Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGCM Resources Regulatory News (GCM)

Share Price Information for GCM Resources (GCM)

Share Price is delayed by 15 minutes
Get Live Data
3.90    -0.10 (-2.50%)
Bid:
3.80
Ask:
4.00
Spread: 0.20 (5.263%)
Market Cap: £14.62m
GCM Live PriceLast checked at - London Stock Exchange

Intraday GCM Resources Share Chart

Coal Quality Update

12 Jan 2005 10:53

Asia Energy PLC12 January 2005 Asia Energy PLC Tests of Coal Quality at Asia Energy's Phulbari Deposit Indicate Presence of High Quality Export Coal Products 12th January 2005 Asia Energy PLC ("Asia Energy" or "the Company") announces today that coresample analysis from recent drilling at its Phulbari Coal Project ("the Project") in north-west Bangladesh confirms expectations of a bituminous coal with HighVolatiles, Low Ash, and good calorific value. Laboratory testing workindicates that some of Phulbari's coal production may be suitable for sale tothe metallurgical export markets either as a Semi-Soft Coking Coal or as aPulverised Coal Injection ("PCI") coal. Float-sink testing conducted at the ACIRL laboratories in Brisbane, Australia,and review by QCC Resources Pty Ltd ("QCC") indicate that a range of coalproducts suitable for both the export and domestic markets may be extracted fromthe coal by upgrading from a simple crushing and sizing installation to astate-of-the-art Coal Processing Plant, utilising proven dense medium separationtechnology. This will allow the extraction of economic quantities of Semi-SoftCoking Coal (CSN 3 to 4) and/or PCI grade coal (ash 8% air dried), both of whichare used in steel making processes, as well as export quality thermal coal (6800kcal/kg air dried basis). Detailed properties of all potential products are being determined to evaluatethe optimum target markets and project economics. On this basis, additional coresampling of larger diameter drill holes (200 mm) will be necessary to determinethe process equipment requirements, potential product mix and comprehensive coalquality specifications for the planned coal production. Extraction of premium coal products from Phulbari has implications for the CoalHandling and Process Plant designs being built into the on-going DefinitiveFeasibility Study ("DFS"). The engineering studies of Run-of-Mine coal handling,process plant requirements, and product handling at the Project's planned mineand port are being expanded accordingly. The coal processing and engineeringwork is being undertaken in concert by GHD Pty Ltd and QCC, Asia Energy'sconsultants in these fields. Similarly, changes are required to the DFS marketing study to take account ofthe potential to mine these higher value products. AME Mineral Economics, basedin Sydney, Australia, were recently appointed to provide an analysis of existingand future markets for coal products from the Project. "The presence of these premium coal products within the Phulbari coal measuresshould significantly broaden the potential markets for the Company's future coalproduction and enhance the project economics", commented Asia Energy's JointManaging Director Mr David Lenigas. ABOUT ASIA ENERGY PLC Asia Energy PLC is a London-based AIM quoted company whose primary activity isthe development of an open cast coal mine at Phulbari in north-west Bangladeshwhich has been projected to produce 15 million tonnes of high quality coal peryear. The Company is currently carrying out an intensive drilling programme onthe basin as part of the DFS that is due for completion in 2005 with theobjective to start mining at Phulbari in 2007. The DFS will further define thedeposit, which has potential reserves in excess of 400 million tonnes of HighVolatile, Low Sulphur bituminous coal. Asia Energy has agreements in place with the government of Bangladesh for thedevelopment and exploitation of the mine which is located 30 metres above sealevel, a distance from the country's flood-prone deltas. The company iscommitted to developing the mine in an environmentally and socially responsiblemanner in accordance with the highest international standards, and to this aimis conducting an Environmental Impact Assessment and Social Impact Assessment. The Phulbari mine will export coal to neighbouring India and to Asia's majorseaborne markets, and in addition to tax and royalty revenues will also providea vital new long-term source of sustainable energy to Bangladesh. As part of thedevelopment project, Asia Energy will also conduct a separate feasibility studyfor a mine-mouth power station. ENQUIRIES: Michael Frayne, Joint Managing Director Justine Howarth, Cathy Malins michael.frayne@asia-energy.com Parkgreen CommunicationsDavid Lenigas, Joint Managing Director Tel: +44 (0) 20 7493 3713 david.lenigas@asia-energy.com Justine.howarth@parkgreenmedia.comAsia Energy PLC cathy.malins@parkgreenmedia.comTel: +44 (0) 20 7409 0890, Fax: +44 (0) 20 7409 2750info@asia-energy.com; www.asia-energy.com Laith Reynolds, Executive Director (CEO- Bangladesh)Bangladesh: +8801733011445 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Oct 20084:51 pmRNSSecond Price Monitoring Extn
31st Oct 20084:40 pmRNSPrice Monitoring Extension
22nd Oct 20084:42 pmRNSSecond Price Monitoring Extn
22nd Oct 20084:35 pmRNSPrice Monitoring Extension
17th Oct 20087:00 amRNSRule 8.3- GCM resources PLC
17th Oct 20087:00 amRNSRule 8.3- GCM resources PLC
17th Oct 20087:00 amRNSRule 8.3- GCM resources PLC
10th Oct 20084:47 pmRNSSecond Price Monitoring Extn
10th Oct 20084:42 pmRNSPrice Monitoring Extension
10th Oct 200812:50 pmRNSHolding(s) in Company
10th Oct 20089:47 amRNSPurchase of Shares
2nd Oct 20089:39 amRNSHolding(s) in Company
1st Oct 20082:06 pmRNSHolding(s) in Company
30th Sep 200810:07 amRNSHolding(s) in Company
25th Sep 20084:02 pmRNSRule 8.3- GCM Resources
24th Sep 20084:29 pmRNSRule 8.3- GCM Resources PLC
24th Sep 20084:28 pmRNSRule 8.3- GCM resources PLC
24th Sep 20082:35 pmRNSHolding(s) in Company
23rd Sep 20089:01 amRNSHolding(s) in Company
22nd Sep 20084:52 pmRNSHolding(s) in Company
22nd Sep 20084:44 pmRNSHolding(s) in Company
22nd Sep 20084:36 pmRNSPrice Monitoring Extension
22nd Sep 20083:19 pmRNSRule 8.3- GCM Resources PLC
19th Sep 20085:31 pmRNSRule 8.3- GCM Resources PLC
18th Sep 20087:00 amRNSPreliminary Results
16th Sep 20084:41 pmRNSSecond Price Monitoring Extn
16th Sep 20084:35 pmRNSPrice Monitoring Extension
3rd Sep 20088:02 amRNSHolding(s) in Company
4th Aug 200812:25 pmRNSHolding(s) in Company
8th Jul 20089:27 amRNSHolding(s) in Company
4th Jul 20089:27 amRNSHolding(s) in Company
4th Jul 20089:25 amRNSHolding(s) in Company
30th Jun 20084:35 pmRNSHolding(s) in Company
27th Jun 20082:39 pmRNSTotal Voting Rights
27th Jun 20082:35 pmRNSHolding(s) in Company
26th Jun 200812:18 pmRNSHolding(s) in Company
25th Jun 20084:01 pmRNSIssue of Equity
25th Jun 20083:58 pmRNSHolding(s) in Company
24th Jun 20082:33 pmRNSRule 8.3- GCM Resources PLC
23rd Jun 20089:13 amRNSHolding(s) in Company
20th Jun 200811:45 amRNSHolding(s) in Company
20th Jun 20089:01 amRNSStmnt re Share Price Movement
20th Jun 20088:59 amRNSHolding(s) in Company
19th Jun 200811:14 amRNSIssue of Equity
19th Jun 200811:10 amRNSHolding(s) in Company
17th Jun 20083:29 pmRNSHolding(s) in Company
16th Jun 20084:24 pmRNSHolding(s) in Company
16th Jun 200812:07 pmRNSRule 8.3- GCM Resources
16th Jun 20087:00 amRNSRule 8.3- GCM Resources PLC
13th Jun 20084:34 pmRNSRule 8.3- GCM Resources

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.