Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGeorgina Energy Regulatory News (GEX)

Share Price Information for Georgina Energy (GEX)

Share Price is delayed by 15 minutes
Get Live Data
6.00    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.20 (3.39%)
Market Cap: £11.26m
GEX Live PriceLast checked at - London Stock Exchange

Intraday Georgina Energy Share Chart

Drilling Update

11 Nov 2005 11:04

Glencar Mining PLC11 November 2005 GLENCAR MINING PLC Glencar to Commence Drilling in Mali 11 November 2005 Glencar is pleased to announce that the drilling programme at Komana in Mali isscheduled to commence next week. Approximately 2,200 metres of reversecirculation drilling are planned on the Komana West mineralised shear system.The Komana West target is a north-south trending shear system with associatedextensive artisanal mining activity over a strike length of at least 1 kilometreand the programme is designed to intersect the mineralised shear system beneaththe artisanal workings. Geological and structural mapping carried out by Glencar at Komana West haslocated a significant mineralised zone hosted by metasedimentary rocks withclosely associated intrusive rocks of granitic composition, all within the north-south shear zone. Artisanal workings have shown that the mineralisation existsat depths of up to 60 metres from surface, at which depth the water table hasprecluded the artisanal miners from further mining. Previous sampling at KomanaWest has yielded grades from grab samples of up to 108 g/t. At the end of thelast field season, in June last, a rock sampling programme at Komana Westincluded the sampling of an east-west trending quartz vein system within theshear envelope. 19 grab samples were sampled from a 19 metres long north-southpanel along the exposure. Of the 19 quartz vein grab samples taken 16 returnedvalues of greater than 0.5g/t and the average grade of the 19 samples was 5.8g/t. The drilling programme will consist of 23 holes of average depth 95 metres. Allholes will be assayed for gold on a per metre basis. The results of the drilling programme are expected to be available early inJanuary 2006. The Komana licence is not part of the proposed agreement with Gold Fields. GoldFields may earn a 65% interest in the Bokoro, Sanioumale and Farasaba Licencesat Sankarani, through phased exploration expenditures on these licencestotalling US$12 million. The proposed agreement with Gold Fields is currentlybeing finalised, legal and technical due diligence having been satisfactorilycompleted. For Further Information contact: Glencar Mining plcHugh McCulloughTel: +353 1 661 9974e-mail: info@glencarmining.ie Heneghan PRRachel WatchornTel: +353 1 6607395e-mail: rachel@hpr.ie This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 202610:28 amRNSRepayment of Debt
2nd Jun 20267:00 amRNSIssue of Equity
1st Jun 202610:49 amRNSCompletion of £1 Million Fundraise
29th May 20269:03 amRNSAudited Final Results for Year Ended 31 Jan 2026
27th May 20264:42 pmRNSExercise of Warrants
26th May 20267:00 amRNSHussar EP513 Pre-Drill Works
22nd May 20268:16 amRNSIssue of Equity
20th May 20267:00 amRNSHussar EP513 Drill Contract Executed
6th May 202610:27 amRNSTermination of share purchase agreement
1st May 20267:04 amRNSCompletion of £1 Million Fundraise
28th Apr 202611:17 amRNSIssue of Equity
20th Apr 202611:59 amRNSResults of General Meeting
16th Apr 20269:48 amRNSHussar EP513 Drill Contract
27th Mar 20267:10 amRNSNet Asset Value(s)
25th Mar 20265:07 pmRNSPosting of Circular and Notice of AGM
13th Mar 20267:10 amRNSNet Asset Value(s)
12th Mar 20267:00 amRNSHussar EP513 Drill Contract Update
10th Mar 20267:10 amRNSNet Asset Value(s)
4th Mar 20267:00 amRNSHussar EP513 Drill Preparations Update
24th Feb 20267:00 amRNSMt Winter EPA 155 ALRA RECEIVED
17th Feb 20267:00 amRNSHussar EP513 Site Inspection
13th Feb 20267:30 amRNS-RBroker Research Initiation
5th Feb 20267:00 amRNSHussar EP513 Drill Operations Site Inspection
30th Jan 202611:16 amRNSDebt Drawdown of £500,000
29th Jan 20261:17 pmRNSHolding(s) in Company
26th Jan 20267:00 amRNSHussar EP513 Drilling/Funding
19th Dec 20257:00 amRNSOFFTAKE MOU EXTENSION EXECUTED
19th Dec 20257:00 amRNSOFFTAKE MOU EXTENSION EXECUTED
9th Dec 20257:00 amRNSOperational Update
20th Nov 20257:16 amRNSExpression of Interest to Fund Hussar EP513
14th Nov 20257:00 amRNSReplacement: Placing and Debt Facility
11th Nov 202510:00 amRNSACQUISITION OF ADDITIONAL RE-ENTRY TARGETS
4th Nov 20259:23 amRNSPlacing and Debt Facility
31st Oct 20257:47 amRNSHussar EP513 Drilling Approval
30th Oct 202511:20 amRNSHussar EP513 Drilling Approval Obtained
27th Oct 20257:33 amRNSInterim Results
22nd Oct 202510:52 amRNSHussar EP513 Environmental Plan APPROVAL
28th Aug 202510:53 amRNS£1m Fundraise to Advance Hussar & Mt Winter
28th Aug 20257:44 amRNSOFF-TAKE MOU EXECUTED AND PERMIT UPDATE
26th Aug 20257:01 amRNSOFFTAKE PROPOSAL & Helium-3 POTENTIAL
19th Aug 20257:00 amRNSMt Winter EPA 155 Update
18th Aug 20257:00 amRNSHussar EP513 Drilling Approval Update
6th Aug 20251:07 pmRNSResult of AGM
14th Jul 20257:00 amRNSHussar EP513 WELL MANAGEMENT PLAN APPROVAL
10th Jul 20257:00 amRNSRevised Resource Upgrade of 37.8% EPA155 Mt Winter
8th Jul 20257:00 amRNSMt Winter EPA 155 Update
7th Jul 20258:30 amRNSNotice of Annual General Meeting
7th Jul 20257:00 amRNSHussar EP513 Update
4th Jul 20254:00 pmRNSRestoration of Trading
30th Jun 20257:00 amRNS2025 Audited Final Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.