If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulf Keystone Petroleum Regulatory News (GKP)

Share Price Information for Gulf Keystone Petroleum (GKP)

Share Price is delayed by 15 minutes
Get Live Data
174.00    6.00 (3.57%)
Bid:
173.20
Ask:
173.60
Spread: 0.40 (0.231%)
Market Cap: £378.35m
GKP Live PriceLast checked at - London Stock Exchange

Intraday Gulf Keystone Petroleum Share Chart

Kurdistan Operational Update

19 Jul 2010 07:00

RNS Number : 5083P
Gulf Keystone Petroleum Ltd
19 July 2010
 



Not for release, publication or distribution in or into the United States or jurisdictions other than the United Kingdom and Bermuda where to do so would constitute a contravention of the relevant laws of such jurisdiction.

 

 

19 July 2010

 

 

Gulf Keystone Petroleum Ltd. (AIM: GKP)

("Gulf Keystone" or "the Company")

 

Kurdistan Operational Update:

Extended Shaikan-1 Well Test, First Production and Sheikh Adi-1 Exploration Well

 

Gulf Keystone announces the arrival of the initial loads of production facility equipment to the Shaikan field location and the commencement of the rig move by the AOS Discover-1 drilling rig to the Sheikh Adi-1 exploration well site.

 

The first pre-packaged production equipment units have arrived at the production facility construction site near the Shaikan-1 well location. This equipment together with the oil storage tanks and truck loading facility will form the basis of an 18,000 bopd capacity oil production treating and truck loading facility.

 

This facility will be used during the long term production testing of the Sargelu (upper Jurassic) oil reservoir in the Shaikan-1 discovery well (reference 12 July 2010 announcement with respect to workover rig operations). Production testing will last for at least 18 to 24 months and accumulate valuable data related to reservoir characteristics and oil recovery factors. The test volumes (estimated at 8,000 to 10,000 bopd) will generate Gulf Keystone's first oil production revenue in Kurdistan.

 

In addition, the AOS Discoverer-1 drilling rig has arrived at the Sheikh Adi-1 well site and rig up is 10% complete. This well will be Gulf Keystone's first exploration well on the Sheikh Adi block in which the Company has an 80% working interest. The well is planned to spud in August and will target the Cretaceous, Jurassic and Triassic formations. Planned total depth, depending on well results, is 3,850 meters and drilling is expected to take 6 months. The Company's estimated oil-in-place resource potential for the Sheikh Adi structure is in excess of one billion barrels.

 

Enquiries:

 

Gulf Keystone Petroleum:

+44 (0) 20 7514 1400

Todd Kozel, Executive Chairman

Ewen Ainsworth, Chief Financial Officer

Strand Hanson Limited

+44 (0)20 7409 3494

Simon Raggett / Rory Murphy / James Harris

Mirabaud Securities LLP

+44 (0)20 7878 3362

Peter Krens

Brunswick Group LLP

+44 (0) 20 7404 5959

Patrick Handley / Pip Green

 

or visit: www.gulfkeystone.com

John Gerstenlauer, the Company's Chief Operating Officer, who has 31 years of relevant experience within the sector meets the criteria of a qualified person under the AIM note for mining, oil and gas companies and has reviewed and approved the technical information contained in this announcement. Mr. Gerstenlauer is a member of the Society of Petroleum Engineers.

 

Notes to Editors:

 

§ Gulf Keystone Petroleum Ltd. (AIM: GKP) is an independent oil and gas exploration company focused on exploration in the Kurdistan region of Northern Iraq.

§ Gulf Keystone Petroleum International (GKPI) holds Production Sharing Contracts for fourexploration blocks in Kurdistan.

§ The Company's shares have traded on the AIM market, since listing on 8 Sept 2004.

§ Gulf Keystone Petroleum Limited is registered in Hamilton, Bermuda with offices in Erbil, Kurdistan, Algiers, Algeria and London, UK.

§ Oil initially-in-place is that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations prior to production. The range of uncertainty of the oil-in-place volumes is represented by a probability distribution with a low and high provided: P90 represents at least a 90% probability (high) that the quantities determined to be in place will equal or exceed the low estimate and P10 represents at least a 10% probability (low) that the quantities determined to be in place will equal or exceed the high estimate. P1 represents at least a 1% probability that the quantities determined to be in place will equal or exceed the ultimate upside estimate.

 

 

 

Not for release, publication or distribution, directly or indirectly, in or into the United States or jurisdictions other than the United Kingdom and Bermuda where to do so would constitute a contravention of the relevant laws of such jurisdiction. This document (and the information contained herein) does not contain or constitute an offer of securities for sale, or solicitation of an offer to purchase securities, in the United States or jurisdictions other than the United Kingdom and Bermuda where to do so would constitute a contravention of the relevant laws of such jurisdiction. The securities referred to herein have not been and will not be registered under the US Securities Act of 1933, as amended (the "Securities Act"), and may not be offered or sold in the United States unless the securities are registered under the Securities Act, or an exemption from the registration requirements of the Securities Act is available. No public offering of the securities will be made in the United States.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGUMCMUPUGAQ
Date   Source Headline
13th Sep 20107:00 amRNSHalf Yearly Report
3rd Sep 20107:00 amRNSCommencement of Drilling Operations on SH-3 Well
11th Aug 20107:00 amRNSKurdistan Operational Update
9th Aug 20107:00 amRNSRe-organisation of Interests in Kurdistan Complete
5th Aug 20107:00 amRNSJurassic Zone Testing on the SH -1 Discovery Well
4th Aug 201010:10 amRNSKurdistan Operational Update
3rd Aug 20101:17 pmRNSRESULTS OF ANNUAL GENERAL MEETING
19th Jul 20107:00 amRNSKurdistan Operational Update
12th Jul 20107:00 amRNSAdditional Well Testing Commences at Shaikan-1
30th Jun 20104:31 pmRNSNotice of AGM
30th Jun 201010:58 amRNSAnnual Report and Accounts 2009
25th Jun 20107:00 amRNSBonus Shares and Long Term Incentive Plan Options
23rd Jun 20107:32 amRNSOperational Update - Bijeel-1 Exploration Well
2nd Jun 20103:35 pmRNSHolding(s) in Company
25th May 20103:24 pmRNSInvestor Presentation
25th May 20107:00 amRNSCapital Raising & Kurdistan Drilling Update
4th May 20107:00 amRNSDraw Down of Funds and Issue of Equity
1st Apr 20103:26 pmRNSDirector Sale of Shares
1st Apr 20107:00 amRNSDirectorate Change
29th Mar 20107:00 amRNSBonus Shares
15th Mar 201010:29 amRNSKurdistan Update & Interim Placing Replacement
15th Mar 20107:00 amRNSKurdistan Drilling Update & Interim Placing
10th Mar 20107:00 amRNSETAMIC Announcement
9th Mar 20104:13 pmRNSOil Discovery on Bijeel-1 Exploration Well
8th Mar 20107:00 amRNSDraw Down of Funds and Issue of Equity
18th Feb 20107:00 amRNSGKP concludes Settlement Agreement with BG on HBH
26th Jan 20109:09 amRNSDraw Down of Funds and Issue of Equity
14th Jan 20107:00 amRNSSignificantly Increased OIP Numbers for Shaikan-1
14th Jan 20107:00 amRNSInvestor Presentation
22nd Dec 20099:51 amRNSDraw Down of Funds and Issue of Equity
15th Dec 20097:00 amRNSSpudding of Bijeel-1
30th Nov 20094:47 pmRNSInvestor Presentation
30th Nov 20094:35 pmRNSPrice Monitoring Extension
26th Nov 20094:26 pmRNSHolding(s) in Company
23rd Nov 20097:00 amRNSFurther Triassic Discoveries
13th Nov 20093:19 pmRNSDraw Down of Funds and Issue of Equity
2nd Nov 200912:05 pmRNSHolding(s) in Company
22nd Oct 20097:00 amRNSPreliminary Evaluation of Shaikan-1 Discovery
15th Oct 20094:27 pmRNSChange of Name of Nominated Adviser
13th Oct 20097:00 amRNSAppointment of Nominated Adviser and Broker
12th Oct 20097:00 amRNSDraw Down of Funds and Issue of Equity
6th Oct 200910:53 amRNSTotal Voting Rights
6th Oct 20097:00 amRNSShaikan-1 Triassic Discovery
30th Sep 20097:00 amRNSHalf Yearly Report
30th Sep 20097:00 amRNSShaikan-1 Drilling update
28th Sep 20092:17 pmRNSInvestor Presentation
18th Sep 20091:39 pmRNSStatement re. Press Comment
18th Sep 20097:00 amRNSIndependent E&P Consultant and Drilling Update
16th Sep 20097:00 amRNSHolding(s) in Company
10th Sep 20097:00 amRNSNotice of Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.