Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulfsands Petroleum Regulatory News (GPX)

  • There is currently no data for GPX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Morocco Operations Update - LTU-1 Well

31 Jul 2014 07:00

RNS Number : 8080N
Gulfsands Petroleum PLC
31 July 2014
 

Gulfsands Petroleum Plc

 

Morocco Operations Update - LTU-1 Well

 

London, 31st July, 2014:Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Morocco, Tunisia, Colombia and the U.S.A. is pleased to provide the following update on activities underway in Morocco.

 

Lalla Yetou Updip-1 Natural Gas Discovery

 

The Lalla Yetou Updip-1well (LTU-1), located within the Rharb Centre Permit in Northern Morocco, has been successfully drilled to a total depth of 1182 meters. The LTU-1 well flowed gas to surface, through a 28/64" choke, at an estimated rate of 6.6 million standard cubic feet per day (mmscfpd) with no formation water produced. The LTU-1 well is currently being monitored for pressure build-up, after which it will be temporarily suspended as a future gas producer.

 

Drilling operations on LTU-1 commenced on 20th June 2014 and the well was drilled to the planned total depth of 1182 meters on 1st July 2014. Elevated gas readings obtained while drilling, as well as interpretation of wireline logs, indicated the presence of a gas bearing reservoir section of 12 metres gross thickness at the pre-drill target interval depth.

 

The main reservoir encountered appears consistent with the pre-drill expectation of a turbidite distributary channel/fan complex, with laminated sand and silt layers and normal bed grading. A gas-to-water contact is interpreted in the well, based on gas shows and petrophysical data, at a depth approximately 13 metres below the gross reservoir section, also consistent with the pre-drill expectation.

 

After the conclusion of drilling and formation evaluation operations, the 12 meter gross reservoir section was perforated and a short term production clean up flow period was undertaken. Within one hour after commencing the cleanup flow period, the well had unloaded the completion fluids and was producing 100% gas to surface and with 0% bulk solids and water (BS&W). The estimated flow rate for the well, based on empirical calculation methods, was approximately 6.6 mmscfpd on a 28/64" choke. After completing the 12 hour cleanup flow period, the well was shut in for pressure build-up observations. The drilling rig will be released from the LTU-1 location, and the LTU-1 well will be temporarily suspended as a future gas producer.

 

Mahdi Sajjad, the Company's CEO commented: "We are very pleased with the successful results achieved in the LTU-1 well. This well is the first well location to be drilled following our interpretation of seismic data acquired in the recently completed Rharb 3D seismic programme which we hope will provide a firm foundation for further drilling successes on this permit.

 

I would like to congratulate all of our technical staff who contributed to the success of this operation, especially our drilling team lead by our long time drilling manager, Sabih Noori, who managed to drill and complete this well very efficiently despite a number of technical and logistical challenges that arose after the well reached target depth. The senior staff at ONHYM also deserve a special mention for the considerable assistance they have provided with various aspects of the drilling operations and testing programme which were required to be completed during the holy Ramadan period."

 

This release has been approved by Jason Oden, Gulfsands Vice President: Exploration who has a Bachelor of Science degree in Geophysics with over 28 years of experience in petroleum exploration and management and is registered as a Professional Geophysicist. Mr. Oden has consented to the inclusion of the technical information in this release in the form and context in which it appears.

 

For further information, please refer to the Company's website www.gulfsands.com or contact:

 

Gulfsands Petroleum

Mahdi Sajjad, Chief Executive OfficerKenneth Judge, Commercial Director

+44 (0)20 7024 2130

 

Buchanan

Bobby MorseBen Romney

+44 (0)20 7466 5000

 

RBC Capital Markets

Matthew Coakes

Daniel ContiTim Chapman

+44 (0)20 7653 4000

FirstEnergy Capital

Majid Shafiq

+44(0)20 7448 0200

Jonathan Wright

 

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable securities legislation. These forward-looking statements are based on certain assumptions made by Gulfsands and as such are not a guarantee of future performance. Actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, increased costs of production or a decline in oil and gas prices. Gulfsands is under no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable laws.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFMGFNGGRGDZZ
Date   Source Headline
20th Apr 20181:06 pmRNSSecondary Trading Facility
19th Apr 20182:05 pmRNSSecond Price Monitoring Extn
19th Apr 20182:00 pmRNSPrice Monitoring Extension
10th Apr 20181:22 pmRNSResults of General Meeting
21st Mar 20187:00 amRNSFinancing and Delisting
21st Mar 20187:00 amRNSOperational Update
17th Jan 20187:00 amRNSFinancing Update
28th Nov 20175:20 pmRNSMoulay Bouchta Petroleum Agreement Update
10th Nov 20177:00 amRNSMorocco Country Exit Initiated
9th Nov 20171:35 pmRNSDirector's Disclosure
11th Oct 20177:00 amRNSColombia Update -Reset of Putumayo 14 Contract
29th Sep 20177:00 amRNSHalf-year Report
13th Jul 20178:54 amRNSTunisia Update
28th Jun 20172:12 pmRNSResult of AGM
21st Jun 20177:00 amRNSMoulay Bouchta Contract Update
2nd Jun 20171:43 pmRNSPosting of Annual Report and Notice of AGM
30th May 20177:00 amRNSANNUAL AUDITED RESULTS YEAR ENDED 31 DECEMBER 2016
24th May 20177:18 amRNSColombia Update
10th May 20177:00 amRNSLlanos-50 Contract 18 Month Extension Confirmed
27th Apr 20177:00 amRNSFinance Update
16th Feb 20177:00 amRNSSecured Term Financing Facility
15th Feb 20177:00 amRNSMoulay Bouchta Extension Confirmed
3rd Jan 20178:11 amRNSDirectorate Change
29th Dec 20162:05 pmRNSSecond Price Monitoring Extn
29th Dec 20162:00 pmRNSPrice Monitoring Extension
14th Nov 20167:00 amRNSGrant of Options to Directors
8th Nov 20164:35 pmRNSLicence Update
19th Oct 201610:05 amRNSColombia Farmout Agreement Signed
10th Oct 20167:00 amRNSBoard Appointments
16th Aug 20167:00 amRNSHalf-year Report
10th Aug 20161:24 pmRNSPlacing to raise approximately £1.5 million
22nd Jul 20167:00 amRNSBoard and Management Changes
28th Jun 20167:00 amRNSClaim by Al Mashrek Group in Syria
5th May 20164:15 pmRNSResult of AGM
22nd Mar 20164:40 pmRNSSecond Price Monitoring Extn
22nd Mar 20164:35 pmRNSPrice Monitoring Extension
22nd Mar 201610:35 amRNSStmnt re Share Price Movement
18th Mar 20167:00 amRNSAnnual Financial Results 31 December 2015
11th Mar 20168:39 amRNSStatement re: Share Price Movement
4th Mar 20163:43 pmRNSHolding(s) in Company
4th Mar 20161:36 pmRNSHolding(s) in Company
18th Jan 20168:43 amRNSHolding(s) in Company
13th Jan 20164:03 pmRNSResult of Open Offer
7th Jan 201612:19 pmRNSPublication of Supplementary Prospectus
5th Jan 201610:56 amRNSExtension of Open Offer Closing Date
4th Jan 201612:46 pmRNSExtension Granted for Chorbane Permit
16th Dec 201512:36 pmRNSPublication of Prospectus
30th Nov 20153:49 pmRNSUpdate for the Rharb Petroleum Agreement
16th Oct 20157:00 amRNSUpdate for the Fes Petroleum Agreement
24th Sep 20157:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.