Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGCM Resources Regulatory News (GCM)

Share Price Information for GCM Resources (GCM)

Share Price is delayed by 15 minutes
Get Live Data
3.65    -0.25 (-6.41%)
Bid:
3.50
Ask:
3.80
Spread: 0.30 (8.571%)
Market Cap: £13.69m
GCM Live PriceLast checked at - London Stock Exchange

Intraday GCM Resources Share Chart

Glencar Exploration Update

4 Feb 2005 10:39

Glencar Mining PLC04 February 2005 Glencar Mining plc ("Glencar" or the "Company") Glencar Exploration Update Glencar Mining plc is pleased to announce details of the progress on itsexploration activities in Mali, Ghana and Uganda. Work has proceededsatisfactorily and according to plan on all three projects. Sankarani Project, Mali Fifteen high priority targets were identified in the recently completed regolithstudy and detailed, follow up geochemical sampling has now been completed oneight of the fifteen targets. A geophysical study of the area has also beencompleted based on the recently flown aeromagnetic survey, the results of whichwere released by the Mali Government in June 2004. A detailed geological/structural mapping programme is expected to be completed before end March 2005.The objective of the current work programme is to define between three and fivedrilling targets prior to end March 2005. The geochemical sampling results have been important in the definition andprioritisation of the selected targets. These results will be assessed inconjunction with the geophysics and the detailed geological/structural mappingto assist in the final definition of the drill targets. Discussions havealready opened with drill contractors in the region. Asheba Project, Ghana The pitting programme around the Atinasi North area has been completed.Results received to date confirm the potential extension of the drillintersected mineralisation both to the northwest and to the northeast of theexisting Atinasi drill grid. In addition, positive results from pits excavatedand sampled along two traverse lines crossing the inferred contact of thegreenstone with a dioritic intrusive body some 250m northwest of the Alabee zoneappear to confirm the prospectivity in this direction also. A structuralmapping study has recently been completed by a specialist consultant and hisreport is expected during February. A geostatistical analysis of the drillingresults to date has been commissioned and will be completed before end February. We expect to be in a position then to determine the next round of drillingat Asheba which will be commenced as soon as possible thereafter. The drill results already obtained at Atinasi North highlight the prospectivityof this area, with intersections of 3 metres at 20.5 grams/tonne, 9 metres at11.0 grams/tonne and 12 metres at 12.1 grams/tonne indicating clear potentialfor a commercial discovery. Buinja Project, Uganda Results have been received for the October/November field programme whichcomprised of trenching, pitting and rock float sampling. Gold mineralisationintersected was low grade and over narrow width. At Nasango the best grade was1metre at 1.4grams/tonne from a horizontal channel at a depth of 4 metres in thepit at the northern end of the profile. At Namaingo the pit profile lineproduced 3 anomalous pits with highest grade of 0.45grams/tonne from a 1 metrehorizontal channel sample at 2.2 metres depth. The best grade from the shorttrenching programme at Namaingo was 1metre at 0.3grams/tonne. At Siavona we have extended the mapping and float sampling programme that hadyielded the auriferous rock samples believed to be close to their in situsource. 76 additional rock samples were collected at Siavona. None of thesamples yielded significant gold values. A pitting programme is planned for Glencar's other concession area adjacent tothe Tira mine, before the end of April 2005. Outlook We are pleased with exploration progress so far. At Asheba, we believe thatthe time and resources invested in the careful and comprehensive review of theresults to date, coupled with the work in hand, referred to above, will benefitthe upcoming drill programme there. The results from the Sankarani Project in Mali continue to confirm our view thatthese licences, with their very favourable geological and structural setting,show the potential to host gold deposits of world class such as those at Morilaand Sadiola, just two of the currently operating major deposits in a similarsetting in Mali. We hope that the work programme which we are currentlyengaged in will lead to an exciting and successful drilling programme atSankarani early in the second quarter of 2005. For further information contact: Hugh McCulloughChief ExecutiveGlencar Mining plcTel: + 353 1 661 9974Fax: + 353 1 661 1205 This announcement has been issued through the Companies Announcement Service of The Irish Stock Exchange This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
27th Jun 20173:35 pmRNSHolding(s) in Company
27th Jun 20171:36 pmRNSShare Issue - Convertible Loan Facility Settlement
20th Jun 20173:56 pmRNSHolding(s) in Company
20th Jun 20173:54 pmRNSHolding(s) in Company
20th Jun 20173:50 pmRNSSettlement of Convertible Loan Facility
26th May 20171:15 pmRNSHolding(s) in Company
25th May 20175:23 pmRNSHolding(s) in Company
25th May 20175:21 pmRNSHolding(s) in Company
19th May 20175:14 pmRNSHolding(s) in Company
19th May 20173:55 pmRNSHolding(s) in Company
19th May 201711:49 amRNSHolding(s) in Company
18th May 20174:55 pmRNSPower Plant Consulting Agreement
23rd Mar 201712:40 pmRNSHalf-year Report
8th Mar 20179:52 amRNSHolding(s) in Company
20th Jan 201710:17 amRNSHolding(s) in Company - Correction
18th Jan 20179:24 amRNSHolding(s) in Company
11th Jan 20173:17 pmRNSHolding(s) in Company
15th Dec 201612:31 pmRNSResult of AGM
18th Nov 20163:00 pmRNSAGM and Annual Accounts
18th Nov 201610:39 amRNSDirector Appointment
17th Nov 20161:45 pmRNSFinal Results
14th Nov 20164:40 pmRNSSecond Price Monitoring Extn
14th Nov 20164:35 pmRNSPrice Monitoring Extension
11th Nov 201612:46 pmRNSMemorandum of Understanding
27th Sep 20163:03 pmRNSFurther re Press Speculation
23rd Sep 201612:16 pmRNSPress Speculation
20th Sep 20162:00 pmRNSAdoption of FRS101
30th Aug 20161:54 pmRNSHolding(s) in Company
19th Aug 201610:16 amRNSDirectorate Change
21st Apr 20164:40 pmRNSSecond Price Monitoring Extn
21st Apr 20164:35 pmRNSPrice Monitoring Extension
12th Apr 20162:30 pmRNSStatement re Share Price Movement
30th Mar 201610:45 amRNSInterim results for the 6 months ended 31 Dec 2015
18th Dec 201512:43 pmRNSResult of AGM
25th Nov 20151:25 pmRNSAGM & Annual Accounts
25th Nov 20159:00 amRNSAward of options
24th Nov 20152:00 pmRNSPreliminary Results for year ended 30 June 2015
30th Sep 201510:00 amRNSDirectorate Changes
10th Sep 20152:05 pmRNSOECD Process Concludes on Release of Final Report
29th May 20154:27 pmRNSAward of options
29th May 20154:16 pmRNSConvertible loan agreement for £3 million
27th Feb 201510:17 amRNSInterim results for the six months ended 31 Dec 14
20th Nov 201410:06 amRNSUpdate on OECD examination
13th Nov 20141:00 pmRNSAnnual General Meeting and Annual Accounts
12th Nov 20144:03 pmRNSPreliminary Results for the year ended 30 Jun 2014
29th Sep 20141:37 pmRNSOECD review
20th Jun 20141:38 pmRNSHolding(s) in Company
20th Jun 20147:00 amRNSUpdate on OECD examination
9th Jun 20147:00 amRNSHolding(s) in Company
7th Apr 201411:04 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.