Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulfsands Petroleum Regulatory News (GPX)

  • There is currently no data for GPX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Tunisia: Sidi Dhaher Well Testing Results

25 Jun 2012 07:00

RNS Number : 0198G
Gulfsands Petroleum PLC
25 June 2012
 



 

Immediate Release

25th June 2012,

 

 

GULFSANDS PETROLEUM PLC

 

 

Tunisia: Sidi Dhaher Well Testing Results

 

 

London, 25th June 2012: Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Iraq, Tunisia, Italy and the U.S.A., wish to provide the following update on the Company's activities in Tunisia.

 

ADX Energy Limited, ("ADX") the operator of the Chorbane licence, Tunisia, has advised that the testing operations at the Sidi Dhaher well have now been completed. Despite good flow rates from the two reservoir zones and substantial amounts of fluids being produced from the upper reservoir zone, the fluids were not observed to contain any quantities of oil.

 

Following the drilling out of the safety plug within the previously suspended well, two separate intervals within the Bireno Formation have been perforated and flow tested. A 5 metre section within the deeper Bireno Dolomite interval was perforated between 1174-1179 metres Measured Depth ("m MD") together with a 16 metre section in the shallower Bireno Limestone interval between 1155-1171m MD.

 

Approximately 90 barrels of fluid were recovered which were identified as most likely consisting of a mixture of drilling mud filtrate and possibly formation water. The efficient recovery of these fluids during the test suggests that they were sourced from the deeper Dolomite interval. Although a large volume of fluids have been lost to the formation whilst drilling and in preparation for the test, and the total volume had not yet been recovered during the flow test, the Joint Venture participants agreed to plug off the deeper Bireno Dolomite section and test only the shallower Bireno Limestone section in isolation.

 

After performing a cement squeeze to close the perforations over the deeper Bireno Dolomite interval, and the setting of a bridge plug within the well-bore and between the Bireno Dolomite and the Bireno Limestone intervals, a flow test of the Bireno Limestone interval commenced. Prior to acid stimulation of the reservoir, no liquid flow from the Bireno Limestone was observed and an acid stimulation was undertaken.

 

Following completion of the acid stimulation, the well was flow tested, with the benefit of nitrogen lift and approximately 680 barrels of fluid were recovered over a flow test period of 35 hours. The initial interpretation from the well site is that the recovered fluid is a mixture of spent acid, drilling mud filtrate and formation water.

The well will now be plugged and abandoned, and the drilling information and test data will be interpreted before determining any further operations to be undertaken on the Sidi Dhaher structure.

Gulfsands has a 40% interest in the Chorbane permit and in the event of a commercial success with exploration on the Chorbane permit, Gulfsands will be entitled to become the operator of the Chorbane permit.

This release has been approved by Richard Malcolm, Chief Executive of Gulfsands Petroleum Plc who has a Bachelor of Science degree in Geology with 30 years of experience in petroleum exploration and management. Mr. Malcolm has consented to the inclusion of the technical information in this release in the form and context in which it appears.

 

For more information please contact:

Gulfsands Petroleum (London)

+44 (0)20 7024 2130

Richard Malcolm, Chief Executive OfficerKenneth Judge, Director: Corporate Development & Communications

Buchanan (London)

+44 (0)20 7466 5000

Bobby MorseBen Romney

Helen Chan

RBC Capital Markets (London)

+44 (0)20 7653 4000

Matthew Coakes

Daniel ContiTim Chapman

 

 

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable securities legislation. These forward-looking statements are based on certain assumptions made by Gulfsands and as such are not a guarantee of future performance. Actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, increased costs of production or a decline in oil and gas prices. Gulfsands is under no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable laws.

 

More information can be found on the Company's website www.gulfsands.com

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFIMRTMBTTBFT
Date   Source Headline
23rd Sep 20158:49 amRNSDirector/PDMR Shareholding
14th Sep 20152:58 pmRNSResult of General Meeting
27th Aug 20156:00 pmRNSProposed Open Offer and Notice of General Meeting
26th Aug 201512:03 pmRNSDirectorate Change
5th Aug 20152:18 pmRNSHalf Yearly Report 2015
31st Jul 20158:14 amRNSFunding Update
30th Jun 20153:18 pmRNSResult of AGM
30th Jun 20157:00 amRNSUpdate on Funding and Assignment of Loan Facility
8th Jun 20154:40 pmRNSSecond Price Monitoring Extn
8th Jun 20154:35 pmRNSPrice Monitoring Extension
8th Jun 20157:00 amRNS2014 Annual Report and Notice of AGM
20th May 20157:00 amRNSAnnual Results
19th May 201510:43 amRNSUpdate on Management Change
6th May 20157:02 amRNSChange of Nominated Adviser and Joint Broker
22nd Apr 201512:28 pmRNSManagement Change
22nd Apr 20159:30 amRNSBoard Appointment
14th Apr 20157:00 amRNSBoard and Management Changes
20th Mar 20157:00 amRNSCorporate Update
23rd Feb 20157:00 amRNSMorocco Operations Update - DOB Well Testing
3rd Feb 20154:22 pmRNSResults of General Meeting
28th Jan 20157:00 amRNSCorporate Update
23rd Jan 20157:00 amRNSCorporate Update - Arawak Energy Relationship
19th Jan 20157:00 amRNSNotice of General Meeting and Posting of Circular
13th Jan 20155:24 pmRNSNotice of General Meeting
13th Jan 20157:39 amRNSCancellation of General meeting
12th Jan 20154:31 pmRNSEGM Update
12th Jan 20157:00 amRNSMorocco Drilling Update
6th Jan 20157:08 amRNSMorocco Drilling Activities Update
22nd Dec 20147:00 amRNSCorporate Update
17th Dec 20147:00 amRNSNotice of General Meeting and Posting of Circular
9th Dec 20147:00 amRNSDisposal of US Gulf of Mexico Interests
8th Dec 20147:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
2nd Dec 20149:41 amRNSRequisition of General Meeting
19th Nov 20147:00 amRNSCorporate Update
11th Nov 20146:22 pmRNSResponse to statement by Waterford
30th Oct 20142:31 pmRNSShareholding Notification
30th Sep 20147:00 amRNSINTERIM FINANCIAL RESULTS 2014
5th Sep 20147:00 amRNSTunisia Update
14th Aug 20141:54 pmRNSDirector Shareholding
13th Aug 20147:00 amRNSBoard Changes
31st Jul 20147:00 amRNSMorocco Operations Update - LTU-1 Well
30th Jun 20147:00 amRNSBoard Changes
26th Jun 201410:55 amRNSResult of Annual General Meeting
26th Jun 20147:00 amRNSCorporate Update
20th Jun 20147:00 amRNSMorocco Drilling Commences
30th May 20144:06 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
27th May 20147:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th May 201410:15 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th May 201410:13 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th May 20147:00 amRNSInvestor Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.