Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

18 Jul 2013 07:00

RNS Number : 5995J
Exillon Energy Plc
18 July 2013
 



Exillon Energy plc

Drilling Update

18 July 2013

Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), today issues a drilling update.

Production Expectations

We intend to give an update on our production expectations for 2013 along with our H1 reviewed financial results. These are expected to be released in late August.

 

Exillon WS

EWS I - 91

Well EWS I - 91 was drilled on the central part of the north-west extension of the EWS I field. The well was spudded on the 18th May 2013 and drilled and cemented in 20 days. The well encountered the Jurassic P reservoir at 1,856 meters, confirming 4.3 meters of effective vertical net oil pay and 7.2 meters of net pay along the well bore.

The well is currently operating with a submersible pump flowing oil at 377 bbl/day. The well was drilled 1.2 km to the north-west of Pad 9, and is now connected to our existing production facilities.

EWS I - 72

Well EWS I - 72 was drilled on the margin of the northern extension of the East EWS I field. The well was designed to test the productivity of the margin of the field which represents a transitional zone between collector quality sands and non-collector.

The well was spudded on the 8th June 2013 and drilled and cemented in 18 days. The well encountered the Jurassic P reservoir at 1,876 meters, confirming 4.3 meters of effective vertical net oil pay.

The well is currently operating with a submersible pump flowing oil at 94 bbl/day. The well was drilled 0.6 km to the north of Pad 7.

 

Exillon TP

Appraisal well North ETP VI - 3

Appraisal well North ETP VI - 3 was designed to test northern extension of the North ETP VI field.

The well was spudded on 27 March 2013 and drilled and cemented in 84 days. The well encountered Lower Silurian reservoir at 3,175 metres, confirming 12.2 metres of absolute effective net oil pay.

The well is currently being tested with natural oil rates to surface ranging from 488 bbl/day on an 18 mm choke to 92 bbl/day on a 6 mm choke. The well was drilled vertically from Pad 3, and is now connected to existing production facilities.

Exploration well ETP VI - 2

Exploration well ETP VI - 2 was drilled on the southern tip of the ETP VI structure. The well was spudded on 29 April 2013 and drilled and cemented in 70 days.

45.5 meters of core were collected, which is represented by low permeability carbonates with no signs of hydrocarbon saturation. During a test the well did not produce oil.

We will re-assess the geological model of the area and intend to conduct a fracture survey. Two additional wells have been previously planned for drilling in this part of the field in 2013. No further drilling will be completed in this area of the field prior to the completion of the fracture survey.

Well ETP IV - 5002

Well ETP IV - 5002 was spudded on 12 February 2013 and drilled and cemented in 64 days on the northern part of the ETP IV field. The well encountered Lower Silurian reservoir at 3,272 metres, confirming 15.6 metres of absolute effective net oil pay. In addition, the well encountered Domanic reservoir at 3,245 metres, confirming 5.7 metres of absolute effective net oil. Due to the angled trajectory of the well bore, this well exposed 25.4 metres of effective net oil pay.

The well is currently operating with a submersible pump flowing oil at 8 bbl/day. To increase the flow rate from this well we will consider conducting an acid hydrofrack in the upcoming winter season.

The well was drilled 0.9 km to the north-west of Pad 5, and is now connected to existing production facilities. Well ETP IV - 5002 is the last planned well from Pad 5.

 

Media contacts:

 

Tom Blackwell

Telephone: +44 7834 310 945 / +7 919 102 9064

Email: blackwell@mcomgroup.com

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFUSIAFDSEIW
Date   Source Headline
9th Dec 201310:40 amRNSForm 8.5 (EPT/RI)
6th Dec 20133:21 pmRNSForm 8.3 - Exillon Energy Plc
6th Dec 20133:11 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
6th Dec 20132:29 pmRNSForm 8.3 - [Exillon Energy plc]
6th Dec 201312:38 pmRNSForm 8 (OPD) (Exillon Energy plc)
6th Dec 201312:29 pmRNSForm 8.3 - [Exillon Energy Plc]
6th Dec 201311:43 amRNSForm 8.5 (EPT/RI)
6th Dec 20137:00 amRNSExtension to EWS I field
6th Dec 20137:00 amRNSForm 8.3 - Exillon Energy Plc
5th Dec 20132:11 pmRNSTermination of Formal Sale Process
5th Dec 201312:58 pmRNSForm 8.3 - [Exillon Energy plc]
5th Dec 201311:27 amRNSForm 8.5 (EPT/RI)
5th Dec 201310:11 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
4th Dec 20136:26 pmRNSForm 8.3 - Exillon Energy Plc
4th Dec 20136:21 pmRNSForm 8.3 - Exillon Energy Plc
4th Dec 20136:04 pmRNSUpdate on Formal Sale Process
4th Dec 20134:28 pmRNSStatement re Possible Offer
4th Dec 20134:25 pmRNSForm 8.3 -Exillon Energy plc
4th Dec 20133:21 pmRNSForm 8.3 - Dealing Disclosure - Exillon Energy Plc
4th Dec 201311:53 amRNSForm 8.3 - [Exillon Energy plc]
4th Dec 201310:49 amRNSForm 8.5 (EPT/RI)
4th Dec 201310:35 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
3rd Dec 20131:49 pmRNSStatement re Possible Offer - Exillon Energy Plc
3rd Dec 201312:48 pmRNSForm 8.3 - [Exillon Energy]
3rd Dec 201311:32 amRNSForm 8.5 (EPT/RI)
2nd Dec 20133:44 pmRNSForm 8.3 - [Exillon Energy Plc]
2nd Dec 20137:00 amRNSExillon Energy plc November 2013 Production Update
2nd Dec 20137:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
29th Nov 20133:46 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
29th Nov 20133:30 pmRNSForm 8.3 - Exillon Energy Plc
29th Nov 201310:38 amRNSForm 8.3 - Exillon Energy Plc
28th Nov 20136:16 pmRNSHolding(s) in Company
28th Nov 20133:50 pmRNSForm 8.3 - Exillon Energy Plc
28th Nov 201312:44 pmRNSForm 8.3 - [Exillon Energy]
28th Nov 201311:46 amRNSForm 8.3 - Exillon Energy Plc
28th Nov 201310:17 amRNSForm 8.5 (EPT/RI)
27th Nov 20132:19 pmRNSForm 8.3 - [Exillon Energy]
27th Nov 201310:43 amRNSForm 8.5 (EPT/RI)
26th Nov 20133:37 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
26th Nov 20133:36 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
26th Nov 20133:23 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
26th Nov 201312:22 pmRNSForm 8.3 - Exillon Energy Plc
26th Nov 201312:19 pmRNSForm 8.3 - Exillon Energy Plc
26th Nov 201311:55 amRNSForm 8.3 - [Exillon Energy]
26th Nov 201310:53 amRNSForm 8.5 (EPT/RI)
25th Nov 20135:44 pmRNSHolding(s) in Company
25th Nov 20135:42 pmRNSHolding(s) in Company
25th Nov 20131:53 pmRNSForm 8.3 - Exillon Energy Plc
25th Nov 201312:13 pmRNSForm 8.3 - Exillon Energy Plc
25th Nov 201312:13 pmRNSForm 8.3 - [Exillon Energy]

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.