Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGCM Resources Regulatory News (GCM)

Share Price Information for GCM Resources (GCM)

Share Price is delayed by 15 minutes
Get Live Data
4.00    -0.30 (-6.98%)
Bid:
3.90
Ask:
4.10
Spread: 0.20 (5.128%)
Market Cap: £15.00m
GCM Live PriceLast checked at - London Stock Exchange

Intraday GCM Resources Share Chart

Coal Quality Update

12 Jan 2005 10:53

Asia Energy PLC12 January 2005 Asia Energy PLC Tests of Coal Quality at Asia Energy's Phulbari Deposit Indicate Presence of High Quality Export Coal Products 12th January 2005 Asia Energy PLC ("Asia Energy" or "the Company") announces today that coresample analysis from recent drilling at its Phulbari Coal Project ("the Project") in north-west Bangladesh confirms expectations of a bituminous coal with HighVolatiles, Low Ash, and good calorific value. Laboratory testing workindicates that some of Phulbari's coal production may be suitable for sale tothe metallurgical export markets either as a Semi-Soft Coking Coal or as aPulverised Coal Injection ("PCI") coal. Float-sink testing conducted at the ACIRL laboratories in Brisbane, Australia,and review by QCC Resources Pty Ltd ("QCC") indicate that a range of coalproducts suitable for both the export and domestic markets may be extracted fromthe coal by upgrading from a simple crushing and sizing installation to astate-of-the-art Coal Processing Plant, utilising proven dense medium separationtechnology. This will allow the extraction of economic quantities of Semi-SoftCoking Coal (CSN 3 to 4) and/or PCI grade coal (ash 8% air dried), both of whichare used in steel making processes, as well as export quality thermal coal (6800kcal/kg air dried basis). Detailed properties of all potential products are being determined to evaluatethe optimum target markets and project economics. On this basis, additional coresampling of larger diameter drill holes (200 mm) will be necessary to determinethe process equipment requirements, potential product mix and comprehensive coalquality specifications for the planned coal production. Extraction of premium coal products from Phulbari has implications for the CoalHandling and Process Plant designs being built into the on-going DefinitiveFeasibility Study ("DFS"). The engineering studies of Run-of-Mine coal handling,process plant requirements, and product handling at the Project's planned mineand port are being expanded accordingly. The coal processing and engineeringwork is being undertaken in concert by GHD Pty Ltd and QCC, Asia Energy'sconsultants in these fields. Similarly, changes are required to the DFS marketing study to take account ofthe potential to mine these higher value products. AME Mineral Economics, basedin Sydney, Australia, were recently appointed to provide an analysis of existingand future markets for coal products from the Project. "The presence of these premium coal products within the Phulbari coal measuresshould significantly broaden the potential markets for the Company's future coalproduction and enhance the project economics", commented Asia Energy's JointManaging Director Mr David Lenigas. ABOUT ASIA ENERGY PLC Asia Energy PLC is a London-based AIM quoted company whose primary activity isthe development of an open cast coal mine at Phulbari in north-west Bangladeshwhich has been projected to produce 15 million tonnes of high quality coal peryear. The Company is currently carrying out an intensive drilling programme onthe basin as part of the DFS that is due for completion in 2005 with theobjective to start mining at Phulbari in 2007. The DFS will further define thedeposit, which has potential reserves in excess of 400 million tonnes of HighVolatile, Low Sulphur bituminous coal. Asia Energy has agreements in place with the government of Bangladesh for thedevelopment and exploitation of the mine which is located 30 metres above sealevel, a distance from the country's flood-prone deltas. The company iscommitted to developing the mine in an environmentally and socially responsiblemanner in accordance with the highest international standards, and to this aimis conducting an Environmental Impact Assessment and Social Impact Assessment. The Phulbari mine will export coal to neighbouring India and to Asia's majorseaborne markets, and in addition to tax and royalty revenues will also providea vital new long-term source of sustainable energy to Bangladesh. As part of thedevelopment project, Asia Energy will also conduct a separate feasibility studyfor a mine-mouth power station. ENQUIRIES: Michael Frayne, Joint Managing Director Justine Howarth, Cathy Malins michael.frayne@asia-energy.com Parkgreen CommunicationsDavid Lenigas, Joint Managing Director Tel: +44 (0) 20 7493 3713 david.lenigas@asia-energy.com Justine.howarth@parkgreenmedia.comAsia Energy PLC cathy.malins@parkgreenmedia.comTel: +44 (0) 20 7409 0890, Fax: +44 (0) 20 7409 2750info@asia-energy.com; www.asia-energy.com Laith Reynolds, Executive Director (CEO- Bangladesh)Bangladesh: +8801733011445 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th May 20082:11 pmRNSEPT Disclosure
19th May 20082:36 pmRNSRule 2.10 Announcement
19th May 20089:44 amRNSPreliminary Approach to GCM R
19th May 20087:00 amRNSStatement re Possible Offer
7th May 200812:06 pmRNSStmt re Exploration Licence
25th Apr 20081:08 pmRNSHolding(s) in Company
10th Apr 20087:00 amRNSNiger Expansion
8th Apr 20088:41 amRNSComment on Press Speculation
27th Mar 20084:28 pmRNSHolding(s) in Company
27th Mar 20084:23 pmRNSHolding(s) in Company
11th Mar 200812:08 pmRNSDirectorate Change
6th Mar 200810:36 amRNSInterim Results
26th Feb 20083:52 pmRNSHolding(s) in Company
15th Feb 20083:30 pmRNSAcquisition
15th Feb 20081:33 pmRNSHolding(s) in Company
15th Feb 20081:27 pmRNSHolding(s) in Company
15th Feb 200810:58 amRNSHolding(s) in Company
14th Feb 20081:12 pmRNSHolding(s) in Company
1st Feb 20085:17 pmRNSAcquisition
28th Jan 20084:40 pmRNSSecond Price Monitoring Extn
28th Jan 20084:35 pmRNSPrice Monitoring Extension
25th Jan 20084:40 pmRNSSecond Price Monitoring Extn
25th Jan 20084:35 pmRNSPrice Monitoring Extension
23rd Jan 20084:40 pmRNSSecond Price Monitoring Extn
23rd Jan 20084:35 pmRNSPrice Monitoring Extension
3rd Jan 200810:07 amRNSHolding(s) in Company
13th Dec 20073:59 pmRNSHolding(s) in Company
12th Dec 20074:12 pmRNSChange of Name
11th Dec 20074:27 pmRNSResult of AGM
4th Dec 20075:00 pmRNSHolding(s) in Company
20th Nov 20077:02 amRNSHolding(s) in Company
16th Nov 20079:37 amRNSAnnual Report &Accounts-Amend
16th Nov 20077:00 amRNSAnnual Report and Accounts
19th Oct 20073:57 pmRNSDirector's Dealing
17th Oct 20072:55 pmRNSDirector's Dealing
10th Oct 20077:01 amRNSPreliminary Results
17th Sep 20075:06 pmRNSHolding(s) in Company
11th Sep 20074:59 pmRNSHolding(s) in Company
3rd Sep 20074:22 pmRNSHolding(s) in Company
29th Aug 200711:51 amRNSHolding(s) in Company
22nd Aug 20079:36 amRNSHolding(s) in Company
17th Aug 20073:25 pmRNSAIM Rule 26
25th Jul 20073:48 pmRNSPress Release
29th Jun 20077:00 amRNSTotal Voting Rights
22nd Jun 20073:57 pmRNSDirector/PDMR Shareholding
8th Jun 20073:44 pmRNSInvestment in GVM Metals
16th May 20073:05 pmRNSPress Release
30th Apr 20074:53 pmRNSTotal Voting Rights
26th Apr 20073:35 pmRNSHolding(s) in Company (amend)
23rd Apr 20074:05 pmRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.