The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Oil & Gas Regulatory News (EOG)

Share Price Information for Europa Oil & Gas (EOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.90
Bid: 0.85
Ask: 0.95
Change: 0.00 (0.00%)
Spread: 0.10 (11.765%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.90
EOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Wressle Development Update

3 Aug 2020 07:00

Europa Oil & Gas (Holdings) Plc - Wressle Development Update

Europa Oil & Gas (Holdings) Plc - Wressle Development Update

PR Newswire

London, July 31

Europa Oil & Gas (Holdings) plc / Index: AIM / Epic: EOG / Sector: Oil & Gas

Europa Oil & Gas (Holdings) plc (‘Europa’ or ‘the Company’)

 Wressle Development Update

Europa Oil & Gas (Holdings) plc, the UK, Ireland and Morocco focused oil and gas exploration, development and production company, notes today’s update from Egdon Resources (‘Egdon’) confirming the commencement of site works at the Wressle Oil Field development (‘Wressle’ or the ‘Project’) in North Lincolnshire. This is in line with the previously stated target to achieve first oil at Wressle in H2 2020. Wressle lies on licences PEDL180 & 182 in which Europa holds a 30% working interest alongside Egdon (30%), and Union Jack Oil (40%).

As advised by the operator, Egdon, the civils contractor has mobilised to site and has commenced works to reconfigure the Wressle production area. Works being undertaken include the installation of a new High Density Polyethelene impermeable membrane; French drain system; an approved surface water interceptor; the construction of a purpose-built bund area for storage tanks; a tanker loading plinth; and an internal roadway system.

The reconfiguration of the Wressle production area forms a central part of the Wressle development plan, the key stages of which and work carried out to date are listed below:

Discharging the planning conditions, finalising detailed designs, tendering and procurement of materials, equipment and services and finalising all Health and Safety Executive (“HSE”) documentation and procedures: Key planning conditions have been discharged, detailed design tendering is underway and all HSE documentation and procedures are progressing in line with expectations Installation of groundwater monitoring boreholes and establishing baseline groundwater quality through monitoring and analysis: Four groundwater boreholes have been installed and two rounds of sampling and analysis undertaken to date Reconfiguration of the site: Site works have commenced Installation and commissioning of surface facilities Sub-surface operations Commencement of production

Simon Oddie, Interim CEO and Executive Chairman of Europa, said: “Today’s news that siteworks have commenced and that the Wressle field remains on course to commence production in H2 2020 is highly encouraging. With oil at over US$40 per barrel and Wressle requiring oil prices of US$17.62 per barrel to breakeven, we are keen to get what promises to be a highly profitable UK onshore field into production. At an initial gross rate of 500bopd, our 30% share in the field will equate to 150 bopd net to Europa which will scale up our existing production to well over 200bopd and in the process transform our revenue profile. This will provide us with a strong platform with which to advance our portfolio of multistage licences including our industry leading exploration position in the proven gas play of the Slyne Basin offshore Ireland and our large Inzegane permit offshore Morocco where initial work has identified 30 targets which could hold up to 10 billion barrels of oil."

Further Information on Wressle

Wressle was discovered by the Wressle-1 well in 2014. During testing, a total of 710 barrels of oil equivalent per day were recovered from three separate reservoirs, the Ashover Grit, the Wingfield Flags and the Penistone Flags. Under the development plan, Wressle is expected to commence production at an initial gross rate of 500bopd, which would more than double Europa’s existing UK onshore production to over 200bopd. With an estimated breakeven oil price of US$17.62 per barrel, production at Wressle is expected to be very profitable at current oil prices of over US$40 per barrel. In September 2016, a Competent Person’s Report provided independent estimates of reserves and contingent and prospective oil and gas resources for the Wressle discovery of 2.15 million stock tank barrels classified as discovered (2P+2C).

* * ENDS * *

For further information please visit www.europaoil.com or contact:

Simon OddieEuropa+ 44 (0) 20 7224 3770
Phil GreenhalghEuropa+ 44 (0) 20 7224 3770
Christopher RaggettfinnCap Ltd+ 44 (0) 20 7220 0500
Simon HicksfinnCap Ltd+ 44 (0) 20 7220 0500
Frank BuhagiarSt Brides Partners Ltd+ 44 (0) 20 7236 1177
Megan DennisonSt Brides Partners Ltd+ 44 (0) 20 7236 1177

Notes

Europa Oil & Gas (Holdings) plc has a diversified portfolio of multi-stage hydrocarbon assets which includes production, development and exploration interests, in countries that are politically stable, have transparent licensing processes, and offer attractive terms. In terms of production, in 2019 Europa produced 91 boepd. Production is set to increase to over 200 boepd in H2 2020 once the Wressle field in the UK, which is currently under development, comes on stream at a gross rate of 500 bopd.

The Company holds four exploration licences offshore Ireland which have the potential to host gross mean un-risked prospective resources of 3.9 billion barrels oil equivalent and 2.7* trillion cubic feet (‘tcf’) gas (*subject to regulatory approval for the transfer of FEL 3/19). The Company’s flagship projects offshore Ireland are Inishkea and Edge, two near field gas prospects in the Slyne Basin which the Company classifies as lower risk infrastructure-led exploration due to their close proximity to the producing Corrib gas field and associated gas processing infrastructure. In September 2019, Europa was awarded a 75% interest in the Inezgane permit offshore Morocco. Initial results of technical work have identified 30 prospects and leads that have the potential to hold close to 10 billion barrels of unrisked resources.

Date   Source Headline
19th Apr 20107:00 amPRNIssue of Equity
15th Apr 20107:00 amPRNVoitinel Test Update
9th Apr 201012:32 pmPRNDirector/PDMR Shareholding correction
9th Apr 201011:50 amPRNDirector/PDMR Shareholding
8th Apr 20107:05 amPRNAppointment of Chairman
8th Apr 20107:00 amPRNChange of Nomad and Broker
7th Apr 20107:00 amPRNInterim Management Statement
6th Apr 20107:00 amPRNHykeham Well Update
11th Mar 20109:00 amPRNOperational Update - Hykeham
24th Feb 20107:00 amPRNRomania Resources Update
10th Feb 20107:00 amPRNHykeham-1 Flow Test
4th Feb 201010:13 amPRNDirector/PDMR Shareholding
3rd Feb 201010:41 amPRNHykeham Timetable Update
28th Jan 20102:57 pmPRNPlanned Investor Presentation
21st Jan 20107:00 amPRNOperations Update - Hykeham
21st Dec 20097:00 amPRNRegulatory Approvals
16th Dec 20098:58 amPRNResult of AGM
9th Dec 20097:00 amPRNLicence Update
8th Dec 20097:00 amPRNHykeham-1 Further Update
4th Dec 200911:26 amPRNHykeham-1 to be completed
17th Nov 20097:00 amPRNVoitinel Gas Discovery Update
13th Nov 20097:00 amPRNHykeham Drilling Update
10th Nov 20099:17 amPRNDirector/PDMR Shareholding
28th Oct 20098:56 amPRNGrant of stock options
26th Oct 20093:53 pmPRNDrilling update
26th Oct 20096:00 amPRNHykeham Update
20th Oct 20097:00 amPRNAnnual Financial Report
24th Sep 20097:00 amPRNDrilling plans update
22nd Sep 20097:00 amPRNVoitinel Update
16th Sep 20099:45 amPRNOperations Update - East Midlands
2nd Sep 20092:55 pmPRNAnnouncement re: Placing
24th Aug 20097:13 amPRNDrilling Update
19th Aug 20098:00 amPRNRomania Update - Bacau Licence
17th Jul 20097:00 amPRNResumption of Production
25th Jun 20099:47 amPRNDirector/PDMR Shareholding
25th Jun 20099:34 amPRNDirector/PDMR Shareholding
24th Jun 20093:28 pmPRNInterruption to production
11th Jun 200911:14 amPRNExpiry of Warrants
5th Jun 20097:00 amPRNEgypt Update
28th May 20097:00 amPRNProduction Update
30th Apr 20097:00 amPRNHalf-yearly Report
23rd Apr 20096:07 pmPRNHolding(s) in Company
22nd Apr 200910:54 amPRNPlanning Permission
6th Apr 20097:00 amPRNDebt Facility
18th Mar 20097:00 amPRNWest Firsby Production Update
20th Feb 20097:00 amPRNDirector/PDMR Shareholding
13th Feb 20097:00 amPRNRomanian Gas Discovery
29th Jan 20097:00 amPRNHykeham-1 Spud
14th Jan 20093:03 pmPRNResult of AGM
8th Jan 200911:21 amPRNDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.