The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulfsands Petroleum Regulatory News (GPX)

  • There is currently no data for GPX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Tunisia: Sidi Dhaher Well Testing Results

25 Jun 2012 07:00

RNS Number : 0198G
Gulfsands Petroleum PLC
25 June 2012
 



 

Immediate Release

25th June 2012,

 

 

GULFSANDS PETROLEUM PLC

 

 

Tunisia: Sidi Dhaher Well Testing Results

 

 

London, 25th June 2012: Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Iraq, Tunisia, Italy and the U.S.A., wish to provide the following update on the Company's activities in Tunisia.

 

ADX Energy Limited, ("ADX") the operator of the Chorbane licence, Tunisia, has advised that the testing operations at the Sidi Dhaher well have now been completed. Despite good flow rates from the two reservoir zones and substantial amounts of fluids being produced from the upper reservoir zone, the fluids were not observed to contain any quantities of oil.

 

Following the drilling out of the safety plug within the previously suspended well, two separate intervals within the Bireno Formation have been perforated and flow tested. A 5 metre section within the deeper Bireno Dolomite interval was perforated between 1174-1179 metres Measured Depth ("m MD") together with a 16 metre section in the shallower Bireno Limestone interval between 1155-1171m MD.

 

Approximately 90 barrels of fluid were recovered which were identified as most likely consisting of a mixture of drilling mud filtrate and possibly formation water. The efficient recovery of these fluids during the test suggests that they were sourced from the deeper Dolomite interval. Although a large volume of fluids have been lost to the formation whilst drilling and in preparation for the test, and the total volume had not yet been recovered during the flow test, the Joint Venture participants agreed to plug off the deeper Bireno Dolomite section and test only the shallower Bireno Limestone section in isolation.

 

After performing a cement squeeze to close the perforations over the deeper Bireno Dolomite interval, and the setting of a bridge plug within the well-bore and between the Bireno Dolomite and the Bireno Limestone intervals, a flow test of the Bireno Limestone interval commenced. Prior to acid stimulation of the reservoir, no liquid flow from the Bireno Limestone was observed and an acid stimulation was undertaken.

 

Following completion of the acid stimulation, the well was flow tested, with the benefit of nitrogen lift and approximately 680 barrels of fluid were recovered over a flow test period of 35 hours. The initial interpretation from the well site is that the recovered fluid is a mixture of spent acid, drilling mud filtrate and formation water.

The well will now be plugged and abandoned, and the drilling information and test data will be interpreted before determining any further operations to be undertaken on the Sidi Dhaher structure.

Gulfsands has a 40% interest in the Chorbane permit and in the event of a commercial success with exploration on the Chorbane permit, Gulfsands will be entitled to become the operator of the Chorbane permit.

This release has been approved by Richard Malcolm, Chief Executive of Gulfsands Petroleum Plc who has a Bachelor of Science degree in Geology with 30 years of experience in petroleum exploration and management. Mr. Malcolm has consented to the inclusion of the technical information in this release in the form and context in which it appears.

 

For more information please contact:

Gulfsands Petroleum (London)

+44 (0)20 7024 2130

Richard Malcolm, Chief Executive OfficerKenneth Judge, Director: Corporate Development & Communications

Buchanan (London)

+44 (0)20 7466 5000

Bobby MorseBen Romney

Helen Chan

RBC Capital Markets (London)

+44 (0)20 7653 4000

Matthew Coakes

Daniel ContiTim Chapman

 

 

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable securities legislation. These forward-looking statements are based on certain assumptions made by Gulfsands and as such are not a guarantee of future performance. Actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, increased costs of production or a decline in oil and gas prices. Gulfsands is under no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable laws.

 

More information can be found on the Company's website www.gulfsands.com

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFIMRTMBTTBFT
Date   Source Headline
20th Nov 20077:01 amRNSCommencement of Drilling
5th Nov 20077:01 amRNSOperational Update
31st Oct 20077:01 amRNSTotal Voting Rights
24th Oct 20077:00 amRNSIssue of Equity
23rd Oct 20077:02 amRNSHolding(s) in Company
8th Oct 20077:00 amRNSStrategic Agreement
27th Sep 20077:01 amRNSInterim Results
24th Sep 20077:01 amRNSOperational Update - Syria
31st Aug 20074:06 pmRNSChange of Adviser Name
6th Aug 20077:00 amRNSAIM Rule 26 Compliant Website
31st Jul 20077:01 amRNSTotal Voting Rights
27th Jul 20077:01 amRNSDrilling Update
23rd Jul 200711:19 amRNSResult of EGM
23rd Jul 20077:00 amRNSIssue of Equity
16th Jul 20077:14 amRNSExtension of PSC in Syria
16th Jul 20077:01 amRNSExtension of PSC in Syria
11th Jul 20075:15 pmRNSIssue of Equity
29th Jun 20077:01 amRNSResult of AGM & Notice of EGM
28th Jun 20074:43 pmRNSSecond Price Monitoring Extn
28th Jun 20074:38 pmRNSPrice Monitoring Extension
28th Jun 20077:01 amRNSAGM Statement
26th Jun 20077:03 amRNSPlacing
15th Jun 20077:01 amRNSDrilling Update
11th Jun 20077:00 amRNSWebsite Presentation Updates
4th Jun 20077:02 amRNSKhurbet East 1
31st May 20077:01 amRNSNotice of AGM
29th May 20072:50 pmRNSAnalyst and Investor visit
18th May 20077:00 amRNSDrilling Update
2nd May 20077:00 amRNSPreliminary Results
30th Apr 20077:02 amRNSUSA Reserves Update
28th Mar 20077:01 amRNSDrilling Update
19th Feb 20077:01 amRNSKhurbet East Well Spud
14th Feb 20077:01 amRNSTigris-1 Well update
31st Jan 20077:01 amRNSSyria Update
15th Jan 20077:00 amRNSUSA Production Update
20th Dec 20063:43 pmRNSTotal Voting Rights
18th Dec 20067:02 amRNSProduction Update
7th Dec 200611:16 amRNSNotifiable Interest
7th Dec 20067:00 amRNSDrilling Update
19th Oct 20067:01 amRNSSyria update & appointment
28th Sep 20067:03 amRNSInterim Results
11th Sep 20067:03 amRNSOperations Update - Syria
11th Sep 20067:01 amRNSDrilling Report
15th Aug 200612:30 pmRNSAGM Statement
28th Jul 20064:02 pmRNSDirector's Dealings
25th Jul 20067:02 amRNSAppointment
24th Jul 20067:02 amRNSOperations Update - Syria
24th Jul 20067:02 amRNSReserves Update
20th Jul 200611:46 amRNSHolding(s) in Company
28th Jun 20067:01 amRNSAnnual Report & Accounts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.