Operations Update

30 Mar 2011 09:00

Europa Oil & Gas (Holdings) plc

29/03/11

Operational Update

The Directors of Europa Oil & Gas (Holdings) plc are pleased to provide an update on several active projects.

Highlights

UK Production tested oil from two zones in the new onshore West Firsby well WF-9 Installation of jet pump is key to maximising rates Well stimulation work being planned for Crosby Warren

Romania Barchiz-1 sidetrack to deepen the well to the primary target

France 3D reprocessing complete at Berenx, new 3D and engineering work planned

West Firsby

Two zonal pumping tests have been conducted on the new WF-9 well. As previously reported, the well encountered oil in two reservoir zones.

The lower of these, Zone 2, produced oil at rates of around 80bopd with strong associated gas but very little water. Heavy wax build-up in the well and the high gas rates are thought to have impaired flow through the beam pump.

Zone 1 produces much higher volumes of fluid, but with a high water cut. Net oil production from this zone under a beam pump regime is 40bopd. The beam pump, however, is only able to drawdown the well some 300psi, indicating that there is significant production upside with a properly configured pump. It should be possible with a jet pump to produce drawdown in the region of 1,500psi or more and the main constraint will be fluid handling capacity. The recent successful re-completion of WF-3 as a water disposal well is key tool in managing this issue long term.

A jet pump system has been sourced and will be commissioned to undertake further tests on both zones. Following the results of these new tests, a longer term zonal production strategy will be decided.

The workover of WF-7, which required a new bottom hole assembly, is due to commence this week and it is hoped the well will be back onstream within the next 2 weeks. Once WF-7 is back onstream, it is expected that Group production should be approximately 300bopd with further upside expected following installation of the jet pump on WF-9 and well stimulation work at Crosby Warren.

Crosby Warren

Engineering studies are complete on the question of undertaking a new hydraulic frac stimulation of the CW-1 reservoir. The study has shown that the historical frac has become ineffective over time. Consequently, a repeat frac stimulation presents an opportunity to significantly increase field production. The original frac was highly successful and led to a 15 fold increase in production rate. It is hoped that this work can be carried out in the next 2-4 months.

Discussions are ongoing with regard to the acquisition of a new 3D seismic survey jointly with neighbouring licence holders later this year which would lead to a much more robust subsurface model for both the Crosby Warren field and the Company's nearby Wressle exploration prospect.

Barchiz

Barchiz-1, drilled late last year, recovered oil on DST from a shallow sandstone reservoir with approximately 35 feet of net pay. The main exploration target of the well was not reached due to technical constraints. Following partner meetings last week, Europa has declared an intention to deepen the Barchiz-1 well to the primary objective as a sole-risk operation, subject to financing. The Operator proposed acquiring further seismic data along trend from Barchiz to identify a new exploration well location in the play. However, the Directors' view is that this an opportunity to test whether the Oligocene reservoir is present beneath the current well TD, a concept supported by nearby well control.

The joint venture group has applied for a licence extension in order to pursue the remaining undrilled prospectivity on the licence and the associated work programme is currently being agreed with the authorities. Barchiz-1 sidetrack is expected to be drilled in the second half of 2011.

Berenx

Planning the appraisal of this potentially multi-TCF gas project has taken a step forward with the completion of 3D seismic reprocessing by CGG, which has greatly improved the seismic image. NRG, the Aberdeen-based well engineering company, have been retained to undertake detailed well engineering for the planned Berenx-3 appraisal well.

In the meantime and following the success of the CGG work, further 3D seismic data is planned for later this year. This survey, which could be acquired in Q4 2011, will quantify the western extent of the Berenx structure, which tested dry gas in the 1970's.

Acquiring this survey will fulfil the work commitment of the first phase of the permit and allow for automatic renewal in early 2012.

General

It should be noted that achieving optimum rates on the new West Firsby well will take some weeks and that, in conjunction with the earlier drilling delays this will generate full year (to 31 July 2011) projected revenue and profits below market expectations.

The Company is actively engaged in new venture activity, including current and near-term licensing rounds in its core area of NW and Continental Europe. The aim is to add significant high impact exploration acreage into the asset portfolio for drilling in 2012 onwards.

Paul Barrett, Managing Director, said `There has been significant progress in a number of value-enhancing projects and we look forward to a sustained newsflow from seismic, drilling and new venture activity through the coming 12 months. Production growth over the coming months is expected to support this activity'.

Further information:

Europa Oil & Gas

Paul Barrett / Phil Greenhalgh Tel: +44 1235 553 266

finnCap

Sarah Wharry / Henrik Persson, Corporate Finance Tel: +44 207 220 0567 Joanna Weaving, Corporate Broking Tel: +44 207 600 1658

EUROPA OIL & GAS (HOLDINGS) PLC
Date   Source Headline
4th Aug 20207:00 amPRNBoard Reorganisation and Grant of Options
3rd Aug 20207:00 amPRNWressle Development Update
20th Jul 20207:00 amPRNDirector Retirement and Corporate Update
11th Jun 20207:00 amPRNAcquisition of offshore Ireland licence
10th Jun 202011:30 amPRNHolding(s) in Company
13th May 20204:14 pmPRNWressle Development Update
24th Apr 20209:05 amRNSSecond Price Monitoring Extn
24th Apr 20209:00 amRNSPrice Monitoring Extension
15th Apr 20207:00 amPRNInterim Results
31st Mar 20207:00 amPRNCOVID-19 Update
18th Mar 20207:00 amPRNWressle Development Update
12th Mar 20207:00 amPRNBoard Changes
21st Feb 202011:38 amPRNHolding(s) in Company
5th Feb 20207:00 amPRNRelinquishment of Irish Licensing Option 16/19
23rd Jan 20207:00 amPRNIreland Farm-out Update
17th Jan 20203:25 pmPRNWressle Development Granted Planning Consent
11th Dec 20193:02 pmPRNResult of AGM
11th Dec 20197:00 amPRNAGM Statement
6th Dec 20197:00 amPRNNotice of AGM and Posting of Annual Report
21st Nov 20197:00 amPRNBoard Changes
8th Nov 20197:00 amPRNUpdate on Wressle Development Public Inquiry
4th Nov 20197:00 amPRNEuropa’s production unaffected by fracking moratorium
29th Oct 20197:00 amRNSAtlantic Ireland Conference & Farm-out Update
10th Oct 20197:00 amPRNFinal Results for the year to 31 July 2019
25th Sep 20197:00 amRNSStatement by Irish Offshore Operators' Association
24th Sep 20197:00 amPRNIrish UN Climate Action Speech
18th Sep 20197:00 amPRNAward of Large Exploration Licence, Offshore Morocco
23rd Aug 201912:03 pmPRNHolding(s) in Company
12th Aug 20197:00 amPRN12 month extension to FEL 2/13, Offshore Ireland
7th Aug 20197:00 amPRNAward of Frontier Exploration Licence, Offshore Ireland
29th Jul 20197:00 amPRNWressle Oil Field Planning Appeal Update
12th Jul 20196:10 pmPRNHolding(s) in Company - Replacement
12th Jul 20199:26 amPRNHolding(s) in Company
5th Jul 201912:57 pmRNSIrish Offshore Operators' Association Statement
1st Jul 20197:00 amRNSShareholder Letter
3rd Jun 20194:41 pmRNSSecond Price Monitoring Extn
3rd Jun 20194:35 pmRNSPrice Monitoring Extension
3rd Jun 20197:00 amPRNCompletion of Sale of Interest in UK Licence
29th Apr 20197:00 amPRNWressle Planning Inquiry Date
16th Apr 20197:00 amPRNSale of interest in PEDL143, Weald Basin
12th Apr 20197:00 amPRNInterim Results
14th Mar 20197:00 amPRNTransfer of Operatorship of PEDL143 Licence
26th Feb 20197:00 amPRNNew Prospect Inventory for LO 16/20, Offshore Ireland
5th Feb 20197:00 amPRNWressle Planning Appeal
25th Jan 20197:00 amPRNExisting Planning Consent for Wressle Extended
14th Jan 20197:00 amRNSShareholder Letter
11th Dec 201810:18 amPRNHolding(s) in Company
10th Dec 20184:20 pmPRNHolding(s) in Company
10th Dec 20184:15 pmPRNDirector/PDMR Shareholding
7th Dec 20182:00 pmPRNTotal Voting Rights & Director/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.