GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulfsands Petroleum Regulatory News (GPX)

  • There is currently no data for GPX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Morocco Operations Update - DOB Well Testing

23 Feb 2015 07:00

RNS Number : 5385F
Gulfsands Petroleum PLC
23 February 2015
 



Gulfsands Petroleum Plc

 

 

Morocco Operations Update - Gas Discovery at DOB-1 Exploration Well

 

 

London, 23rd February, 2015:Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Morocco, Tunisia and Colombia is pleased to provide the following update on drilling activities in Morocco.

 

Morocco: Rharb Drilling Programme

 

Drilling operations on the Douar Ouled Balkhair 1 gas exploration well ("DOB-1") located within the Rharb Centre Permit in Northern Morocco have now concluded with the DOB-1 well being confirmed as a gas discovery. During testing of this discovery, gas flowed to surface during the well's clean up flow period at rates in excess of 10 million standard cubic feet per day ("mmscfpd). DOB-1 has now been suspended as a future gas production well.

 

The DOB-1 well is the third well to be drilled on the Rharb Centre permit based on the Company's interpretation of 3D seismic survey data acquired by Gulfsands on the permit area in the second half of 2013. The first two wells to be drilled on this permit were also successful in finding gas and flowing it to surface, at wells LTU-1 and DRC-1.

 

The DOB-1 well was drilled to a Total Depth ("TD") of 1140 metres Measured Depth ("MD") and encountered the primary reservoir target interval on prognosis at a depth of approximately 808 metres MD. Significantly elevated gas readings obtained while drilling, as well as interpretation of geological samples and wire line logs, indicated the presence of a gas bearing sandstone reservoir section of excellent quality. Detailed petrophysical evaluation of wireline logs over the primary target yielded an interpretation indicating a 4.2 metres gross sand thickness, with a net sand thickness of 3.7 metres and evaluated average gas saturation of 70% and average porosity of 34%.

 

The DOB-1 well was cemented and perforated over the primary reservoir interval, completed and then subjected to a flow testing and pressure survey period for evaluation of well flow performance and connected gas volumes. During initial clean up flow operations over this reservoir, the well produced natural gas at an estimated rate in excess of 10 million standard cubic feet per day ("mmscfpd") on a 48/64th inch choke setting. During subsequent multi-rate flow testing, a stable flow of 6.2 mmscfpd was established for a period of 4 hours on a 32/64th inch choke setting, with a final wellhead flowing pressure of 1084 psi. No formation water was detected in the gas production stream during testing operations.

 

The secondary reservoir target interval for the well was encountered at a depth of approximately 1075 metres MD. Significantly elevated gas readings were encountered over the interval 1075-1127 metres MD. However, after the completion of wire line logging operations, mechanical problems with well bore integrity above this interval prevented further access to or production testing of this deeper potential reservoir. The Company is currently reviewing all available data in order to determine the optimal path for further exploration of this reservoir section, which may include a re-deepening of this well at a later date post production of the shallower gas zone, potentially employing in this future operation a modified and strengthened well design.

 

Drilling and well testing operations for DOB-1 were completed on plan and on budget. Upon completion of operations the Company plans to suspend drilling operations whilst a detailed technical assessment is conducted over the DOB-1 and DRC-1 gas discoveries that will include the identification of potential locations for further drilling in the near vicinity of these discoveries.

 

Mahdi Sajjad, the Company's CEO commented:

 

"We are delighted with the results of the drilling and flow testing operations at well DOB-1. This is the third consecutive successful exploration drilling result that the Company has achieved in Morocco utilising the 3D seismic data acquired and processed in 2013-2014.

 

We are continuing with our efforts to commence production from these discoveries and are receiving much appreciated assistance from ONHYM to ensure this is achieved as soon as possible".

 

This release has been approved by Ian Conway, Gulfsands Executive Director Technical and Operations, who has Bachelors and Masters Degrees in Physics and has 28 years of experience in petroleum exploration and management. Mr. Conway has consented to the inclusion of the technical information in this release in the form and context in which it appears.

 

For further information on the matters referred to in this announcement, please refer to the Company's website www.gulfsands.com

 

Gulfsands Petroleum

+44 (0)20 7024 2130

Mahdi Sajjad, Chief Executive OfficerAlan Cutler, Director: Finance & Administration

Buchanan

+44 (0)20 7466 5000 

Bobby MorseBen Romney

 

RBC Capital Markets

 

+44 (0)20 7653 4000

Matthew Coakes

Daniel ContiJakub Brogowski

FirstEnergy Capital

+44(0)20 7448 0200

Jonathan Wright

 

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable securities legislation. These forward-looking statements are based on certain assumptions made by Gulfsands and as such are not a guarantee of future performance. Actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, increased costs of production or a decline in oil and gas prices. Gulfsands is under no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable laws.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEDFFEFISEEE
Date   Source Headline
20th Apr 20181:06 pmRNSSecondary Trading Facility
19th Apr 20182:05 pmRNSSecond Price Monitoring Extn
19th Apr 20182:00 pmRNSPrice Monitoring Extension
10th Apr 20181:22 pmRNSResults of General Meeting
21st Mar 20187:00 amRNSFinancing and Delisting
21st Mar 20187:00 amRNSOperational Update
17th Jan 20187:00 amRNSFinancing Update
28th Nov 20175:20 pmRNSMoulay Bouchta Petroleum Agreement Update
10th Nov 20177:00 amRNSMorocco Country Exit Initiated
9th Nov 20171:35 pmRNSDirector's Disclosure
11th Oct 20177:00 amRNSColombia Update -Reset of Putumayo 14 Contract
29th Sep 20177:00 amRNSHalf-year Report
13th Jul 20178:54 amRNSTunisia Update
28th Jun 20172:12 pmRNSResult of AGM
21st Jun 20177:00 amRNSMoulay Bouchta Contract Update
2nd Jun 20171:43 pmRNSPosting of Annual Report and Notice of AGM
30th May 20177:00 amRNSANNUAL AUDITED RESULTS YEAR ENDED 31 DECEMBER 2016
24th May 20177:18 amRNSColombia Update
10th May 20177:00 amRNSLlanos-50 Contract 18 Month Extension Confirmed
27th Apr 20177:00 amRNSFinance Update
16th Feb 20177:00 amRNSSecured Term Financing Facility
15th Feb 20177:00 amRNSMoulay Bouchta Extension Confirmed
3rd Jan 20178:11 amRNSDirectorate Change
29th Dec 20162:05 pmRNSSecond Price Monitoring Extn
29th Dec 20162:00 pmRNSPrice Monitoring Extension
14th Nov 20167:00 amRNSGrant of Options to Directors
8th Nov 20164:35 pmRNSLicence Update
19th Oct 201610:05 amRNSColombia Farmout Agreement Signed
10th Oct 20167:00 amRNSBoard Appointments
16th Aug 20167:00 amRNSHalf-year Report
10th Aug 20161:24 pmRNSPlacing to raise approximately £1.5 million
22nd Jul 20167:00 amRNSBoard and Management Changes
28th Jun 20167:00 amRNSClaim by Al Mashrek Group in Syria
5th May 20164:15 pmRNSResult of AGM
22nd Mar 20164:40 pmRNSSecond Price Monitoring Extn
22nd Mar 20164:35 pmRNSPrice Monitoring Extension
22nd Mar 201610:35 amRNSStmnt re Share Price Movement
18th Mar 20167:00 amRNSAnnual Financial Results 31 December 2015
11th Mar 20168:39 amRNSStatement re: Share Price Movement
4th Mar 20163:43 pmRNSHolding(s) in Company
4th Mar 20161:36 pmRNSHolding(s) in Company
18th Jan 20168:43 amRNSHolding(s) in Company
13th Jan 20164:03 pmRNSResult of Open Offer
7th Jan 201612:19 pmRNSPublication of Supplementary Prospectus
5th Jan 201610:56 amRNSExtension of Open Offer Closing Date
4th Jan 201612:46 pmRNSExtension Granted for Chorbane Permit
16th Dec 201512:36 pmRNSPublication of Prospectus
30th Nov 20153:49 pmRNSUpdate for the Rharb Petroleum Agreement
16th Oct 20157:00 amRNSUpdate for the Fes Petroleum Agreement
24th Sep 20157:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.