Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGulf Keystone Petroleum Regulatory News (GKP)

Share Price Information for Gulf Keystone Petroleum (GKP)

Share Price is delayed by 15 minutes
Get Live Data
184.40    -4.00 (-2.12%)
Bid:
184.20
Ask:
185.20
Spread: 1.00 (0.543%)
Market Cap: £400.97m
GKP Live PriceLast checked at - London Stock Exchange

Intraday Gulf Keystone Petroleum Share Chart

Additional Well Testing Commences at Shaikan-1

12 Jul 2010 07:00

RNS Number : 1753P
Gulf Keystone Petroleum Ltd
12 July 2010
 



Not for release, publication or distribution in or into the United States or jurisdictions other than the United Kingdom and Bermuda where to do so would constitute a contravention of the relevant laws of such jurisdiction.

 

 

12 July 2010

 

 

Gulf Keystone Petroleum Ltd. (AIM: GKP)

("Gulf Keystone" or "the Company")

 

Additional Well Testing Commences at Shaikan-1

 

Gulf Keystone announces the commencement of workover/testing operations on the Shaikan-1 discovery well.

 

The Company will execute the following work programme in the given sequence:

 

1. Zone three: Re-test the Butmah (lower Jurassic) formation, from 1,783 metres to 1,814 metres depth in the well. This is a very high permeability but low energy zone due to low gas content. The zone, which originally lacked sufficient energy to flow to surface, will be re-tested using a 350 hp Electric Submersible Pump ("ESP") that will more adequately test the inflow capabilities of this zone. 

2. Zone two: Re-test the Mus (upper Jurassic) formation, from 1,627 metres to 1,667 metres. This is also a very high permeability zone with little reservoir energy due to the general lack of associated gas (low gas-oil-ratio or "GOR"). This zone, which originally tested at 120 bopd, will also be re-tested using the same 350 hp ESP.

3. Zone one: Complete the well for long term production testing (18 to 24 months) in the original discovery zone, the Sargelu (upper Jurassic, 1,450 metres to 1,510 metres). This zone has a higher GOR, in the range of 120 cubic feet of gas per barrel of oil, and demonstrated natural flow rates of almost 7,500 bopd, despite the limitations of the original test equipment. It is the current intention that this production will be processed, through the facilities currently being constructed, and sold. 

4. Drill an appraisal well through the Cretaceous intervals, 50 metres to the east of the existing Shaikan-1 well. Much of the Cretaceous age interval could not be properly logged and evaluated during the initial drilling of the Shaikan-1 well due to a lack of drilling mud returns. Our evaluation of small portions of well logs from the initial drilling would seem to indicate that the Cretaceous intervals may hold significant quantities of recoverable oil. These oil volumes could be substantial (estimated by Dynamic Global Advisors at more than 700 million barrels of oil-in-place) and were not fully taken account of in current resource estimates.

Test zones 4 and 5, which flowed 1,700 bopd and 10,000 boepd respectively, will not be re-entered. The entire workover and drilling program is estimated to take four to five months to complete.

 

 

Enquiries:

 

Gulf Keystone Petroleum:

+44 (0) 20 7514 1400

Todd Kozel, Executive Chairman

Ewen Ainsworth, Chief Financial Officer

Strand Hanson Limited

+44 (0)20 7409 3494

Simon Raggett / Rory Murphy / James Harris

Mirabaud Securities LLP

+44 (0)20 7878 3362

Peter Krens

Brunswick Group LLP

+44 (0) 20 7404 5959

Patrick Handley / Pip Green

 

or visit: www.gulfkeystone.com

John Gerstenlauer, the Company's Chief Operating Officer, who has 31 years of relevant experience within the sector meets the criteria of a qualified person under the AIM note for mining, oil and gas companies and has reviewed and approved the technical information contained in this announcement. Mr. Gerstenlauer is a member of the Society of Petroleum Engineers.

 

Notes to Editors:

 

§ Gulf Keystone Petroleum Ltd. (AIM: GKP) is an independent oil and gas exploration company focused on exploration in the Kurdistan region of Northern Iraq.

§ Gulf Keystone Petroleum International (GKPI) holds Production Sharing Contracts for fourexploration blocks in Kurdistan.

§ The Company's shares have traded on the AIM market, since listing on 8 Sept 2004.

§ Gulf Keystone Petroleum Limited is registered in Hamilton, Bermuda with offices in Erbil, Kurdistan, Algiers, Algeria and London, UK.

§ Oil initially-in-place is that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations prior to production. The range of uncertainty of the oil-in-place volumes is represented by a probability distribution with a low and high provided: P90 represents at least a 90% probability (high) that the quantities determined to be in place will equal or exceed the low estimate and P10 represents at least a 10% probability (low) that the quantities determined to be in place will equal or exceed the high estimate. P1 represents at least a 1% probability that the quantities determined to be in place will equal or exceed the ultimate upside estimate.

 

 

 

Not for release, publication or distribution, directly or indirectly, in or into the United States or jurisdictions other than the United Kingdom and Bermuda where to do so would constitute a contravention of the relevant laws of such jurisdiction. This document (and the information contained herein) does not contain or constitute an offer of securities for sale, or solicitation of an offer to purchase securities, in the United States or jurisdictions other than the United Kingdom and Bermuda where to do so would constitute a contravention of the relevant laws of such jurisdiction. The securities referred to herein have not been and will not be registered under the US Securities Act of 1933, as amended (the "Securities Act"), and may not be offered or sold in the United States unless the securities are registered under the Securities Act, or an exemption from the registration requirements of the Securities Act is available. No public offering of the securities will be made in the United States.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDXGDRLBBBGGB
Date   Source Headline
19th May 20267:00 amEQSNotice of Annual General Meeting
6th May 20264:41 pmEQSBlock Listing Six Monthly Return
22nd Apr 20267:01 amEQSInterim Dividend Exchange Rate
9th Apr 20267:01 amEQSGKP shares trade ex-dividend today
8th Apr 20264:41 pmEQSLong Term Incentive Plan (“LTIP”) Award
2nd Apr 20267:01 amEQSPublication of 2025 Annual Report and Accounts & Sustainability Report
2nd Apr 20267:01 amEQSReport on Payments to Governments for 2025
2nd Apr 20267:01 amEQSImplementation of cross border transfers between the LSE and Euronext Growth Oslo
1st Apr 20264:41 pmEQSDirector / PDMR Shareholdings and issue of awards under the Deferred Bonus Plan ('DBP')
24th Mar 20263:31 pmEQSDirector / PDMR Shareholdings
19th Mar 20267:01 amEQS2025 Full Year Results Announcement
19th Mar 20267:01 amEQSInterim dividend information
19th Mar 20267:01 amEQSInterim dividend information
17th Mar 20267:01 amEQSNotice of 2025 Full Year Results
17th Mar 20267:00 amRNSNotice of 2025 Full Year Results
16th Mar 20262:46 pmEQSTR-1: notification of major holdings
16th Mar 20262:45 pmRNSTR-1: notification of major holdings
2nd Mar 20267:00 amEQSUpdate on Shaikan Field operations
18th Feb 20267:00 amEQSFirst day of trading on Euronext Growth Oslo
17th Feb 20267:00 amEQSPublication of Information Document
16th Feb 20269:35 amEQSRegistration of new share capital and total voting rights
13th Feb 20266:20 pmEQSRetail offering successfully completed and update on Euronext Growth Oslo listing
4th Feb 20267:00 amEQSIntention to complete listing on Euronext Growth Oslo and fully underwritten retail offer
22nd Jan 20267:00 amEQSOperational & Corporate Update
10th Dec 20257:00 amEQSOperational & Corporate Update
17th Nov 20257:01 amEQSFirst lifting of IOC pipeline exports
3rd Nov 20257:01 amEQSBlock Listing Six Monthly Return
29th Sep 20257:01 amEQSRestart of Shaikan Field pipeline exports
26th Sep 20257:01 amEQSRestart of Kurdistan crude exports via the Iraq-Türkiye Pipeline
18th Sep 20257:01 amEQSInterim Dividend Exchange Rate
2nd Sep 20257:00 amEQSDividend Currency Elections
28th Aug 20257:00 amEQS2025 Half Year Results Announcement
13th Aug 20257:00 amRNSNotice of HY25 Results & Operational Update
16th Jul 20257:50 amEQSUpdate on Shaikan Field operations
20th Jun 202510:30 amEQSResult of AGM
20th Jun 20257:00 amEQS2025 AGM Operational & Corporate Update
15th May 20257:01 amEQSNotice of Annual General Meeting
2nd May 20257:01 amEQSBlock Listing Six Monthly Return
24th Apr 20257:01 amEQSDirector / PDMR Shareholdings
10th Apr 20257:01 amEQSInterim Dividend Exchange Rate
4th Apr 20257:01 amEQSLong Term Incentive Plan (“LTIP”) Award
4th Apr 20257:01 amEQSDirector / PDMR Shareholdings
2nd Apr 20257:02 amEQSReport on Payments to Governments for 2024
2nd Apr 20257:01 amEQSPublication of 2024 Annual Report and Accounts & Sustainability Report
1st Apr 20254:39 pmEQSIssue under the Deferred Bonus Plan ('DBP')
24th Mar 202512:22 pmEQSDividend Currency Elections
20th Mar 20257:02 amEQS2024 Full Year Results Announcement
27th Feb 20257:01 amEQSNotice of 2024 Full Year Results and Investor Presentations
27th Jan 20253:56 pmEQSDirector / PDMR Shareholding
23rd Jan 20257:00 amEQSOperational & Corporate Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.