The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGoldstone Resources Regulatory News (GRL)

  • This share is currently suspended. It was suspended at a price of 2.15

Share Price Information for Goldstone Resources (GRL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.15
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.15
GRL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Akrokerri Deep Trenches and Licences Update

7 Sep 2017 07:00

RNS Number : 0398Q
Goldstone Resources Ltd
07 September 2017
 



7 September 2017

 

GOLDSTONE RESOURCES LIMITED

("GoldStone" or the "Company")

 

Operational Update - Akrokerri Deep Trenches and Licences

 

GoldStone Resources Limited (AIM: GRL) announces the results of a deep trenching programme, completed as the first step of the pit definition programme announced on 17 July 2017, on the Akrokerri Licence in Ghana. The trenching was undertaken to define the extent of the mineralisation in the near-surface oxide zone of the known deposit and augment the findings from the continued review by the Company of the historical database for the Homase and Akrokerri licences.

 

The Company dug four trenches (Figure 1), two in each of the proposed pits, within the Southern part of the 2012 JORC Code compliant resource ("Current Resource"). The trenches, located on the Southern part of the Current Resource and along strike from the old Homase pit, were identified as having a high potential for an initial open pit for heap-leach production within the oxide zone. The trenches were dug to a depth of 7 metres and channel samples were taken near the bottom of each trench in 1 metre consolidated intervals.

 

Figure 1. Location of trenching within the Proposed Pit Outlines in the Akrokerri Licence

http://www.rns-pdf.londonstockexchange.com/rns/0398Q_1-2017-9-6.pdf

 

 

The trenches showed economic intersections of up to 14 metres true width with grades of up to 4.5 g/t of gold (see Table 1). Both widths and grades shown in the trenches were above the Company's expectation, exceeding the intersections of nearby drill holes (see Figure 1) by approximately 20 per cent. This indicates the potential for increased gold content in the upper oxide zone. The trenching also indicated that the zones have a free digging potential, which would reduce production costs considerably if the material is shown to be consistent.

 

Further trenching is now being set out to assess the extent of the mineralised zone within the Akrokerri Licence and the Company is currently conducting a pit definition reverse circulation (RC) drilling programme within the proposed pits.

 

The geology within the licences is typical for the Obuasi area. The mineralisation is contained within a highly-sheared suite of meta-greywackes and partly graphitic shales. A series of sub-parallel quartz veinlets is the main host of pyrite and minor arseno-pyrite. The gold mineralisation at Akrokerri is associated with both the swarms of quartz veinlets (pyrite/ arseno-pyrite/ free gold) and the disseminated sulphides in the shales and greywackes. The degree of contribution to the total gold content will vary on the strike and at depth and this will be determined during production.

 

The review of historical data has shown that the Homase pit, mined by Ashanti Goldfields ("AGF") between 2002 and 2003, produced 52,452 oz gold, which was significantly in excess of AGF's original estimate of 35,799 oz gold, reported in AGF's Homase Pit Mining Reconciliation June 2002-03. According to AGF's mining reconciliation figures, there was a significant increase in tonnage and minor increases in grade and density compared to the original estimates. The differences are between the ore reserve model (based on pre-production drilling) and the grade control model (based on more closely spaced drilling during production).

 

One of the features that resulted in the higher recovery of gold from the Homase pit was the higher than anticipated widths in the upper zones of the mineralisation, which caused a mushroom effect, i.e. near-surface gold mobilisation and re-deposition.

 

AGF also reported pinching and swelling within the mineralised structure. This is a consistent feature throughout the Homase/Obuasi shear system. Ore shoots at the nearby Obuasi mine are characterised by tight en-echelon lenses. If these are repeated within the proposed pits on Akrokerri, there is potential for increased gold content to continue at depth.

 

Table 1: Trench Assays

 

Proposed Akrokerri Pit - 1

Proposed Akrokerri Pit - 2

Trench number

Sample ID

Au g/t

Trench number

Sample ID

Au g/t

Trench 2

Q1018

0.08

Trench 1

Q1002

0.55

Total length of Trench 2 - 17 metres

Q1019

0.08

Total length of Trench 1 - 15 metres

Q1003

1.51

Q1020

0.08

Q1004

0.62

Q1021

0.08

Q1005

0.73

Q1022

0.05

Q1006

1.08

Q1023

0.07

Q1007

0.61

Q1024

0.03

Q1008

0.67

Q1025

0.04

Q1009

0.43

Q1026

0.03

Q1010

3.18

Q1027

0.06

Q1011

1.75

Q1028

0.08

Q1012

3.68

Q1029

0.03

Q1013

2.11

Q1030

0.05

Q1014

2.58

Q1031

0.15

Q1015

1.36

Q1032

0.30

Q1016

0.81

Q1033

1.23

Q1034

2.81

Trench 4

Q1047

0.03

Total length of Trench 4 - 17 metres

Q1048

0.07

Trench 3

Q1036

2.20

Q1049

0.03

Total length of Trench 3 - 10 metres

Q1037

3.57

Q1050

0.08

Q1038

3.16

Q1051

0.06

Q1039

4.51

Q1052

0.06

Q1040

3.72

Q1053

0.12

Q1041

1.05

Q1054

0.12

Q1042

1.17

Q1055

0.25

Q1043

0.78

Q1056

0.94

Q1044

1.03

Q1057

1.06

Q1045

1.53

Q1058

0.70

Q1059

1.36

Q1060

1.78

Q1061

0.19

Q1062

0.23

Q1063

0.13

 

Sampling, assaying and QA/QC

 

GoldStone's sampling and other geological activities conforms to industry-wide good practice. The Company maintains Quality Assurance and Quality Control on all analytical work via the use of certified reference materials, field duplicates and blank samples in addition to monitoring of internal laboratory check-analyses. Chain of custody is observed for all samples. Determination of gold, by fire assay of 25g sub-samples and atomic absorption finish, was undertaken by ALS Minerals Limited in Kumasi, Ghana.

 

Bulk samples from the trenches have also been sent to the University of Mines and Technology at Tarkwa, Ghana for metallurgical testing, under the supervision of Prof. Amanwah, the Dean of the Faculty of Mineral Resource Technology and Ghana's leading expert in the metallurgy of the Ashanti shear system. The result of the metallurgical testing will be announced once received.

 

Licence Update

 

The Company continues to review its portfolio and is in the process of renewing its licences in both Senegal and Ghana. With regards to Gabon, the Company is considering its options which will likely result in the disposal or relinquishment of the licences.

 

In respect to Ghana, all requisite documents have been submitted to the Ghanaian Minerals Commission for both Akrokerri (100 per cent. interest) and Homase (90 per cent. economic interest) and the Company has received confirmation that the licences are awaiting signature from the Minister of Mines.

 

The current drilling and trenching will facilitate in determining the potential pit design for the proposed Akrokerri pits and will provide the necessary platform for proceeding with an application to the Government of Ghana for a mining permit, following the extension of the licences.

 

For further information, please contact:

 

GoldStone Resources Limited

Emma Priestley / Neil Gardyne

Tel: +44 (0)7867 785177 / +27 (0)82 490 4427

Strand Hanson Limited

Richard Tulloch / James Bellman

Tel: +44 (0)20 7409 3494

SI Capital Limited

Nick Emerson / Andy Thacker

Tel: +44 (0)1483 413 500

 

Information in this announcement has been complied and reviewed by Klaus Kappenschneider, an independent geologist with 30 years experience in gold mining, exploration and resource estimation. Klaus is a member of the Association of Professional Geoscientist of Ontario (APGO), is a Competent Person (JORC, SAMREC, PEMREC) and a Qualified Person (NI 43- 101) and accordingly, is a qualified person as required under the AIM Rules.

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014.

 

- END -

 

About GoldStone Resources Limited

 

GoldStone Resources Limited (AIM: GRL) is an AIM quoted exploration company with projects in Ghana, Senegal, and Gabon that range from grassroots to advanced exploration.

 

The Company is focused on developing the Homase-Akrokerri project in south-western Ghana, which hosts an existing 602,000 oz gold JORC Code compliant resource at an average grade of 1.77g/t, along strike from the Obuasi Gold Mine, one of the World's major gold mines with a total historical and current resource in excess of 70 million ounces of gold. It is the Company's intention to build a portfolio of high-quality gold projects in Ghana, with a particular focus on the highly prospective Ashanti Gold Belt.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDOKADQABKDFCK
Date   Source Headline
22nd Feb 20101:54 pmRNSProgress Report
22nd Jan 20107:00 amRNSDirectorate Change
10th Dec 20092:30 pmRNSHolding(s) in Company
30th Nov 20097:00 amRNSHalf Yearly Report
23rd Nov 20097:00 amRNSManso Amenfi Joint Venture
9th Nov 20093:55 pmRNSHolding(s) in Company
6th Nov 200912:48 pmRNSSenegal Exploration License Granted
2nd Nov 20097:00 amRNSChange of Registered Office
19th Oct 20097:00 amRNSGhanaian Joint Venture
12th Oct 20091:58 pmRNSHolding(s) in Company
7th Oct 200910:24 amRNSStmnt re Share Price Movement
24th Aug 200911:35 amRNSFinal Results
17th Aug 20093:41 pmRNSHolding(s) in Company
20th May 200910:08 amRNSDirectorate Change
17th Apr 20093:40 pmRNSUranium Project and Listing Update
2nd Mar 20093:59 pmRNSDirectorate Change
27th Feb 200912:18 pmRNSUranium Update
27th Nov 200812:07 pmRNSInterim Results
6th Oct 20085:21 pmRNSHolding(s) in Company
2nd Oct 200810:41 amRNSUranium Update
18th Sep 200810:25 amRNSHolding(s) in Company
16th Sep 200812:04 pmRNSHolding(s) in Company
15th Sep 20084:41 pmRNSHolding(s) in Company
4th Sep 20084:17 pmRNSHolding(s) in Company
15th Aug 200812:25 pmRNSGrant of Options
25th Jul 200812:08 pmRNSFinal Results - Correction
25th Jul 20087:00 amRNSFinal Results
8th Jul 20087:00 amRNSApplication for Indian Reconn
20th Jun 200811:17 amRNSUranium Project
16th Jun 20085:03 pmRNSHolding(s) in Company
12th Jun 20081:55 pmRNSHolding(s) in Company
10th Jun 20085:33 pmRNSHolding(s) in Company
6th Jun 20083:54 pmRNSHolding(s) in Company
5th Jun 20087:00 amRNSGrant of Exploration Permits
29th May 20083:49 pmRNSHolding(s) in Company
13th May 20081:38 pmRNSHolding(s) in Company
13th May 200810:08 amRNSApplication for Exploration P
29th Apr 200811:15 amRNSHolding(s) in Company
24th Apr 200812:47 pmRNSHolding(s) in Company
16th Apr 200812:47 pmRNSProgress Report
9th Apr 20084:48 pmRNSHolding(s) in Company
3rd Apr 20084:12 pmRNSHolding(s) in Company
2nd Apr 20084:43 pmRNSDirectorate Change
14th Mar 200810:16 amRNSHolding(s) in Company
7th Mar 20082:15 pmRNSProgress Report
28th Feb 20083:58 pmRNSHolding(s) in Company
20th Feb 200812:00 pmRNSProgress Report
29th Nov 20074:47 pmRNSInterim Results - Correction
29th Nov 200712:02 pmRNSInterim Results
1st Nov 20079:17 amRNSProgress Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.