Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.10
Bid: 1.00
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.20 (20.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.15
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Moonlight Iron Ore Drilling, South Africa

23 Feb 2011 07:00

RNS Number : 6633B
Ferrum Crescent Ltd
23 February 2011
 



23 February 2011

 

 

Ferrum Crescent Limited

("Ferrum Crescent", the "Company" or "the Group")(ASX: FCR, AIM: FCR)

 

Moonlight Iron Ore Drilling, South Africa

 

 

Highlights

·; Drilling programme follows review of project resources by AMEC Minproc ("AMEC"), Ferrum's Feasibility Study Manager

·; Programme of reverse circulation ("RC") and diamond core drilling commenced

o RC drilling of some 12 holes for 1500m to provide additional confidence in central deposit area

o 11 HQ diamond core holes (total 1000m) to provide mineralisation information, further verify historical drill data and check bulk density measurements

·; Core holes to provide bulk material for detailed phase of metallurgical testing

·; Metallurgical programme foundation for developing a process flow sheet for production of a concentrate of the quality required for DRI grade pellets

 

Ferrum Crescent today announces that a programme of reverse circulation ("RC") and diamond core drilling has commenced at the Moonlight Iron Ore Project. The drilling will provide additional geological understanding in important areas of the deposit and provide bulk sample for the first stage of an ongoing metallurgical testwork programme.

Moonlight contains a JORC compliant resource of 74Mt in the Indicated Resource category and 225Mt in the Inferred Resource category.

The drilling programme follows a review of the project resources by AMEC Minproc ("AMEC"), Ferrum's Feasibility Study Manager. AMEC believes the current resource model is adequate for preliminary planning purposes. However, additional sampling needs to be completed to ensure that adequate Measured and Indicated Resources are defined to support project financing.

The proposed RC drilling of some 12 holes for 1500m will largely provide additional confidence in areas of the central part of the deposit. A deeper hole in the south-west of the deposit is planned to test for repetition of mineralisation at depth in a zone dominated by shallow drilling.

Eleven HQ diamond core holes for a total 1000m will provide more detailed geological information on the mineralisation and further verify the use of historical drill data and checks on bulk density measurements. Importantly the core holes have been located to provide bulk material for a detailed phase of metallurgical testing that will commence at the conclusion of the drilling. The metallurgical programme is the first stage of an investigation aimed at developing a process flow sheet that will result in the production of a concentrate of the quality required for the production of DRI grade pellets.

The Company anticipates that an upgraded resource statement will be available for release in Q2 2011.

Commenting Ed Nealon, Executive Chairman of Ferrum Crescent said:

"The RC and diamond drilling programme commenced at Moonlight today will allow Ferrum Crescent to rapidly increase our understanding of the iron ore resource at the project. While a core objective of the programme is to increase the overall JORC compliant resource at Moonlight, of equal importance will be the results that go towards metallurgical test work. Defining a process flow sheet that allows Ferrum the ability to produce a pure, high quality, DRI pellet is key to unlocking significant value from Moonlight and we shall be able to begin this process on receipt of all the assayed drill results. We are confident that we will be able to achieve the tonnages of magnetite mineralisation published by South Africa's ISCOR in the 1990s and hence have a target* for Moonlight of 450 to 650 mt of magnetite."

* The term "target" should not be misunderstood or misconstrued as an estimate of Mineral Resources and Reserves as defined by the JORC Code (2004), and therefore the terms have not been used in this context. It is uncertain if further exploration or feasibility study will result in the determination of a Mineral Resource or Mining Reserve.

 

 

 

Competent Person's Statement:

The information in this report is based on information compiled by Lindsay Cahill, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Cahill has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Cahill is a consultant to the mining industry. This report is issued with Mr Cahill's consent as to the form and context in which the exploration results appear.

 

 

 

 

Australia and Company enquiries

UK and press enquiries

Ferrum Crescent Limited

Ed Nealon T: +61 419 905 546

Executive Chairman

Robert Hair -T: + 61 414 926 302

Company Secretary

Ocean Equities Limited (Broker)

Guy Wilkes T: +44 (0)20 7786 4370

Ambrian Partners Limited (Nominated Adviser)

Richard Swindells T: +44 (0) 20 7634 4856

Jen Boorer T: +44 (0) 20 7634 4859

For more information on the Company visit www.ferrumcrescent.com

Threadneedle Communications Limited

Laurence Read/Beth Harris T: +44(0)20 7653 9855

 

 

 

 

Further Information

The Group has a controlling interest (as defined under South African law) in a South African company that holds the prospecting right over two separate areas of iron-ore mineralisation in RSA; in particular the Moonlight magnetite deposit and part of the De Loskop prospect, which together form the Turquoise Moon Iron Project in the Limpopo Province of RSA ('the Project').

The Group owns approximately 81.5 per cent. of the Project, comprising a direct interest of 74 per cent. and a further indirect interest of approximately 7.5 per cent. through a minority shareholding in Ferrum's Black Economic Empowerment ("BEE") partner, Mkhombi Investments (Pty) Limited ("Mkhombi"). Mr Kofi Morna, who is a director of Mkhombi, is also a Director of the Company. A trust representing local Limpopo communities impacted by the Turquoise Moon Iron Project will hold equity in Mkhombi.

Since April 2008, the Group has been developing and defining the resource potential of the Project. The Moonlight magnetite deposit currently has a JORC compliant resource of 74Mt in the Indicated Resource category and 225Mt in the Inferred Resource category at a grade of 30 per cent. Fe, and the De Loskop prospect an exploration target* magnetite mineralisation of 200Mt to 1,000Mt which is non-JORC compliant at a grade of 30 - 40 per cent. Fe.

* The term "target" should not be misunderstood or misconstrued as an estimate of Mineral Resources and Reserves as defined by the JORC Code (2004), and therefore the terms have not been used in this context. It is uncertain if further exploration or feasibility study will result in the determination of a Mineral Resource or Mining Reserve.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCTTMATMBMTBBB
Date   Source Headline
28th Mar 20247:28 amRNSHalf-year Report
11th Dec 20237:00 amRNSConversion of Performance Rights
30th Nov 202311:30 amRNSResult of AGM
1st Nov 20237:00 amRNSFinal Results and Notice of AGM
23rd Oct 20237:00 amRNSToral Mining Licence Application process completed
9th Oct 20237:00 amRNSAppointment of Nominated Adviser and Broker
4th Aug 20237:00 amRNSDrilling Results and Mining Licence Update
25th Jul 20238:00 amRNSDrawdown of Final Tranche of CDTI Loan
19th May 20237:00 amRNSDrilling Results
5th Apr 202310:00 amRNSOperational Update
31st Mar 20237:00 amRNSHalf-year Report
22nd Mar 20232:00 pmRNSToral JV Update: Initial budget agreed w/Denarius
24th Jan 20231:00 pmRNSDirectors’ Dealings and Issue of Equity
30th Dec 202212:00 pmRNSResult of General Meeting
21st Dec 20227:00 amRNSPublication of Supplementary Explanatory Statement
7th Dec 202210:00 amRNSNotice of General Meeting
30th Nov 20225:30 pmRNSResults of Annual General Meeting
30th Nov 20227:00 amRNSUpdated Mineral Resource Estimate
23rd Nov 20227:00 amRNSAgreement signed with Denarius Metals Corp.
9th Nov 20227:00 amRNSHighest Grade Drilling Results by the Company
7th Nov 20227:00 amRNSNotice of Annual General Meeting
1st Nov 202210:35 amRNSFinal Results for the Year Ended 30 June 2022
5th Oct 202212:00 pmRNSProposed US$6m Farm-In Arrangement re Toral
5th Sep 20227:00 amRNSHigh Grade Drilling Results
8th Aug 20221:30 pmRNSDirectors’ Dealings and Issue of Equity
4th Aug 20227:00 amRNSFurther Metallurgical Results & Operational Update
3rd May 20227:00 amRNSOperational Update
30th Mar 20227:00 amRNSResults for the Half-Year Ended 31 December 2021
23rd Mar 20227:00 amRNSPositive Ore Sorting Results for the Toral Project
23rd Feb 20227:00 amRNSToral Project Update and Director's Disclosure
3rd Feb 20227:00 amRNSDirectorate Change
26th Jan 20227:00 amRNSCorporate & Operational Update
13th Dec 20217:00 amRNSSuccessful Completion of Hydrogeological Programme
30th Nov 20211:00 pmRNSResults of AGM and Issue of Equity
18th Nov 20217:00 amRNSCorporate Review & Operational Update
8th Nov 20217:00 amRNSTranche 2 of Innovation Grant Drawn Down
3rd Nov 20213:12 pmRNSHolding(s) in Company
3rd Nov 20213:10 pmRNSHolding(s) in Company
2nd Nov 20217:00 amRNSNotice of Annual General Meeting
29th Oct 20214:00 pmRNSFinal Results for the Year Ended 30 June 2021
26th Oct 20215:43 pmRNSResult of Fundraising
26th Oct 20217:00 amRNSFundraising and Appointment of Joint Broker
1st Oct 20217:00 amRNSUpdated Resource Estimate
7th Sep 20217:00 amRNSDrilling Results and Updated Resource Estimate
19th Jul 20217:00 amRNSMilestone 1 of CDTI Innovation Grant Completed
12th Jul 20213:06 pmRNSInvestor Webinar
22nd Jun 20217:00 amRNSWardell Armstrong Appointed as PFS Manager
7th Jun 20217:00 amRNSPFS Drilling Results - Toral Project, Spain
29th Apr 20217:00 amRNSDrilling Update Toral Zn, Pg & Ag Project, Spain
29th Mar 20217:30 amRNSResults for the Half-Year Ended 31 December 2020

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.