The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update and Notice of Results

23 Aug 2012 07:35

RNS Number : 6281K
Exillon Energy Plc
23 August 2012
 



Exillon Energy plc

Drilling Update and Notice of Results

23 August 2012

23 August 2012 - Exillon Energy plc (EXI.LN), a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

 Drilling Update

Well East EWS I - 53 was spudded on 19th July 2012 and drilled and cemented in 24 days on the northern part of the East EWS I field. The well encountered the Jurassic P reservoir at 1,875 metres, confirming 20.3 metres of effective vertical net pay. Due to the angled trajectory of the well bore, this exposed 38.4 metres of effective net oil pay for production.

The well was perforated in two stages. The lower zone of P formation was perforated first and flowed water-free oil naturally to the surface with a test flow rate of 503 bbl/day on an 8 mm choke. Thereafter, the remaining Jurassic P formation was perforated. The combined well flowed water-free oil naturally to the surface with a test flow rate of 828 bbl/day on a 8mm choke.

The oil water contact in this area of the field had originally been assumed to be at 1,872 metres sub-sea. The new well has not encountered an oil water transition zone and has confirmed the presence of oil at least 32 metres below the originally assumed oil water contact.

Well 53 is the fourth development well drilled from Pad 5 following the success of Exploration Well 50 in 2011. All five wells have shown consistent results. They have thicker than expected net pays, confirmed a highly permeable reservoir and none has discovered an oil water contact, proving a wider and thicker area of high quality reservoir across the northern extension of East EWS I. All five wells are currently flowing naturally, without pumps.

The well was drilled 1.1km south east of Pad 5, and is now connected to our existing production facilities. A fifth development well from Pad 5, Well 571, is currently being drilled.

Financial Results for 6 months 2012

We expect to announce our unaudited financial results for the first 6 months of 2012 on 31st August.

 

Media details:

 

Chris McMahon +44 207 920 2330

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQXLBLLVFLBBD
Date   Source Headline
28th Aug 20139:37 amRNSForm 8.3 - Exillon Energy Plc
27th Aug 201311:01 amRNSExtension to deadline of Possible Offer
27th Aug 20137:11 amRNSInterim Results for 6M 2013
23rd Aug 20135:19 pmRNSForm 8.3 - Exillon Energy Plc
22nd Aug 201310:01 amRNSForm 8.3 - Exillon Energy Plc.
19th Aug 20133:21 pmRNSForm 8.3 - Exillon Energy Plc
16th Aug 20131:02 pmRNSForm 8.3 - Exillon Energy Plc
13th Aug 20137:00 amRNSEmployee Benefit Trust Opening Position Disclosure
13th Aug 20137:00 amRNSCompany Opening Position Disclosure
12th Aug 20134:08 pmBUSForm 8.3 - Exillon
12th Aug 201311:27 amRNSForm 8.3 - Exillon Energy Plc
12th Aug 20137:00 amRNSForm 8.3 - Exillon Energy Plc
9th Aug 20132:43 pmRNSForm 8.3 - EXILLON ENERGY PLC
9th Aug 20138:15 amRNSForm 8.3 - Exillon Energy plc
8th Aug 20133:29 pmRNSForm 8.3 - Exillon Energy Plc
8th Aug 20137:24 amRNSForm 8.3 - Exillon Energy Plc
1st Aug 20133:07 pmRNSForm 8.3 - Exillon Energy PLC
1st Aug 201311:22 amRNSForm 8.3 - Exillion Energy Plc
1st Aug 20139:45 amRNSForm 8.3 - Exillon Energy Plc
31st Jul 20133:20 pmRNSForm 8.3 - Exillon Energy Plc
31st Jul 20131:52 pmRNSForm 8.3 - [Exillon Energy Plc]
31st Jul 20131:25 pmRNSForm 8.3 - Exillon Energy Plc
31st Jul 201312:35 pmRNSForm 8.3 - Exillon Energy
31st Jul 201311:55 amRNSForm 8.3 - Exillon Energy plc
30th Jul 20132:51 pmRNSStatement re Poss Offer and Rule 2.10 Announcement
26th Jul 20137:00 amRNSTR-1: Notification of Major Interest in Shares
19th Jul 20135:32 pmRNSTR-1 Notification
18th Jul 20137:00 amRNSDrilling Update
8th Jul 20137:00 amRNSQuarterly Production Statement
26th Jun 20132:31 pmRNSAGM Results
13th Jun 20137:00 amRNSDrilling Update
4th Jun 20136:15 pmRNSTR-1: Notification of Major Interest in Shares
29th May 20137:00 amRNSAGM Notice
21st May 20137:00 amRNSHolding(s) in Company
23rd Apr 20137:00 amRNSInterim Management Statement
2nd Apr 20133:20 pmRNSReceipt of Ratings; Annual Report Publication
19th Mar 20132:29 pmRNSEGM Result
18th Mar 201312:43 pmRNSTR-1 Notification of major interest in shares
15th Mar 20137:00 amRNSReserve Update
13th Mar 201312:30 pmRNSRequisition Withdrawal
8th Mar 20137:00 amRNSPreliminary Unaudited Results for 2012
4th Mar 20133:00 pmRNSBOARD RESPONSE TO SHAREHOLDER REQUISITION
1st Mar 20137:00 amRNSDrilling Update
14th Feb 20137:00 amRNSPublication of circular
11th Feb 20137:00 amRNSTR:1 Notification of Major Interest In Shares
22nd Jan 20137:00 amRNSAppointment of Joint Broker
17th Jan 20137:00 amRNSTR-1: Notification of Major Interest in Shares
14th Jan 20135:51 pmRNSEGM Requisition
14th Jan 20137:00 amRNSReceipt of EGM Requisition
7th Jan 20137:00 amRNSDecember Production Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.