (Nighthawk 50%) and Xenia (Nighthawk 50%) projects, all located on or around the State border of Kansas and Missouri. Running Foxes Petroleum Inc., the operator, holds the remaining interests.

Revere is a relatively low cost, high upside development project. The shallow reservoir depths range from 350 to 800 feet and the Bartlesville and McClouth are the primary production formations. Nighthawk expects this core project to become a significant contributor in terms of reserves, production and cash flow.

In June 2009, Oilfield Production Consultants Limited ("OPC"), independent consultants, completed technical studies and an evaluation of the STOOIP ("Stock Tank Oil Originally in Place") at the Devon and Buchanan and Worden sections of Revere. An evaluation by OPC of Xenia is ongoing.

OPC reported that the P50, or most likely, STOOIP figure was 210.51 million barrels (gross) and commented within the study that this figure is expected to rise significantly on further development of the outlying acreage.

Recent activity on the project has been intense. There are currently 140 wells on primary production, 65 wells awaiting completion, 38 water injection wells at various stages of injection and one active salt water disposal well. Up to 200 new wells are planned to be drilled, including 99 currently permitted, all of which will be funded from existing cash resources.  With a 40,000 acre project area, there are potentially 4,000 well sites on 10 acre spacing.

A new reservoir has been discovered within the Devon area of the project.  Three new wells on primary production (without the impact of waterfloodinghave been producing at an aggregate rate of 25-30 barrels of oil per day and seven additional wells will be drilled and added to production within this area.

Construction of a 12 kilometre gas pipeline extension at Xeniawith a capacity of 5 million cubic feet of gas per day is nearing completion and production and gas sales are expected to commence during Q4 2009. Initial production is anticipated to be approximately 500,000 cubic feet per dayplus associated oil.

Significant infrastructure is already in place throughout the current Revere development area and is being expanded as the drilling programme continues. Water injection plants have been installed at numerous locations, several oil storage sites constructed and surface flowlines put in place to transport product. 

Current gross primary production from Revere is averaging 150 barrels of oil equivalent per day ("BOEPD") (gross). Oil is being trucked to a nearby processing facility and gas is being sold via the third party owned Bourbon County pipeline. 

Production is expected to rise to approximately 250 BOEPD (gross) when Xenia commences production and will increase significantly as the waterflood injection, now being applied at numerous locations on the project, takes effect and further wells are drilled and put on stream. 

The economics of Revere are robust. OPC reported that oil production rates of 5-20 barrels per day could be expected from each production well following the impact of waterflooding. With a low drilling cost to completion of approximately US$50,000 and assuming a US$50 oil price, a well producing even at the lower end of the expected range would cover the capital cost in approximately seven months.

Primary production of oil before the full impact of water injection is a positive sign for the reservoir potential for producing hydrocarbons. OPC reported that typical recovery rates in this type of waterflood project would be expected to be in the range of 15-25%, using a straightforward water injection process that has been used for decades on similar oilfields in the US and elsewhere in the world.

Managing Director, David Bramhill, commented: "Revere remains a high potential and high reward core project for Nighthawk. Development activity is intense. We have a major expansion programme planned for at least the next 12 months and look forward to reporting further progress."

Tim Heeley B.Eng (Hons) a member of the Society of Petroleum Engineers, Fellow of the Geological Society of London and Chartered Energy Engineer, who is Commercial Director of Nighthawk and has over 12 years of experience in the hydrocarbons industry has approved the technical information contained in this announcement.

Enquiries:

Nighthawk Energy plc

David Bramhill, Managing Director

Tim Heeley, Commercial Director

01271 882160

020 7887 1454

07956 525433

Hanson Westhouse Limited

Tim Feather

Matthew Johnson

020 7601 6100

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3395

nick@bishopsgatecommunications.com

Financial Dynamics 

Ben Brewerton

Ed Westropp

020 7831 3113

ben.brewerton@fd.com

edward.westropp@fd.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFSFFULSUSEIS
Date   Source Headline
31st Aug 20114:35 pmRNSPrice Monitoring Extension
25th Aug 20114:27 pmRNSChange of Adviser
17th Aug 20114:35 pmRNSPrice Monitoring Extension
12th Aug 20114:40 pmRNSSecond Price Monitoring Extn
12th Aug 20114:35 pmRNSPrice Monitoring Extension
9th Aug 20112:13 pmRNSHolding(s) in Company
4th Aug 20114:40 pmRNSSecond Price Monitoring Extn
4th Aug 20114:35 pmRNSPrice Monitoring Extension
3rd Aug 20117:00 amRNSQ2 Production and Operations Update
27th Jul 20114:36 pmRNSPrice Monitoring Extension
19th Jul 20117:00 amRNSAppointment of Chief Operating Officer
13th Jul 20114:35 pmRNSPrice Monitoring Extension
11th Jul 20114:40 pmRNSSecond Price Monitoring Extn
11th Jul 20114:35 pmRNSPrice Monitoring Extension
6th Jul 20117:00 amRNSChange of Registered Office
4th Jul 20114:35 pmRNSPrice Monitoring Extension
29th Jun 20114:04 pmRNSDirector/PDMR Shareholding
28th Jun 20113:14 pmRNSDirector/PDMR Shareholding
14th Jun 20114:35 pmRNSPrice Monitoring Extension
14th Jun 20119:41 amRNSDirectorate Change
9th Jun 20114:35 pmRNSPrice Monitoring Extension
7th Jun 20114:35 pmRNSPrice Monitoring Extension
2nd Jun 20114:35 pmRNSPrice Monitoring Extension
1st Jun 20117:00 amRNSGrant of Options
26th May 20117:00 amRNSDirector/PDMR Shareholding
18th May 20117:00 amRNSJolly Ranch Q1 2011 Production & Operations Update
9th May 20114:35 pmRNSPrice Monitoring Extension
9th May 20117:00 amRNSAppointment of CFO
28th Apr 20117:00 amRNSJolly Ranch Reserves Report
30th Mar 201111:23 amRNSHolding(s) in Company
29th Mar 20117:00 amRNSHalf Yearly Report
8th Mar 20117:00 amRNSJolly Ranch Operations Update & Drilling Schedule
4th Mar 201111:10 amRNSElectronic Communication with Shareholders
1st Mar 20117:00 amRNSTotal Voting Rights
8th Feb 20117:00 amRNSJolly Ranch Quarterly Production Update
1st Feb 20117:00 amRNSDraw down of funds and issue of equity
24th Jan 20117:00 amRNSJolly Ranch Reservoir Simulation Study
6th Jan 20117:00 amRNSJolly Ranch Operations Update
31st Dec 201012:35 pmRNSPrice Monitoring Extension
30th Dec 20104:40 pmRNSSecond Price Monitoring Extn
30th Dec 20104:35 pmRNSPrice Monitoring Extension
21st Dec 20104:35 pmRNSPrice Monitoring Extension
6th Dec 20104:35 pmRNSPrice Monitoring Extension
3rd Dec 20103:16 pmRNSDirector/PDMR Shareholding
3rd Dec 20102:36 pmRNSTotal Voting Rights
1st Dec 20101:12 pmRNSResult of AGM
29th Nov 20107:00 amRNSStrategic Review
11th Nov 20107:00 amRNSDraw down of funds and issue of equity
20th Oct 20107:00 amRNSFinal Results
14th Oct 20107:00 amRNSGBP25 million Equity Financing Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.