George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further Metallurgical Results & Operational Update

4 Aug 2022 07:00

RNS Number : 8339U
Europa Metals Ltd
04 August 2022
 

4 August 2022

Europa Metals Ltd

("Europa Metals", the "Company" or the "Group") (AIM, AltX: EUZ)

Further Highly Encouraging Metallurgical Results at Toral and Operational Update

Europa Metals, the European focused lead, zinc and silver developer, is pleased to announce highly encouraging results from its comprehensive metallurgical testwork programme and an update on its resource drilling campaign at its wholly owned Toral lead, zinc and silver project in the Castilla y León region, Spain ("Toral" or the "Toral Project").

Highlights:

· Metallurgical testwork results received from Wardell Armstrong International Ltd ("WAI") in respect of locked cycle flotation tests ("LCT") on products from an ore sorted bulk siliceous sample

Concentrate Grades 56.6% Zinc 69.6% Lead

Overall recovery (Sort & Float) 78.6% Zinc 80.7% Lead

· Metallurgical results received for LCT from WAI on a further two carbonate samples from:

Hole TOD-025D:

Concentrate Grades 57.4% Zinc 75.2% Lead

Overall recovery (Sort & Float) 81.4% Zinc 94.4% Lead

Hole TOD-028:

Concentrate Grades 60.3% Zinc 64.1% Lead

Overall recovery (Sort & Float) 84.0% Zinc 87.3% Lead

· Resource drilling ongoing

Following a delay to the start of the current campaign, progress has been impacted by drilling personnel contracting COVID-19

Hole TOD-041 has been completed with mineralisation being intersected at the planned target depth

Hole TOD-042 drilling is underway and currently at 280m with a target depth of approximately 900m

Rig is now operating on a double shift basis in order to seek to catch up with the original programme schedule

Commenting today, Myles Campion, Executive Chairman and acting CEO of Europa Metals, said:

"We have been busy so far this year on all fronts, including the recent completion of our metallurgical testwork campaign with WAI which achieved excellent results from both the upper siliceous zone and the lower carbonate zone.

"Lead and zinc recoveries to respective concentrates are very good. Ore sorting has played a part in lifting these recoveries (zinc to zinc concentrate by approximately 4 percentage points and lead to lead concentrate by approximately 3 percentage points, versus the previous results on unsorted ore) which is highly encouraging. The grades achieved for both Zinc and Lead are better than previous results, with the siliceous showing that the upper levels can also produce a high-grade concentrate.

"I am also pleased with our ongoing drill programme, albeit there is some catching up still to do, which will aim to prove up further indicated resources at depth."

 

Metallurgical Testwork: Ore Sorting followed by Froth Flotation of Ore Sort Concentrates

Samples from Ore Sorting undertaken by Tomra GmbH, were submitted to WAI earlier this year. The samples tested were a bulk sample of siliceous style mineralisation and two borehole composites of carbonate style mineralisation. The siliceous sample was a composite of intersections from boreholes TOD-029, TOD-029D, TOD-029D2, TOD-029D3, TOD-034 and TOD-034D (a total of 701.09 kg). The carbonate samples were taken from boreholes TOD-025D and TOD-028 (96.36 kg and 50.7 kg respectively).

The ore sorting results announced previously by the Company in March 2022 were as follows:

Siliceous bulk sample

· Recovery of 95.7% Pb and 94.3% Zn metal

· 43.7% mass rejection of waste

Carbonate composite from hole TOD-025D

· Recovery of 98.9% Pb and 94.7% Zn metal

· 46.8% mass rejection of waste

Carbonate composite from hole TOD-028

· Recovery of 96.6% Pb and 96.1% Zn metal

· 47.7% mass rejection of waste

The sorter products were the subject of the recently completed campaign of locked cycle flotation with the metallurgical results received from WAI comprising:

· Siliceous bulk sample

Flotation Recoveries 83.4% Zinc 84.3% Lead

Flotation Concentrate Grades 56.6% Zinc 69.6% Lead

Overall recovery (Sort & Float) 78.6% Zinc 80.7% Lead

· Carbonate sample from hole TOD-025D

Flotation Recovery 85.9% Zinc 95.4% Lead

Flotation Concentrate Grades 57.4% Zinc 75.2% Lead

Overall recovery (Sort & Float) 81.4% Zinc 94.4% Lead

· Carbonate sample from hole TOD-028

Flotation Recovery 87.4% Zinc 90.3% Lead

Flotation Concentrate Grades 60.3% Zinc 64.1% Lead

Overall recovery (Sort & Float) 84.0% Zinc 87.3% Lead

Comparison with the 2019 locked cycle flotation tests on carbonate drill core

Locked cycle flotation tests simulate a full-scale plant flowsheet. Each test at WAI's facilities was conducted in a series of six cycles using the flowsheet shown in Figure 1 below. For the second and subsequent cycles, lead and zinc cleaner tailings products were combined with the feed to the previous stage of flotation. For example, lead second cleaner tails were returned to first cleaner feed. The final concentrates, zinc scavenger tailings and zinc rougher tailings from the final two cycles, were weighed and sent for independent analysis. The results were then used to calculate recovery and concentrate grades.

Figure 1:Locked Cycle Test Flowsheet

 

http://www.rns-pdf.londonstockexchange.com/rns/8339U_1-2022-8-3.pdf

Results of the 2019 and 2022 testwork programmes are summarised in Table 1 below. These results indicate that Toral could clearly achieve excellent concentrate grades.

Table 1:Summarised Results of the 2019 and 2022 Testwork(Note: recovery and concentration data are from the original feed)

Test

Lead Concentrate

Zinc Concentrate

Lead Recovery(%)

CR

Conc(% Pb)

Zinc Recovery(%)

CR

Conc(% Zn)

2019 Carbonate LCT1 Float

84.3

39.4

57.5

70.7

29.8

55.8

2019 Carbonate LCT2 Float

83.7

34.9

60.0

77.0

24.9

59.1

2022Carbonate 025DSort + Float

94.4

18.8

75.2

81.4

42.3

57.4

2022Carbonate 028Sort + Float

87.3

51.4

64.1

84.0

24.0

60.3

2022 Silicate Sort + Float

80.7

59.7

69.6

78.6

52.9

56.6

 

Ore sorting and froth flotation are processes that concentrate and recover metal values. The concentration ratio ("CR") is defined as the weight of feed divided by the weight of concentrate. Performance of an individual test can be judged in terms of recovery and CR. For an operating plant, daily results for recovery and CR continually vary. However, the results generally form a trend when plotted on axes of recovery versus CR. The same type of plot can be useful in comparing locked cycle test results. 

Figure 2:Zinc Recovery vs Concentration Ratio Plot of LCT Results

 

http://www.rns-pdf.londonstockexchange.com/rns/8339U_1-2022-8-3.pdf

Overall results for zinc recovery (for 2022, sort & float and for 2019, just float) are shown in Figure 2. At any given CR, higher recovery indicates improved performance, and figure 2 illustrates that the combined sort plus float procedure has given better performance than flotation alone for the zinc concentrate.

In respect of the 2022 results, the best estimate of zinc recovery is the trendline shown in Figure 2, which is "a least squares fit" for the three different testwork data points. This line intersects the recovery axis at 89.7%.

This intercept incorporates for zinc metal losses during the sorting process of 3.9% and also a recovery loss during the flotation process of a further 6.4% of zinc to lead concentrate. 

The equation of the trend line is as follows:

Recovery % = 89.7 - (0.21 * CR)

In practice, when a full-scale plant and concentrator are in operation the aim is to produce a saleable zinc concentrate grade of approximately 55% to 60% Zn. To achieve this target concentrate grade, the required concentration ratio (and achievable recovery) depends mainly on the headgrade from the deposit. 

At Toral, the average resource grade (October 2021 Resource Estimate, @ 4% Zn equivalent cut off) is 3.9% zinc, such that a future potential processing plant could operate at a CR of 17 to zinc concentrate, which would achieve a zinc recovery of 86.1% and a concentrate grade of 57.1% zinc.

An approximate estimate of the zinc recovery improvement resulting from sorting can be made from Figure 2. Projecting the two points from the 2019 testwork back to a CR of 17 and then comparing with the best estimate of recovery trendline indicates a recovery improvement of approximately 4 percentage points.

Figure 3: Lead Recovery vs Concentration Ratio Plot of LCT Results

 

http://www.rns-pdf.londonstockexchange.com/rns/8339U_1-2022-8-3.pdf

Overall results for lead recovery (for 2022, sort & float and for 2019, just float) are shown in Figure 3, with the combined sort plus float procedure again giving better performance than flotation alone.

In respect of the 2022 results, the best estimate of lead recovery is the trendline shown in Figure 3, which is "a least squares fit" for the three testwork data points, intersecting the recovery axis at 97.4%. This intercept allows for the average loss of lead during sorting of 2.6% and the equation of the trend line is as follows:

 

Recovery % = 97.4 - (0.24 * CR)

In practice, a concentrator would seek to produce a saleable lead concentrate grade of approximately 70% lead. The average resource grade at Toral (October 2021 Resource Estimate) is 2.7% lead, such that a CR of 29 to lead concentrate would be required to achieve a lead recovery of 90.4% and a concentrate grade of 70.8% lead.

An approximate estimate of the lead recovery improvement resulting from sorting can be made from Figure 2. Projecting the two points from the 2019 testwork back to a CR of 29 and then comparing with the best estimate of recovery trendline indicates a recovery improvement of approximately 3 percentage points.

In summary, the Europa Metals' team believes that ore sorting followed by flotation has significant cost, performance and operational advantages compared with flotation alone. 

The Company will now consider how best to utilise ore sorter rejects and flotation tailings. These waste products will be valuable as potential cemented aggregate backfill and paste fill for underground mining operations. Some tailings products could also be used as landfill for reclamation of an existing quarry.

Analysis of Final Concentrates Produced in the 2022 Locked Cycle Testwork

Final zinc and lead concentrates from the 2022 testwork were sent for detailed chemical analyses. The analyses for commonly applied penalty elements are shown in Table 2 below. The concentrates were generally below penalty levels except for mercury. High mercury levels are common for Spanish zinc concentrates and local smelters are able to manage such feeds. As an alternative, a future plant at Toral could incorporate a concentrate treatment process in order to reduce the mercury to below penalty levels.

Table 2:Penalty Element Analyses of Concentrates Produced in the 2022 Testwork

Concentrate From Testwork

As (ppm)

Bi (ppm)

Cd (ppm)

Fe (%)

Mg (%)

Mn (ppm)

Hg (ppm)

F (ppm)

Siliceous Lead Conc

513

2.6

87

4.32

0.08

80

234

120

Siliceous Zinc Conc

104

0.2

1,325

2.72

0.06

120

2,970

40

Carbonate 025D Lead Conc

80

2.6

60.8

1.04

0.29

60

96

Carbonate 025D Zinc Conc

33

0.1

1,445

1.83

0.28

70

1,745

30

Carbonate 028 Lead Conc

212

7.9

177.5

5.6

0.17

60

197

30

Carbonate 028 Zinc Conc

16

0.1

1,635

1.75

0.08

50

1,085

20

Penalty Level for Zinc Conc

2,000

200

2,500

8%

0.18%

5,000

50

200

 

Resource Drilling

Following an initial delay to the arrival of the rig on site due to increased exploration activity and therefore rig demand in Spain, the first hole, TOD-041, has recently been completed. Hole TOD-041 intersected mineralisation at its target depth, whilst drilling of hole TOD-042 has commenced and is advancing well, as the rig contractor is operating on a double shift, and is currently at 280m with a target depth of approximately 900m.

The objective of this ongoing campaign is to seek to extend the indicated resource at depth towards the east of the current zone and link up a known area of encouraging data. If successful, this will add tonnes to the envisaged future mining plan. Additionally, all holes are being geotechnically evaluated as we drill, thereby providing additional information for the feasibility study process.

This drilling campaign will also complete our R&D collaboration project with the Centre for the Development of Industrial Technology (CDTI) which will conclude later this year.

Competent Person's statement

The information contained in this announcement that relates to exploration activities is based upon information compiled by Evan Kirby, Non-Executive Director of Europa Metals. Dr Kirby is a Fellow of the Southern African Institute for Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Dr Kirby consents to the inclusion in this announcement of the matters based upon the information in the form and context in which it appears.

 

 

For further information on the Company, please visit www.europametals.com or contact:

 

Europa Metals Ltd

Dan Smith, Non-Executive Director and Company Secretary (Australia)

T: +61 417 978 955

Myles Campion, Executive Chairman and acting CEO (UK)

T: +44 (0)20 3289 9923

 

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler

T: +44 (0)20 7409 3494

 

WH Ireland Limited (Broker)

Harry Ansell/Dan Bristowe/Katy Mitchell/Sarah Mather

T: +44 (0)20 7220 1666

Questco Corporate Advisory Proprietary Limited (JSE Sponsor)

Sharon OwensT: +27 (11) 011 9212

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018, as amended.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKZGGRKFGGZZM
Date   Source Headline
28th Mar 20247:28 amRNSHalf-year Report
11th Dec 20237:00 amRNSConversion of Performance Rights
30th Nov 202311:30 amRNSResult of AGM
1st Nov 20237:00 amRNSFinal Results and Notice of AGM
23rd Oct 20237:00 amRNSToral Mining Licence Application process completed
9th Oct 20237:00 amRNSAppointment of Nominated Adviser and Broker
4th Aug 20237:00 amRNSDrilling Results and Mining Licence Update
25th Jul 20238:00 amRNSDrawdown of Final Tranche of CDTI Loan
19th May 20237:00 amRNSDrilling Results
5th Apr 202310:00 amRNSOperational Update
31st Mar 20237:00 amRNSHalf-year Report
22nd Mar 20232:00 pmRNSToral JV Update: Initial budget agreed w/Denarius
24th Jan 20231:00 pmRNSDirectors’ Dealings and Issue of Equity
30th Dec 202212:00 pmRNSResult of General Meeting
21st Dec 20227:00 amRNSPublication of Supplementary Explanatory Statement
7th Dec 202210:00 amRNSNotice of General Meeting
30th Nov 20225:30 pmRNSResults of Annual General Meeting
30th Nov 20227:00 amRNSUpdated Mineral Resource Estimate
23rd Nov 20227:00 amRNSAgreement signed with Denarius Metals Corp.
9th Nov 20227:00 amRNSHighest Grade Drilling Results by the Company
7th Nov 20227:00 amRNSNotice of Annual General Meeting
1st Nov 202210:35 amRNSFinal Results for the Year Ended 30 June 2022
5th Oct 202212:00 pmRNSProposed US$6m Farm-In Arrangement re Toral
5th Sep 20227:00 amRNSHigh Grade Drilling Results
8th Aug 20221:30 pmRNSDirectors’ Dealings and Issue of Equity
4th Aug 20227:00 amRNSFurther Metallurgical Results & Operational Update
3rd May 20227:00 amRNSOperational Update
30th Mar 20227:00 amRNSResults for the Half-Year Ended 31 December 2021
23rd Mar 20227:00 amRNSPositive Ore Sorting Results for the Toral Project
23rd Feb 20227:00 amRNSToral Project Update and Director's Disclosure
3rd Feb 20227:00 amRNSDirectorate Change
26th Jan 20227:00 amRNSCorporate & Operational Update
13th Dec 20217:00 amRNSSuccessful Completion of Hydrogeological Programme
30th Nov 20211:00 pmRNSResults of AGM and Issue of Equity
18th Nov 20217:00 amRNSCorporate Review & Operational Update
8th Nov 20217:00 amRNSTranche 2 of Innovation Grant Drawn Down
3rd Nov 20213:12 pmRNSHolding(s) in Company
3rd Nov 20213:10 pmRNSHolding(s) in Company
2nd Nov 20217:00 amRNSNotice of Annual General Meeting
29th Oct 20214:00 pmRNSFinal Results for the Year Ended 30 June 2021
26th Oct 20215:43 pmRNSResult of Fundraising
26th Oct 20217:00 amRNSFundraising and Appointment of Joint Broker
1st Oct 20217:00 amRNSUpdated Resource Estimate
7th Sep 20217:00 amRNSDrilling Results and Updated Resource Estimate
19th Jul 20217:00 amRNSMilestone 1 of CDTI Innovation Grant Completed
12th Jul 20213:06 pmRNSInvestor Webinar
22nd Jun 20217:00 amRNSWardell Armstrong Appointed as PFS Manager
7th Jun 20217:00 amRNSPFS Drilling Results - Toral Project, Spain
29th Apr 20217:00 amRNSDrilling Update Toral Zn, Pg & Ag Project, Spain
29th Mar 20217:30 amRNSResults for the Half-Year Ended 31 December 2020

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.