Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

Share Price is delayed by 15 minutes
Get Live Data
2.60    -0.10 (-3.70%)
Bid:
2.50
Ask:
2.70
Spread: 0.20 (8.00%)
Market Cap: £76.74m
EUA Live PriceLast checked at - London Stock Exchange

Intraday Eurasia Mining Share Chart

Projects update

3 Nov 2016 07:00

RNS Number : 1768O
Eurasia Mining PLC
03 November 2016
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company") 

Projects Update

The Company is pleased to update shareholders on progress on its three projects in Russia. Eurasia's West Kytlim platinum and gold project is now in production, first shipments of concentrate began in early September (see RNS dated 9 September 2016). The Monchetundra Project is in late stage development and has been bolstered by an Engineering, Procurement, Construction and Commissioning ("EPC") contract with Sinosteel Equipment and Engineering Co Ltd, while the Semenovsky Gold in Tailings Project remains under review as metallurgical test work for cyanide gold recovery nears completion.

 

 

Monchetundra, Kola Peninsula, NW Russia

 

As announced on Monday 10 October 2016, Eurasia has signed an EPC contract between Sinosteel (one of the largest Chinese stated-owned engineering groups), and Terskaya Gornaya Kompaniya ('TGK'), Eurasia's 80% subsidiary which holds the Monchetundra PGM licence near Monchegorsk, an industrialized area of the Kola Peninsula close to the border with Finland.

 

- Under the terms of the EPC contract, Sinosteel has undertaken to build a processing facility capable of treating 1.7 million tonnes per annum from two open pits within the Monchetundra licence and capable of extracting 130,000 oz of platinum equivalent per annum. The contract value totals US$176,000,000 with a US$50,000,000 subcontract assigned to TGK in respect of preparatory and pre-strip works.

 

- Sinosteel is to be responsible for debt finance covering 85% of the contract value with debt obligations assigned to TGK when the facility achieves production of 130,000 oz PGM equivalent per annum. The loan is assigned to TGK only on successful completion of the works such that Sinosteel are motivated to achieve design capacity on schedule. Interest is charged at a floating rate of 6 month LIBOR +3.5% per annum and the loan term set at 10 years with no penalty for early repayment.

 

- Following the success of the royalty-like structure signed and implemented on the West Kytlim project, Eurasia has entered into talks with an international engineering company to manage the mining operation at the Monchetundra project, and to work for the company as the owner's representative throughout the design and build phase of the Sinosteel EPC agreement and thereafter during the operation of the mine. It is envisaged that the structure used successfully at West Kytlim, where the mining operation is outsourced for a split on revenue, can be replicated at the Monchetundra project. Further updates will be made in due course.

 

 

 

West Kytlim, Urals

 

Mining and production of platinum continues at West Kytlim, with weather not stopping production and the forecast reasonable for the coming weeks. The Company will provide details of the final production figures and projected income on completion of the season's works. The trial mining operation has tested two washplants, one owned by Eurasia and refurbished on site, and another larger plant supplied by the contractor SK-Region Stroy. The information pertaining to the constitution and washability of gravels gained from these exercises will be instrumental in ensuring a smooth path to next season's production, as we approach the close of this year's mining season.

 

 

Semenovsky Tailings Project, Urals

 

Metallurgical testwork continues to investigate the details of the tailings composition, in view of the material being sourced historically from three mines with different mineralogy. This work will be completed shortly and then form the basis of an assessment by metallurgists for the optimal production route. Work is being carried out at SGS Chita and further announcements will be made in due course.

 

 

 

MD Christian Schaffalitzky commented: 

 

"We have endeavored to replicate the structure, which has been proven to work at West Kytlim, at the Monchetundra Project with an additional contract to cover the considerable capital outlay. We believe this presents a route to project development which minimizes exposure for Eurasia, further shareholder dilution, and allows the project to be developed despite a continuing resource sector downturn.

 

We believe the transaction is very much on trend considering Sino-Russian relations over the past number of years. Chinese firms are increasingly active in the Russian market in rare earths, PGM, base metals and precious metals. It was our intention to capitalize on this evolving relationship and to offset some of the development risk to a suitably qualified and experienced engineering firm with considerable banking and political reach. Sinosteel is, under the terms of the contract, highly motivated to deliver the plant as stipulated in the contract, because they will be responsible for $150 million until they reach the production level of 130,000 oz of platinum equivalent per annum.

 

Further outsourcing the running of the mine to an international company with experience in operating mines is now a top priority for Eurasia. Engaging such a group to act as owner's representative during plant construction aims to ensure the plant is built in line with best international practice. We look forward to updating on developments in this regard in the near term."

 

 

Enquiries:

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

WH Ireland Limited

Katy Mitchell/Nick Prowting

+44 (0)161 832 2174

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDFSFFMEFMSEFF
Date   Source Headline
9th May 20177:00 amRNSCompany Update
26th Apr 20174:21 pmRNSSanderson Partners facility drawdown
3rd Apr 20174:27 pmRNSMonchetundra Project - Feasibility Study Approval
29th Mar 20172:36 pmRNSSanderson Partners facility drawdown
24th Mar 20177:00 amRNSCompany Update
21st Feb 20174:38 pmRNSSanderson Partners facility drawdown
6th Feb 201712:22 pmRNSWest Kytlim Update
6th Feb 201712:17 pmRNSSuccessful step up to Production at West Kytlim
3rd Feb 20177:00 amRNSIssue of Equity
17th Jan 20173:03 pmRNSProjects Update January 2017
30th Dec 201611:28 amRNSIssue of Equity and Director Holdings
22nd Dec 201611:43 amRNSProject Update
21st Dec 20167:00 amRNSLoan Agreement and Issue of Equity
21st Nov 201610:08 amRNSPotential Agreement
18th Nov 20161:52 pmRNSIssue of Equity
3rd Nov 20167:00 amRNSProjects update
26th Oct 20167:00 amRNSIssue of Equity
10th Oct 20162:50 pmRNSProcurement, Construction & Commissioning contract
21st Sep 20167:25 amRNSIssue of equity to settle fees and remuneration
21st Sep 20167:20 amRNSWest Kytlim update/Loan facility & issue of equity
15th Sep 20167:00 amRNSInterim Results - six months ended 30 June 2016
9th Sep 20162:22 pmRNSAcceptance report from Ekaterinburg refinery
9th Sep 20167:00 amRNSFirst platinum concentrate at West Kytlim
1st Sep 20167:00 amRNSWest Kytlim Mining operation update - August 2016
31st Aug 20167:00 amRNSSemenovsky Tailings Project - Reserves Approval
1st Aug 20164:04 pmRNSLoan Agreement and Issue of Equity
28th Jul 20167:00 amRNSPlatinum refining and sales agreements
27th Jul 20167:00 amRNSWest Kytlim Mining operation update - July 2016
4th Jul 20167:00 amRNSSemenovsky Tailings Project & receipt of assays
30th Jun 201612:14 pmRNSResult of AGM
21st Jun 20167:00 amRNSMining start-up at West Kytlim
7th Jun 20167:00 amRNSAnnual Results for the 12 months ended 31 Dec 2015
31st May 20167:00 amRNSIssue of Equity and Repayment of Debt
25th May 20167:00 amRNSContract Mining at West Kytlim
12th May 20167:00 amRNSIssue of Equity
4th May 20167:00 amRNSExtension of Semenovsky Tailings Heads of Terms
26th Apr 20168:52 amRNSProject Update: Semenovsky Gold Tailings Project
22nd Apr 20167:00 amRNSPositive Drilling Results at Monchetundra
18th Apr 20168:43 amRNSAdvancement to Production Update
5th Apr 20167:00 amRNSIssue of Equity and Directors Shareholdings
16th Mar 20163:00 pmRNSUpdate re Gold Tailings Opportunity
29th Feb 20167:00 amRNSWest Kytlim Project Update
23rd Feb 20168:20 amRNSIssue of Equity
12th Feb 20168:00 amRNSExtension of Option Agreement
12th Feb 20168:00 amRNSLoan Agreement
27th Jan 20167:00 amRNSWest Kytlim Platinum Production 2016 - Update
16th Nov 20157:00 amRNSGold Tailings Production Opportunity
3rd Nov 20157:00 amRNSWest Kytlim Platinum Project - Progress Update
6th Oct 20158:18 amRNSWest Kytlim Mining Licence Awarded
29th Sep 20153:55 pmRNSHalf Yearly Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.