Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

  • This share is currently suspended. It was suspended at a price of 1.025
  • There is currently no data for EUZ

Investor Webinar

12 Jul 2021 15:06

RNS Number : 9703E
Europa Metals Ltd
12 July 2021
 

12 July 2021

Europa Metals Ltd

("Europa Metals", the "Company" or the "Group") (AIM, AltX: EUZ)

Investor Webinar - Toral Pb, Zn & Ag Project

Europa Metals, the European focused lead-zinc and silver developer, is pleased to announce that it will be making an investor presentation at the Turner Pope-Vox Markets webinar on Wednesday, 14 July 2021 at 3.30 p.m. (GMT) which investors may attend via the following link: https://voxmarkets.brand.live/c/vox-markets-and-turner-pope-webinar-wednesday-july-14th

Developing Potential Future Lead, Zinc & Silver Production within the EU

The Company is currently conducting a Pre-Feasibility Study ("PFS") on its wholly owned Toral Lead, Zinc and Silver project, Spain, with Wardell Armstrong International Ltd as PFS manager, further to, inter alia, the preliminary economic study successfully completed by Bara Consulting and Addison Mining Services Limited in November 2020 which determined the following key parameters:

Resource

Indicated Tonnes

3.8m

 

Inferred Tonnes

13m

 

Total Tonnes

17m

 

Av. ZnEq.%

7.3

Mining

Rate tpa

700,000

 

Grade ZnEq%

7.6%

 

Cost

US$36/t

 

LOM

12 years

Metallurgy

Process

Sorting+Flotation

 

Recovery (Average)

85% Zn, 87% Pb, 86% Ag

Capex

Mine

US$86m

 

Upfront (to production)

US$79m

Financials

NPV

US$156m

 

IRR

31.3%

 

Payback Year

4

 

Located within the province of Castilla y León, north-west Spain, the Toral project is well positioned to become a potential high grade production source of lead, zinc and silver within the EU trading block.

 

For further information on the Company, please visit www.europametals.com or contact:

 

Europa Metals Ltd

Dan Smith, Non-Executive Director and Company Secretary (Australia)

T: +61 417 978 955

Laurence Read, CEO (UK)

T: +44 (0)20 3289 9923

 

Linkedin: Europa Metals ltd

Twitter: @ltdeuropa

Vox: Europametals

 

 

Notes to Editors:

 

Appendix: Further information on the Toral Project

 

Mineral Resource Estimate

 

· An Indicated resource of approximately 3.8Mt @ 8.3% Zn Equivalent (including Pb credits), 4.7% Zn, 3.9% Pb and 30g/t Ag, including:

o 180,000 tonnes of zinc, 150,000 tonnes of lead and 3.7 million ounces of silver.

· An Inferred resource of approximately 14Mt @ 6.5% Zn Equivalent (including Pb credits), 4% Zn, 2.7% Pb and 23 g/t Ag, including:

o 540,000 tonnes of zinc, 360,000 tonnes of lead and 10 million ounces of silver.

· A total resource of approximately 17Mt @ 6.9% Zn Equivalent (including Pb credits), 4.1% Zn, 2.9% Pb and 24 g/t Ag, including:

o 720,000 tonnes of zinc, 510,000 tonnes of lead and 14 million ounces of silver.

 

Table 1: Summary of Indicated and Inferred mineral resources for the Toral property reported at a 4.0% Zn equivalent cut-off grade (including Pb and Ag credits) and estimated grade and tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimate and, as such, totals may not cast.

 

Cut-Off Zn Eq (PbAg)%

Tonnes (Millions)

Density

Zn_Eq (Pb)%

Zn Eq (PbAg)%

Zn %

Pb %

Ag g/t

Contained Zn Tonnes (000s)

Contained Pb Tonnes (000s)

Ag Troy Oz (Millions)

Indicated

6

2.8

2.9

9.5

10.0

5.3

4.5

34

150

130

3.1

5

3.3

2.9

8.9

9.5

5.0

4.2

32

170

140

3.4

4

3.8

2.9

8.3

8.9

4.7

3.9

30

180

150

3.7

3

4.1

2.9

7.9

8.5

4.4

3.7

29

180

150

3.8

Inferred

6

8

2.9

7.8

8.3

4.7

3.4

28

370

270

7.2

5

10

2.9

7.2

7.7

4.4

3.0

26

450

310

8.6

4

14

2.9

6.5

6.9

4.0

2.7

23

540

360

10

3

17

2.9

5.9

6.3

3.7

2.4

20

610

400

11

Total

6

11

2.9

8.2

8.8

4.8

3.7

30

520

390

10

5

14

2.9

7.6

8.1

4.5

3.3

27

620

450

12

4

17

2.9

6.9

7.3

4.1

2.9

24

720

510

14

3

21

2.9

6.3

6.7

3.8

2.7

22

790

560

15

Transitional Oxide Material

4

3

2.9

5.2

5.7

2.6

2.9

27

75

83

2.5

Unweathered Fresh Rock

4

14

2.9

7.2

7.7

4.5

3.0

24

650

430

11

 

* - Zn Eq (Pb)% is the calculated Zn equivalent incorporating lead credits; (Zn Eq (Pb)% = Zn + Pb*0.926). Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead; (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019). Zn equivalent calculations were based on 3-year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t and Ag price of US$16.2/oz.

 

Notes:

1. No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

2. Numbers are rounded to reflect the fact that an Estimate of Resources is being reported as stipulated by JORC 2012. Rounding of numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.

3. Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t and Ag price of US$16.2/Oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company's opinion that all the elements included in the metal equivalents calculation (zinc, lead and silver) have a reasonable potential to be recovered and sold.

4. Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019).

5. Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.926).

6. The Mineral Resource Estimate set out above for the zinc, lead and silver mineralisation in the Toral Project area is based on a 3D geologic model and wireframe restricted block model that integrated the exploration work on the Toral project up to 21 January 2020. The block model used uniform cell size of 25x10x25m to best suit the orientation of the mineralisation and sample spacing. The block model was rotated by 20° in plan view to best match the trend of mineralisation. Sub cells were applied to better fit the wireframe solid models and preserve accurate volume as much as possible. Cells were interpolated at the parent block scale using an Ordinary Kriging.

7. Following statistical analysis and assessment of the updated assay composite database top cuts of 125g/t Ag were applied to the data. No top cuts were applied for Zn or Pb.

8. The Indicated and Inferred mineral resource category for the Toral lead-zinc-silver project set out in Table 1 (at cut-off grades >4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).

9. The tonnes and grades reported at a cut-off grade of 3% Zn equivalent are below the economic cut-off grade of 4% and as such should not be considered mineral resources, they are shown here for comparison purposes only.

 

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRASFEFLEEFSESW
Date   Source Headline
6th Nov 20158:54 amRNSResponse to ASX Letter re Appendix 5B
30th Oct 20153:30 pmRNSHolding(s) in Company
30th Oct 20157:00 amRNSQuarterly Activities and Cashflow Report
29th Oct 20157:00 amRNSMail-out of Notice of Annual General Meeting
14th Oct 20157:00 amRNSBFS Farm-In Agreement Concluded with BVI/Ovation
30th Sep 20157:00 amRNSFinal Results
30th Jul 20157:00 amRNSQuarterly Activities and Cashflow Report
22nd Jul 201510:30 amRNSUpdate re PMI Funding Arrangements
16th Jul 201512:00 pmRNSUpdate re First Funding Payment from PMI
12th Jun 20159:00 amRNSChange of Address of Share Registry
3rd Jun 20157:00 amRNSUpdate re: BFS Financing Agreement
1st Jun 201512:00 pmRNSUpdate re: Admission of Placement Shares
29th May 20157:00 amRNSChange of Adviser
15th May 201511:34 amRNSReplacement- Changes to Directors' Interests
15th May 20158:00 amRNSDirector/PDMR Shareholding
14th May 20158:01 amRNSPrivate Placing
5th May 20157:01 amRNSUS$12m BFS Financing Agreement
29th Apr 20157:00 amRNSQuarterly Activities and Cashflow Report
28th Apr 20157:00 amRNSBFS Infrastructure Process Update, South Africa
24th Apr 20154:40 pmRNSSecond Price Monitoring Extn
24th Apr 20154:35 pmRNSPrice Monitoring Extension
1st Apr 20158:00 amRNSFirst Mine Location Identified Following Drilling
25th Mar 20157:00 amRNSChange of Registered Office
23rd Mar 201510:00 amRNSChange of Adviser
16th Mar 20157:00 amRNSHalf Yearly Report
2nd Mar 20157:00 amRNSAppointment of Financial Adviser
11th Feb 20159:00 amRNSGrant of Options to Adviser
2nd Feb 20157:00 amRNSFirst BFS Drill Programme Complete
29th Jan 20157:00 amRNSQuarterly Activities and Cashflow Report
21st Jan 20154:40 pmRNSSecond Price Monitoring Extn
21st Jan 20154:35 pmRNSPrice Monitoring Extension
19th Jan 20157:00 amRNSChange of Adviser
15th Dec 201410:35 amRNSHolding(s) in Company
12th Dec 20147:00 amRNSDirectorate Change
10th Dec 20147:00 amRNSIssue of Equity
8th Dec 20147:00 amRNSStudy Manager Appointment and Workstream Update
27th Nov 20147:00 amRNSResult of AGM
17th Nov 20147:00 amRNSSubstantial Shareholder Notice
17th Nov 20147:00 amRNSIssue of Shares and Change in Directors' Interests
10th Nov 20143:11 pmRNSIssue of Shares under Entitlements Offer
6th Nov 20147:00 amRNSResults of Entitlements Offer
28th Oct 20147:00 amRNSQuarterly Activities and Cashflow Report
23rd Oct 20147:00 amRNSNotice of AGM
23rd Oct 20147:00 amRNSMail-out of Entitlements Offer Booklet
14th Oct 20148:37 amRNSEntitlements Offer Booklet
10th Oct 20149:14 amRNSPlacing Notice in Compliance with ASX Listing
9th Oct 20149:50 amRNSRights Issue for funding of BFS
9th Oct 20148:30 amRNSASX Voluntary Suspension
7th Oct 20148:23 amRNSASX Trading Halt
1st Oct 20147:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.