The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Oil & Gas Regulatory News (EOG)

Share Price Information for Europa Oil & Gas (EOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.90
Bid: 0.85
Ask: 0.95
Change: 0.00 (0.00%)
Spread: 0.10 (11.765%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.90
EOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Wressle Development Update

3 Aug 2020 07:00

Europa Oil & Gas (Holdings) Plc - Wressle Development Update

Europa Oil & Gas (Holdings) Plc - Wressle Development Update

PR Newswire

London, July 31

Europa Oil & Gas (Holdings) plc / Index: AIM / Epic: EOG / Sector: Oil & Gas

Europa Oil & Gas (Holdings) plc (‘Europa’ or ‘the Company’)

 Wressle Development Update

Europa Oil & Gas (Holdings) plc, the UK, Ireland and Morocco focused oil and gas exploration, development and production company, notes today’s update from Egdon Resources (‘Egdon’) confirming the commencement of site works at the Wressle Oil Field development (‘Wressle’ or the ‘Project’) in North Lincolnshire. This is in line with the previously stated target to achieve first oil at Wressle in H2 2020. Wressle lies on licences PEDL180 & 182 in which Europa holds a 30% working interest alongside Egdon (30%), and Union Jack Oil (40%).

As advised by the operator, Egdon, the civils contractor has mobilised to site and has commenced works to reconfigure the Wressle production area. Works being undertaken include the installation of a new High Density Polyethelene impermeable membrane; French drain system; an approved surface water interceptor; the construction of a purpose-built bund area for storage tanks; a tanker loading plinth; and an internal roadway system.

The reconfiguration of the Wressle production area forms a central part of the Wressle development plan, the key stages of which and work carried out to date are listed below:

Discharging the planning conditions, finalising detailed designs, tendering and procurement of materials, equipment and services and finalising all Health and Safety Executive (“HSE”) documentation and procedures: Key planning conditions have been discharged, detailed design tendering is underway and all HSE documentation and procedures are progressing in line with expectations Installation of groundwater monitoring boreholes and establishing baseline groundwater quality through monitoring and analysis: Four groundwater boreholes have been installed and two rounds of sampling and analysis undertaken to date Reconfiguration of the site: Site works have commenced Installation and commissioning of surface facilities Sub-surface operations Commencement of production

Simon Oddie, Interim CEO and Executive Chairman of Europa, said: “Today’s news that siteworks have commenced and that the Wressle field remains on course to commence production in H2 2020 is highly encouraging. With oil at over US$40 per barrel and Wressle requiring oil prices of US$17.62 per barrel to breakeven, we are keen to get what promises to be a highly profitable UK onshore field into production. At an initial gross rate of 500bopd, our 30% share in the field will equate to 150 bopd net to Europa which will scale up our existing production to well over 200bopd and in the process transform our revenue profile. This will provide us with a strong platform with which to advance our portfolio of multistage licences including our industry leading exploration position in the proven gas play of the Slyne Basin offshore Ireland and our large Inzegane permit offshore Morocco where initial work has identified 30 targets which could hold up to 10 billion barrels of oil."

Further Information on Wressle

Wressle was discovered by the Wressle-1 well in 2014. During testing, a total of 710 barrels of oil equivalent per day were recovered from three separate reservoirs, the Ashover Grit, the Wingfield Flags and the Penistone Flags. Under the development plan, Wressle is expected to commence production at an initial gross rate of 500bopd, which would more than double Europa’s existing UK onshore production to over 200bopd. With an estimated breakeven oil price of US$17.62 per barrel, production at Wressle is expected to be very profitable at current oil prices of over US$40 per barrel. In September 2016, a Competent Person’s Report provided independent estimates of reserves and contingent and prospective oil and gas resources for the Wressle discovery of 2.15 million stock tank barrels classified as discovered (2P+2C).

* * ENDS * *

For further information please visit www.europaoil.com or contact:

Simon OddieEuropa+ 44 (0) 20 7224 3770
Phil GreenhalghEuropa+ 44 (0) 20 7224 3770
Christopher RaggettfinnCap Ltd+ 44 (0) 20 7220 0500
Simon HicksfinnCap Ltd+ 44 (0) 20 7220 0500
Frank BuhagiarSt Brides Partners Ltd+ 44 (0) 20 7236 1177
Megan DennisonSt Brides Partners Ltd+ 44 (0) 20 7236 1177

Notes

Europa Oil & Gas (Holdings) plc has a diversified portfolio of multi-stage hydrocarbon assets which includes production, development and exploration interests, in countries that are politically stable, have transparent licensing processes, and offer attractive terms. In terms of production, in 2019 Europa produced 91 boepd. Production is set to increase to over 200 boepd in H2 2020 once the Wressle field in the UK, which is currently under development, comes on stream at a gross rate of 500 bopd.

The Company holds four exploration licences offshore Ireland which have the potential to host gross mean un-risked prospective resources of 3.9 billion barrels oil equivalent and 2.7* trillion cubic feet (‘tcf’) gas (*subject to regulatory approval for the transfer of FEL 3/19). The Company’s flagship projects offshore Ireland are Inishkea and Edge, two near field gas prospects in the Slyne Basin which the Company classifies as lower risk infrastructure-led exploration due to their close proximity to the producing Corrib gas field and associated gas processing infrastructure. In September 2019, Europa was awarded a 75% interest in the Inezgane permit offshore Morocco. Initial results of technical work have identified 30 prospects and leads that have the potential to hold close to 10 billion barrels of unrisked resources.

Date   Source Headline
8th Jan 20143:00 pmRNSRequisition of General Meeting
23rd Dec 20131:18 pmPRNOpen Offer Shares Qualify for EIS and VCT Schemes
20th Dec 20137:00 amPRNOpen Offer
16th Dec 20132:00 pmRNSDirector dealing
16th Dec 20137:00 amPRNPlacing and Open Offer
10th Dec 20134:47 pmPRNResult of AGM
10th Dec 20137:00 amPRNAGM Statement
24th Oct 20137:00 amPRNCompletion of 3D Seismic Offshore Ireland
11th Oct 20137:00 amPRNFinal Results
3rd Oct 20133:15 pmPRNRenewal of Béarn des Gaves Permit, Onshore France
23rd Sep 20137:00 amPRNUpdate on Holmwood, Onshore UK
9th Sep 20137:00 amPRNOperations Update
25th Jul 20133:56 pmPRNFavourable Holmwood High Court Decision
24th Jul 20133:12 pmPRNDirectors Dealing
24th Jul 20137:00 amPRNDirector's Dealings
23rd Jul 20137:00 amPRNUpdate re French Exploration Permits
15th Jul 20137:00 amPRNCommencement of 3D Seismic, Offshore Ireland
24th Jun 20137:00 amPRNPlanning Application Granted to Drill Well Onshore UK
21st May 20137:00 amPRNRelinquishment of Licences in Romania & the SADR
13th May 20137:00 amPRNKosmos Farm-in to Europa’s Irish Licences Approved
26th Apr 20137:00 amPRNInterim Results
18th Apr 20137:00 amPRNKosmos Energy to Farm-in to Europa’s Irish Licences
19th Mar 20137:00 amPRNSeismic Acquisition Commences on PEDL181, UK Onshore
19th Feb 20137:00 amPRNUpdate on First Half Production and Revenues
16th Jan 20137:00 amPRNUpdate on Irish Atlantic Margin Prospects
12th Dec 201211:56 amPRNResult of AGM
11th Dec 20127:00 amPRNAGM Statement
6th Nov 20127:00 amPRNPositive Update on Irish Atlantic Margin Prospects
1st Nov 20127:00 amPRNHolmwood Prospect Appeal Decision to be Contested
25th Oct 20127:01 amPRNAward of Options
16th Oct 20127:00 amPRNFinal Results
19th Sep 20127:00 amPRNTwo large prospects identified on Irish Atlantic Margin
15th Aug 20127:00 amPRNMajor Increase in Full Year Production and Revenues
31st Jul 201211:11 amPRNDirector's Dealings
26th Jul 201211:14 amPRNDirector's Dealings
11th Jun 20122:29 pmPRNNew Corporate Website
1st Jun 20127:00 amPRNPositive CPR for UK and French Assets
19th Apr 20127:00 amPRNInterim Results
22nd Mar 20129:07 amPRNWithdrawal from Cuejdiu Licence in Romania
8th Feb 20127:00 amPRNSignificant Increase in H1 Production and Revenues
20th Jan 20127:00 amPRNUpdate on UK Production and Romanian Interests
5th Jan 20121:30 pmPRNHoldings in Company
16th Dec 20113:52 pmPRNProduction Update
13th Dec 20114:46 pmPRNResult of Annual General Meeting
13th Dec 20117:00 amPRNAGM Statement
22nd Nov 20117:00 amPRNDirector dealings
16th Nov 20117:00 amPRNDirector/PDMR Share Dealing
15th Nov 20117:00 amPRNRomanian Operations Update
31st Oct 20112:40 pmPRNTotal Voting Rights
31st Oct 20112:37 pmPRNTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.