Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFerro-alloy Resources Limited Regulatory News (FAR)

Share Price Information for Ferro-alloy Resources Limited (FAR)

Share Price is delayed by 15 minutes
Get Live Data
4.95    -0.05 (-1.00%)
Bid:
4.80
Ask:
5.10
Spread: 0.30 (6.25%)
Market Cap: £29.09m
FAR Live PriceLast checked at - London Stock Exchange

Intraday Ferro-alloy Resources Limited Share Chart

Operations Update

18 Apr 2019 07:00

RNS Number : 5462W
Ferro-Alloy Resources Limited
18 April 2019
 

 

Ferro-Alloy Resources Limited / Index: LSE / Epic: FAR / Sector: Natural Resources

 

18 April 2019

Ferro-Alloy Resources Limited

("Ferro-Alloy" or "the Company")

 

Operations Update

 

Ferro-Alloy Resources Limited, the vanadium mining and processing company with operations based in Southern Kazakhstan, is pleased to announce an operations update ahead of the publication of its final results for the year ended 31 December 2018.

 

Ferro-Alloy was admitted to trading on the Main Market of the London Stock exchange in March 2019 and raised £5.2 million on admission ("Admission"). As indicated at the time of Admission, part of this funding is to be utilised to expand production at the existing vanadium concentrate processing operation (the "Existing Operation"), where the target is to expand production to around 1,500 tonnes per annum, as well as conduct preliminary work on the main project to produce 22,500 tonnes per year from the Balasausqandiq mine ("the Mine").

 

Work on the expansion has gained momentum, financed both by operating earnings and the raising of funds on Admission, and the Company is pleased to confirm that there have been a number of developments at the Existing Operation including;

 

· various items of equipment have started to arrive on site, including a rotating pre-roasting oven, six new 16 cubic metre leach tanks for the acid leaching of the low-grade wastes, and a further receiving tank for roasted material from the main roaster has been installed;

· the engineering design work for the connection to the adjacent high voltage power line has been completed and contracts are being finalised which will provide the greater power required by the expanded plant at a lower cost, and will eliminate power outages and instability;

· the detailed design of a 990 square metre extension of the plant building and electrometallurgical and recrystallisation equipment have been completed, procurement contracts for the steel and panels have been let, and work on the foundations has already commenced;

· a 25-tonne mobile crane, an additional loader, and three site transport vehicles have been acquired

· accommodation for an additional 24 site construction workers has been installed and work has started on an additional floor of accommodation for company workers

 

 

The Company's final results for the year ended 31 December 2018 will be announced on 30 April 2019.

 

Nick Bridgen, CEO, commented: "Following our listing on the London Stock Exchange, I have been impressed by the commitment of our on-site team and the efficiency with which we have been able to design, acquire and install equipment. The potential of Balasausqandiq vanadium deposit, with a reserve of over 70 million tonnes estimated on a locally required basis, cannot be understated with its unique geology, industry leading low costs and capex, and its significant scale".

 

 

For further information, visit www.ferro-alloy.com or contact:

 

Ferro-Alloy Resources Limited

Nick Bridgen (CEO)

info@ferro-alloy.com

 

Shard Capital Partners LLP

(Corporate Adviser & Broker)

Dr Wang Chong

+44 207 186 9948

 

St Brides Partners Limited

(Financial PR & IR Adviser)

Catherine Leftley/Gaby Jenner

+44 207 236 1177

 

 

 

Further information about Ferro-Alloy Resources Limited

 

The Company's operations are all located at the Balasausqandiq Deposit in Kyzylordinskaya Oblast in the South of Kazakhstan. Currently the Company has two main business activities:

 

(a) the high grade Balasausqandiq Vanadium Project (the "Project"); and

(b) an existing profitable vanadium concentrate processing operation (the "Existing Operation")

 

Balasausqandiq is a very large deposit, situated in Kyzylordinskaya Oblast in Southern Kazakhstan. The ore contains vanadium as the principal product, together with by-products of carbon, molybdenum, uranium, rare earth metals, potassium, and aluminium.

 

A reserve on the JORC 2012 basis has been estimated only the first ore-body number which amounts to 23 million tonnes, not including the small amounts of near-surface oxidised material which is in the Inferred resource category. The Reserves are estimated to be over 70m tonnes in ore-bodies 1 to 5 but this does not include the full depth of ore-bodies 2-5.

 

There is an additional existing concentrate processing operation is situated at the site of the Balasausqandiq Deposit. The production facilities were originally created from a 15,000 tonnes per year pilot plant which was then adapted to treat low-grade concentrates and is now in the process of being expanded and further adapted to treat a wider variety of raw-materials.

 

The Company has already completed the first steps of a development plan which is expected to result in annualised production capacity increasing gradually to around 1,500 tonnes of contained vanadium pentoxide. The development plan includes upgrades to infrastructure, an extension to the existing factory and the installation of equipment to increase the throughput and to add the facilities to convert ammonium metavanadate (AMV) into vanadium pentoxide.

 

The strategy of the Company is to develop both the Existing Operation and the Project in parallel. Although they are located on the same site and use some of the same infrastructure, they are separate operations.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLLFEESRIDLIA
Date   Source Headline
6th May 20267:00 amRNSNon-Executive Director Share Sale
1st May 20267:00 amRNSGrant of Share Options
30th Apr 20267:00 amRNS2025 Final Results
1st Apr 20267:00 amRNSTotal Voting Rights & Admission of Shares
10th Mar 20267:00 amRNSIssue of Equity
19th Jan 20267:00 amRNSCarbon Black Substitute MOU
5th Dec 20257:00 amRNSIssue of Equity
14th Nov 20254:55 pmRNSResult of 2025 AGM
5th Nov 20257:00 amRNSIssue of Equity
4th Nov 20257:17 amRNSProject Finance Expression of Interest
13th Oct 20257:00 amRNSPositive Feasibility Study Results
9th Oct 20257:00 amRNSNotice of AGM
30th Sep 20257:00 amRNSInterim Results and feasibility study update
7th Jul 20257:00 amRNSIssue of Equity
27th Jun 20257:00 amRNSCBS Product Update and Feasibility Study Update
23rd Jun 20257:00 amRNSAppointment of Lead Financial Adviser
2nd Jun 20257:00 amRNSFramework Agreement for Phase 1 of Balasausqandiq
2nd May 20257:00 amRNSGrant of Share Options
30th Apr 20257:00 amRNS2024 Final Results
6th Mar 20257:00 amRNSIssue of Equity to Supplier
19th Dec 202412:10 pmRNSIssue of Equity to Directors & Share Subscription
17th Dec 20247:00 amRNSNon-Binding Offtake Term Sheet for Balasausqandiq
2nd Dec 20247:00 amRNSStrategic Focus on Carbon Black Substitute
29th Nov 20247:00 amRNSKazakhstan Exempt Offer Bond Programme Update
21st Nov 20247:00 amRNSCommercial Potential of Carbon Black Substitute
24th Oct 20247:00 amRNSQ3 2024 Production Results
23rd Oct 20244:52 pmRNSResult of 2024 AGM
26th Sep 20247:00 amRNSInterim Results
19th Sep 20247:00 amRNSNotice of AGM
18th Jul 20247:00 amRNSQ2 2024 Production Results
29th Apr 20247:00 amRNSFinal Results
26th Apr 20247:00 amRNSQ1 2024 Production Results
15th Feb 20241:00 pmRNSSale of 3rd Tranche of Exempt Offer Bond Programme
1st Feb 20247:00 amRNSFeasibility Study Update & Bond Programme
12th Jan 20247:00 amRNSQ4 2023 Production Results
22nd Dec 20237:00 amRNSTrading Update
30th Nov 20237:00 amRNSTotal Voting Rights
22nd Nov 20237:00 amRNSHolding(s) in Company
21st Nov 202312:17 pmRNSDirector/PDMR Shareholding
14th Nov 20237:00 amRNSIssue of Equity
1st Nov 20235:08 pmRNSResult of AGM
17th Oct 20237:00 amRNSExempt Offer Bond Programme - Second Tranche Sale
10th Oct 202312:53 pmRNSExisting Operation Q3 Production Results
6th Oct 20237:00 amRNSNotice of AGM
19th Sep 20237:00 amRNSExempt Offer Bond Programme - Second Tranche
12th Sep 20237:00 amRNSInvestor Presentation
12th Sep 20237:00 amRNSGrant of Share Options
11th Sep 20237:00 amRNSHalf-year Report
21st Aug 20237:00 amRNSTrading Update
27th Jul 20239:00 amRNSLaunch of Bond Programme /Listing of First Tranche

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.