Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGCM Resources Regulatory News (GCM)

Share Price Information for GCM Resources (GCM)

Share Price is delayed by 15 minutes
Get Live Data
4.05    0.00 (0.00%)
Bid:
3.90
Ask:
4.20
Spread: 0.30 (7.692%)
Market Cap: £15.00m
GCM Live PriceLast checked at - London Stock Exchange

Intraday GCM Resources Share Chart

Glencar Exploration Update

4 Feb 2005 10:39

Glencar Mining PLC04 February 2005 Glencar Mining plc ("Glencar" or the "Company") Glencar Exploration Update Glencar Mining plc is pleased to announce details of the progress on itsexploration activities in Mali, Ghana and Uganda. Work has proceededsatisfactorily and according to plan on all three projects. Sankarani Project, Mali Fifteen high priority targets were identified in the recently completed regolithstudy and detailed, follow up geochemical sampling has now been completed oneight of the fifteen targets. A geophysical study of the area has also beencompleted based on the recently flown aeromagnetic survey, the results of whichwere released by the Mali Government in June 2004. A detailed geological/structural mapping programme is expected to be completed before end March 2005.The objective of the current work programme is to define between three and fivedrilling targets prior to end March 2005. The geochemical sampling results have been important in the definition andprioritisation of the selected targets. These results will be assessed inconjunction with the geophysics and the detailed geological/structural mappingto assist in the final definition of the drill targets. Discussions havealready opened with drill contractors in the region. Asheba Project, Ghana The pitting programme around the Atinasi North area has been completed.Results received to date confirm the potential extension of the drillintersected mineralisation both to the northwest and to the northeast of theexisting Atinasi drill grid. In addition, positive results from pits excavatedand sampled along two traverse lines crossing the inferred contact of thegreenstone with a dioritic intrusive body some 250m northwest of the Alabee zoneappear to confirm the prospectivity in this direction also. A structuralmapping study has recently been completed by a specialist consultant and hisreport is expected during February. A geostatistical analysis of the drillingresults to date has been commissioned and will be completed before end February. We expect to be in a position then to determine the next round of drillingat Asheba which will be commenced as soon as possible thereafter. The drill results already obtained at Atinasi North highlight the prospectivityof this area, with intersections of 3 metres at 20.5 grams/tonne, 9 metres at11.0 grams/tonne and 12 metres at 12.1 grams/tonne indicating clear potentialfor a commercial discovery. Buinja Project, Uganda Results have been received for the October/November field programme whichcomprised of trenching, pitting and rock float sampling. Gold mineralisationintersected was low grade and over narrow width. At Nasango the best grade was1metre at 1.4grams/tonne from a horizontal channel at a depth of 4 metres in thepit at the northern end of the profile. At Namaingo the pit profile lineproduced 3 anomalous pits with highest grade of 0.45grams/tonne from a 1 metrehorizontal channel sample at 2.2 metres depth. The best grade from the shorttrenching programme at Namaingo was 1metre at 0.3grams/tonne. At Siavona we have extended the mapping and float sampling programme that hadyielded the auriferous rock samples believed to be close to their in situsource. 76 additional rock samples were collected at Siavona. None of thesamples yielded significant gold values. A pitting programme is planned for Glencar's other concession area adjacent tothe Tira mine, before the end of April 2005. Outlook We are pleased with exploration progress so far. At Asheba, we believe thatthe time and resources invested in the careful and comprehensive review of theresults to date, coupled with the work in hand, referred to above, will benefitthe upcoming drill programme there. The results from the Sankarani Project in Mali continue to confirm our view thatthese licences, with their very favourable geological and structural setting,show the potential to host gold deposits of world class such as those at Morilaand Sadiola, just two of the currently operating major deposits in a similarsetting in Mali. We hope that the work programme which we are currentlyengaged in will lead to an exciting and successful drilling programme atSankarani early in the second quarter of 2005. For further information contact: Hugh McCulloughChief ExecutiveGlencar Mining plcTel: + 353 1 661 9974Fax: + 353 1 661 1205 This announcement has been issued through the Companies Announcement Service of The Irish Stock Exchange This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
19th Oct 20212:01 pmRNSPrice Monitoring Extension
19th Oct 202111:43 amRNSFramework Agreement Update
27th Sep 20217:00 amRNSChinese President’s address to the UN
22nd Sep 20212:06 pmRNSSecond Price Monitoring Extn
22nd Sep 20212:01 pmRNSPrice Monitoring Extension
22nd Sep 202111:06 amRNSSecond Price Monitoring Extn
22nd Sep 202111:00 amRNSPrice Monitoring Extension
31st Aug 20214:59 pmRNSMemorandum of Understanding
2nd Jun 20211:37 pmRNSMOU Extension
30th Apr 20212:14 pmRNSShare issue - Consultants
26th Mar 20212:13 pmRNSResult of Placing
26th Mar 202111:02 amRNSProposed Placing and Extension of Loan Facility
22nd Mar 202112:00 pmRNSInterim Results
17th Mar 20212:55 pmRNSProject Update
9th Mar 20212:05 pmRNSSecond Price Monitoring Extn
9th Mar 20212:00 pmRNSPrice Monitoring Extension
25th Feb 20211:17 pmRNSResults of AGM and Capital Reorganisation
1st Feb 20219:50 amRNSNotice of AGM and Capital Reorganisation
22nd Jan 202110:58 amRNSAppointment of Director
19th Jan 202112:56 pmRNSExtension of JV Agreements with PowerChina
15th Jan 20213:57 pmRNSJoint Venture Update
11th Jan 202111:05 amRNSSecond Price Monitoring Extn
11th Jan 202111:00 amRNSPrice Monitoring Extension
11th Jan 20219:05 amRNSSecond Price Monitoring Extn
11th Jan 20219:00 amRNSPrice Monitoring Extension
11th Jan 20217:30 amRNSRestoration - GCM Resources PLC
11th Jan 20217:00 amRNSNOMAD & Broker appointment, Board changes
7th Jan 20217:00 amRNSRelationship Agreement with Polo Resources
6th Jan 20217:30 amRNSSuspension - GCM Resources PLC
6th Jan 20217:00 amRNSSuspension and Update on Nominated Adviser/Broker
5th Jan 20212:05 pmRNSSecond Price Monitoring Extn
5th Jan 20212:00 pmRNSPrice Monitoring Extension
23rd Dec 20202:06 pmRNSSecond Price Monitoring Extn
23rd Dec 20202:01 pmRNSPrice Monitoring Extension
22nd Dec 20202:45 pmRNSFinal Results for the year ended 30 June 2020
4th Dec 20204:40 pmRNSSecond Price Monitoring Extn
4th Dec 20204:35 pmRNSPrice Monitoring Extension
4th Dec 20202:05 pmRNSSecond Price Monitoring Extn
4th Dec 20202:00 pmRNSPrice Monitoring Extension
4th Dec 202012:00 pmRNSResignation of Nomad and Broker and MOU Extension
27th Oct 20202:06 pmRNSSecond Price Monitoring Extn
27th Oct 20202:00 pmRNSPrice Monitoring Extension
16th Oct 20204:41 pmRNSSecond Price Monitoring Extn
16th Oct 20204:35 pmRNSPrice Monitoring Extension
16th Oct 20202:00 pmRNSPrice Monitoring Extension
15th Oct 20204:40 pmRNSSecond Price Monitoring Extn
15th Oct 20204:35 pmRNSPrice Monitoring Extension
15th Oct 202011:05 amRNSSecond Price Monitoring Extn
15th Oct 202011:00 amRNSPrice Monitoring Extension
15th Oct 20209:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.