Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update and Notice of Results

23 Aug 2012 07:35

RNS Number : 6281K
Exillon Energy Plc
23 August 2012
 



Exillon Energy plc

Drilling Update and Notice of Results

23 August 2012

23 August 2012 - Exillon Energy plc (EXI.LN), a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

 Drilling Update

Well East EWS I - 53 was spudded on 19th July 2012 and drilled and cemented in 24 days on the northern part of the East EWS I field. The well encountered the Jurassic P reservoir at 1,875 metres, confirming 20.3 metres of effective vertical net pay. Due to the angled trajectory of the well bore, this exposed 38.4 metres of effective net oil pay for production.

The well was perforated in two stages. The lower zone of P formation was perforated first and flowed water-free oil naturally to the surface with a test flow rate of 503 bbl/day on an 8 mm choke. Thereafter, the remaining Jurassic P formation was perforated. The combined well flowed water-free oil naturally to the surface with a test flow rate of 828 bbl/day on a 8mm choke.

The oil water contact in this area of the field had originally been assumed to be at 1,872 metres sub-sea. The new well has not encountered an oil water transition zone and has confirmed the presence of oil at least 32 metres below the originally assumed oil water contact.

Well 53 is the fourth development well drilled from Pad 5 following the success of Exploration Well 50 in 2011. All five wells have shown consistent results. They have thicker than expected net pays, confirmed a highly permeable reservoir and none has discovered an oil water contact, proving a wider and thicker area of high quality reservoir across the northern extension of East EWS I. All five wells are currently flowing naturally, without pumps.

The well was drilled 1.1km south east of Pad 5, and is now connected to our existing production facilities. A fifth development well from Pad 5, Well 571, is currently being drilled.

Financial Results for 6 months 2012

We expect to announce our unaudited financial results for the first 6 months of 2012 on 31st August.

 

Media details:

 

Chris McMahon +44 207 920 2330

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQXLBLLVFLBBD
Date   Source Headline
10th Oct 201311:28 amRNSForm 8.5 (EPT/RI)
9th Oct 20131:39 pmRNSForm 8.3 - Exillon Energy PLC
9th Oct 201311:27 amRNSForm 8.5 (EPT/RI)
9th Oct 20137:00 amRNSInterim Management Statement and Drilling Update
8th Oct 20132:56 pmRNSForm 8.3 - Exillon Energy PLC
8th Oct 201312:30 pmRNSForm 8.3 - [Exillon Energy Plc]
8th Oct 201310:59 amRNSForm 8.5 (EPT/RI)
7th Oct 201312:24 pmRNSForm 8.3 - [Exillon Energy Plc]
7th Oct 201312:23 pmRNSForm 8.3 - Exillon Energy PLC
4th Oct 20134:31 pmRNSForm 8.3 - Exillon Energy PLC - REPLACEMENT
4th Oct 20131:05 pmRNSForm 8.3 - Exillon Energy PLC
4th Oct 201311:56 amRNSForm 8.5 (EPT/RI)
4th Oct 201311:02 amRNSForm 8.3 - [Exillon Energy Plc]
3rd Oct 201312:24 pmRNSForm 8.3 - [Exillon Energy Plc]
2nd Oct 20133:03 pmRNSForm 8.3 - [Exillon Energy Plc]
2nd Oct 20133:02 pmRNSForm 8.3 - [Exillon Energy Plc - Amendment]
2nd Oct 201311:47 amRNSForm 8.5 (EPT/RI)
1st Oct 20132:29 pmRNSForm 8.3 - [Exillon Energy plc]
1st Oct 201312:47 pmRNSForm 8.3 - Exillion Energy Plc
1st Oct 201311:36 amRNSForm 8.5 (EPT/RI)
30th Sep 201312:56 pmRNSForm 8.3 - [Exillon Energy Plc]
30th Sep 201312:01 pmRNSForm 8.3 - Exillion Energy Plc
30th Sep 201311:19 amRNSForm 8.5 (EPT/RI)
27th Sep 201311:28 amRNSForm 8.5 (EPT/RI)
27th Sep 20139:36 amRNSForm 8.3 - Exillon Energy Plc
26th Sep 20132:23 pmRNSForm 8.3 - Exillon Energy
26th Sep 201311:46 amRNSForm 8.3 - Exillon Energy Plc
25th Sep 20132:40 pmRNSForm 8.3 - Exillon Energy
24th Sep 201312:20 pmRNSForm 8.3 - Exillon Energy Plc
23rd Sep 20133:26 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
23rd Sep 20133:01 pmRNSForm 8.3 - Exillon Energy Plc
23rd Sep 201311:34 amRNSForm 8.3 - [Exillon Energy Plc]
23rd Sep 201311:25 amRNSForm 8.5 (EPT/RI)
20th Sep 201312:46 pmRNSForm 8.3 - Exillon Energy
20th Sep 201311:12 amRNSForm 8.5 (EPT/RI)
19th Sep 20135:30 pmRNSForm 8.5 (EPT/RI)
19th Sep 20133:02 pmRNSForm 8.3 - [offeree/offeror]-Exillon Energy Plc
19th Sep 20131:07 pmRNSForm 8.3 - Exillon Energy
19th Sep 20137:00 amRNSStatement regarding Exillon Energy
18th Sep 20133:04 pmRNSForm 8.3 - Exilion Energy Plc
18th Sep 201310:31 amRNSCommencement of Formal Sale Process
10th Sep 201312:40 pmRNSForm 8.3 -Exillon Energy Plc
6th Sep 20131:27 pmRNSForm 8.3 - Exillon Energy
6th Sep 20139:36 amRNSForm 8.3 - Exillon Energy Plc
5th Sep 20132:31 pmRNSForm 8.3 - EXILLON ENERGY PLC
4th Sep 20131:51 pmRNSForm 8.3 - EXILLON ENERGY PLC
4th Sep 201310:05 amRNSForm 8.3 - [Exillon Energy Plc]
30th Aug 20132:12 pmRNSForm 8.3 - EXILLON ENERGY PLC
30th Aug 20137:00 amRNSForm 8.3 - Exillon Energy Plc
29th Aug 20138:30 amRNSForm 8.3 - Exillon Energy Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.