Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

  • This share is currently suspended. It was suspended at a price of 1.025
  • There is currently no data for EUZ

Investor Webinar

12 Jul 2021 15:06

RNS Number : 9703E
Europa Metals Ltd
12 July 2021
 

12 July 2021

Europa Metals Ltd

("Europa Metals", the "Company" or the "Group") (AIM, AltX: EUZ)

Investor Webinar - Toral Pb, Zn & Ag Project

Europa Metals, the European focused lead-zinc and silver developer, is pleased to announce that it will be making an investor presentation at the Turner Pope-Vox Markets webinar on Wednesday, 14 July 2021 at 3.30 p.m. (GMT) which investors may attend via the following link: https://voxmarkets.brand.live/c/vox-markets-and-turner-pope-webinar-wednesday-july-14th

Developing Potential Future Lead, Zinc & Silver Production within the EU

The Company is currently conducting a Pre-Feasibility Study ("PFS") on its wholly owned Toral Lead, Zinc and Silver project, Spain, with Wardell Armstrong International Ltd as PFS manager, further to, inter alia, the preliminary economic study successfully completed by Bara Consulting and Addison Mining Services Limited in November 2020 which determined the following key parameters:

Resource

Indicated Tonnes

3.8m

 

Inferred Tonnes

13m

 

Total Tonnes

17m

 

Av. ZnEq.%

7.3

Mining

Rate tpa

700,000

 

Grade ZnEq%

7.6%

 

Cost

US$36/t

 

LOM

12 years

Metallurgy

Process

Sorting+Flotation

 

Recovery (Average)

85% Zn, 87% Pb, 86% Ag

Capex

Mine

US$86m

 

Upfront (to production)

US$79m

Financials

NPV

US$156m

 

IRR

31.3%

 

Payback Year

4

 

Located within the province of Castilla y León, north-west Spain, the Toral project is well positioned to become a potential high grade production source of lead, zinc and silver within the EU trading block.

 

For further information on the Company, please visit www.europametals.com or contact:

 

Europa Metals Ltd

Dan Smith, Non-Executive Director and Company Secretary (Australia)

T: +61 417 978 955

Laurence Read, CEO (UK)

T: +44 (0)20 3289 9923

 

Linkedin: Europa Metals ltd

Twitter: @ltdeuropa

Vox: Europametals

 

 

Notes to Editors:

 

Appendix: Further information on the Toral Project

 

Mineral Resource Estimate

 

· An Indicated resource of approximately 3.8Mt @ 8.3% Zn Equivalent (including Pb credits), 4.7% Zn, 3.9% Pb and 30g/t Ag, including:

o 180,000 tonnes of zinc, 150,000 tonnes of lead and 3.7 million ounces of silver.

· An Inferred resource of approximately 14Mt @ 6.5% Zn Equivalent (including Pb credits), 4% Zn, 2.7% Pb and 23 g/t Ag, including:

o 540,000 tonnes of zinc, 360,000 tonnes of lead and 10 million ounces of silver.

· A total resource of approximately 17Mt @ 6.9% Zn Equivalent (including Pb credits), 4.1% Zn, 2.9% Pb and 24 g/t Ag, including:

o 720,000 tonnes of zinc, 510,000 tonnes of lead and 14 million ounces of silver.

 

Table 1: Summary of Indicated and Inferred mineral resources for the Toral property reported at a 4.0% Zn equivalent cut-off grade (including Pb and Ag credits) and estimated grade and tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimate and, as such, totals may not cast.

 

Cut-Off Zn Eq (PbAg)%

Tonnes (Millions)

Density

Zn_Eq (Pb)%

Zn Eq (PbAg)%

Zn %

Pb %

Ag g/t

Contained Zn Tonnes (000s)

Contained Pb Tonnes (000s)

Ag Troy Oz (Millions)

Indicated

6

2.8

2.9

9.5

10.0

5.3

4.5

34

150

130

3.1

5

3.3

2.9

8.9

9.5

5.0

4.2

32

170

140

3.4

4

3.8

2.9

8.3

8.9

4.7

3.9

30

180

150

3.7

3

4.1

2.9

7.9

8.5

4.4

3.7

29

180

150

3.8

Inferred

6

8

2.9

7.8

8.3

4.7

3.4

28

370

270

7.2

5

10

2.9

7.2

7.7

4.4

3.0

26

450

310

8.6

4

14

2.9

6.5

6.9

4.0

2.7

23

540

360

10

3

17

2.9

5.9

6.3

3.7

2.4

20

610

400

11

Total

6

11

2.9

8.2

8.8

4.8

3.7

30

520

390

10

5

14

2.9

7.6

8.1

4.5

3.3

27

620

450

12

4

17

2.9

6.9

7.3

4.1

2.9

24

720

510

14

3

21

2.9

6.3

6.7

3.8

2.7

22

790

560

15

Transitional Oxide Material

4

3

2.9

5.2

5.7

2.6

2.9

27

75

83

2.5

Unweathered Fresh Rock

4

14

2.9

7.2

7.7

4.5

3.0

24

650

430

11

 

* - Zn Eq (Pb)% is the calculated Zn equivalent incorporating lead credits; (Zn Eq (Pb)% = Zn + Pb*0.926). Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead; (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019). Zn equivalent calculations were based on 3-year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t and Ag price of US$16.2/oz.

 

Notes:

1. No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

2. Numbers are rounded to reflect the fact that an Estimate of Resources is being reported as stipulated by JORC 2012. Rounding of numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.

3. Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t and Ag price of US$16.2/Oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company's opinion that all the elements included in the metal equivalents calculation (zinc, lead and silver) have a reasonable potential to be recovered and sold.

4. Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019).

5. Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.926).

6. The Mineral Resource Estimate set out above for the zinc, lead and silver mineralisation in the Toral Project area is based on a 3D geologic model and wireframe restricted block model that integrated the exploration work on the Toral project up to 21 January 2020. The block model used uniform cell size of 25x10x25m to best suit the orientation of the mineralisation and sample spacing. The block model was rotated by 20° in plan view to best match the trend of mineralisation. Sub cells were applied to better fit the wireframe solid models and preserve accurate volume as much as possible. Cells were interpolated at the parent block scale using an Ordinary Kriging.

7. Following statistical analysis and assessment of the updated assay composite database top cuts of 125g/t Ag were applied to the data. No top cuts were applied for Zn or Pb.

8. The Indicated and Inferred mineral resource category for the Toral lead-zinc-silver project set out in Table 1 (at cut-off grades >4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).

9. The tonnes and grades reported at a cut-off grade of 3% Zn equivalent are below the economic cut-off grade of 4% and as such should not be considered mineral resources, they are shown here for comparison purposes only.

 

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRASFEFLEEFSESW
Date   Source Headline
2nd Feb 20267:00 amRNSCancellation - EUROPA METALS LTD
30th Jan 20267:00 amRNSEuropa Metals: Cancellation of admission to AIM
20th Jan 202612:45 pmRNSLSE Timetable regarding Return of Capital
19th Jan 202611:00 amRNSReturn of Capital Finalisation
16th Jan 202612:54 pmRNSResult of AGM
15th Dec 20257:00 amRNSNotice of AGM and Proposed Return of Capital
26th Nov 20257:00 amRNSPostponement of 2025 Annual General Meeting
6th Nov 20257:00 amRNSProposed Acquisition of Marula Africa Mining Ltd
31st Oct 20251:15 pmRNSAnnual Financial Report
14th May 20257:30 amRNSSuspension - Europa Metals Ltd
14th May 20257:00 amRNSSuspension of trading on AIM
7th May 20257:00 amRNSFee Conversions and Issue of Equity
23rd Apr 20257:00 amRNSPartial disposal of Denarius Metals shares
28th Mar 20259:30 amRNSHalf-year Report
21st Feb 20257:00 amRNSCorporate Update
17th Feb 20257:00 amRNSViridian Metals Transaction Update
22nd Jan 20257:00 amRNSViridian Metals Transaction Update
6th Dec 20249:00 amRNSViridian Metals Transaction Update
29th Nov 20241:00 pmRNSResult of AGM
26th Nov 20247:00 amRNSConvertible loan note issuance
13th Nov 20249:00 amRNSCompletion of Disposal of Toral Project
6th Nov 202410:00 amRNSNotice of AGM
31st Oct 20249:00 amRNSFinal Results
28th Oct 20242:00 pmRNSViridian Metals Transaction Update
25th Oct 20242:00 pmRNSResults of General Meeting
1st Oct 202411:00 amRNSNotice of General Meeting
17th Sep 20247:30 amRNSProposed Disposal of Toral Project to Denarius
17th Sep 20247:30 amRNSSuspension - Europa Metals Ltd
17th Sep 20247:00 amRNSProposed Company Acquisition, RTO & AIM suspension
16th Sep 202410:00 amRNSHolding(s) in Company
30th Aug 20248:45 amRNSHolding(s) in Company
13th Aug 20241:00 pmRNSHolding(s) in Company
26th Jul 20249:00 amRNSHolding(s) in Company
2nd Jul 202411:00 amRNSHolding(s) in Company
26th Jun 20241:00 pmRNSHolding(s) in Company
14th May 202412:00 pmRNSChange of Auditor
28th Mar 20247:28 amRNSHalf-year Report
11th Dec 20237:00 amRNSConversion of Performance Rights
30th Nov 202311:30 amRNSResult of AGM
1st Nov 20237:00 amRNSFinal Results and Notice of AGM
23rd Oct 20237:00 amRNSToral Mining Licence Application process completed
9th Oct 20237:00 amRNSAppointment of Nominated Adviser and Broker
4th Aug 20237:00 amRNSDrilling Results and Mining Licence Update
25th Jul 20238:00 amRNSDrawdown of Final Tranche of CDTI Loan
19th May 20237:00 amRNSDrilling Results
5th Apr 202310:00 amRNSOperational Update
31st Mar 20237:00 amRNSHalf-year Report
22nd Mar 20232:00 pmRNSToral JV Update: Initial budget agreed w/Denarius
24th Jan 20231:00 pmRNSDirectors’ Dealings and Issue of Equity
30th Dec 202212:00 pmRNSResult of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.