Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEnquest Regulatory News (ENQ)

Share Price Information for Enquest (ENQ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 16.22
Bid: 16.24
Ask: 16.28
Change: 0.36 (2.27%)
Spread: 0.04 (0.246%)
Open: 16.60
High: 16.60
Low: 15.74
Prev. Close: 15.86
ENQ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kraken First Oil

26 Jun 2017 07:00

RNS Number : 0794J
EnQuest PLC
26 June 2017
 

 

ENQUEST PLC.

 

Kraken First Oil

26 June 2017

 

EnQuest confirms that first oil from the Kraken development was delivered on 23 June 2017. During the initial ramp-up period, the 13 wells that have been drilled and completed to date, comprising 7 producers and 6 injectors, are being brought online in a phased manner, to maximise long term productivity and value.

 

EnQuest CEO, Amjad Bseisu said:

"EnQuest is delighted to confirm that first oil has been achieved on the Kraken development, delivered on schedule and under budget. Drill centres 1 and 2 are fully complete and work continues on drill centre 3; as a result, further production capacity will come online into 2018 as these further wells are put onstream.

 

Kraken is a transformational project, made possible by EnQuest's differential capabilities; the right mix of integrated technical capabilities, high levels of efficiency and cost discipline. With production from Kraken, EnQuest is moving from a period of heavy capital investment, to a focus on cash generation and deleveraging the balance sheet.

A further update and additional analysis will be provided with EnQuest's 2017 half year results."

 

EnQuest's Head of Major Projects, Richard Hall said:

"The achievement of producing first oil from Kraken on schedule and considerably under budget is a great testament to the capabilities of EnQuest. I am extremely proud of the EnQuest Kraken team for their dedication, vison and sheer hard work and thank them for this exceptional performance. Our approach of rigorous planning, simplification of specifications and clarity in execution methodology has enabled us successfully to deliver this highly complex project."

 

UK Business and Energy Secretary Greg Clark said:"This is a landmark project for EnQuest and the UK oil and gas sector as one of the largest new oil fields to come on-stream in the North Sea in a decade. This has been made possible through significant UK government support to encourage investments of this type in the North Sea, supporting thousands of highly-skilled jobs. We'll continue to build on this support for the oil and gas sector as it looks to seize the significant opportunities that lie ahead." 

UK Oil & Gas Authority Chief Executive, Dr Andy Samuel said: 

"As one of the most significant oil field projects in the UK Continental Shelf, successful production from Kraken is positive news for the whole basin. It has the potential to open up additional heavy oil opportunities in the Northern North Sea, with other developments in the pipeline. It's particularly pleasing to see a project delivered under budget, having clearly benefitted from a strong partnership between operator and key service providers."

 

Ends

For further information please contact:

 

EnQuest PLC Tel: +44 (0)20 7925 4900

Amjad Bseisu (Chief Executive)

Jonathan Swinney (Chief Financial Officer)

Michael Waring (Head of Communications & Investor Relations)

 

Tulchan Communications Tel: +44 (0)20 7353 4200

Martin Robinson

Martin Pengelley

 

Notes to editors

 

This announcement has been determined to contain inside information.

 

THE KRAKEN DEVELOPMENT: Facts and figures

Kraken is a large heavy oil accumulation in the UK North Sea, located in the East Shetland basin, to the west of the North Viking Graben, approximately 125 km east of the Shetland IslandsThe field contains c.128 MMboe of gross 2P reserves, making it one of the largest new oil fields to come onstream in the North Sea since Buzzard Gross peak oil production expected to be approximately 50,000 barrels of oil per dayThe gross capital costs of the development are currently estimated to be approximately $2.5 billion, down from $3.2 billion at the time the project was sanctioned; good planning and project execution including good progress on drilling and on the execution of the subsea programme were key factors in the capex savings. Drilling and formation evaluation have shown excellent correlation with pre-sanction subsurface expectationsEnQuest has an interest of 70.5% in Kraken, with its partner in the development Cairn Energy PLC having the balancing 29.5%Kraken is EnQuest's seventh operated production hubAt the time the development was sanctioned, using Oil and Gas UK's reporting metrics it was estimated that the development would support more than 20,000 UK jobs during the construction period of the project and an average of approximately 1,000 operational jobs in the UK for each year of the Kraken field's life of over 20 yearsThe Kraken FPSO vessel has the largest liquid handling capacity in the UKCSOther field details: Field area ~ 12 x 3.5 km: Water depth of c.110m

 

 

ENQUEST

EnQuest is one of the largest UK independent producers in the UK North Sea. EnQuest PLC trades on both the London Stock Exchange and the NASDAQ OMX Stockholm. Its operated assets include Thistle/Deveron, Heather/ Broom, the Dons area, the Greater Kittiwake Area, Scolty/Crathes and Alma/Galia, also the Kraken development; EnQuest also has an interest in the non-operated Alba producing oil field. At the end of December 2016, EnQuest had interests in 25 UK production licences, covering 35 blocks or part blocks and was the operator of 23 of these licences.

 

EnQuest believes that the UKCS represents a significant hydrocarbon basin, which continues to benefit from an extensive installed infrastructure base and skilled labour. EnQuest believes that its assets offer material organic growth opportunities, driven by exploitation of current infrastructure on the UKCS and the development of low risk near field opportunities.

 

EnQuest is replicating its model in the UKCS by targeting previously underdeveloped assets in a small number of other maturing regions; complementing its operations and utilising its deep skills in the UK North Sea. In which context, EnQuest has interests in Malaysia where its operated assets include the PM8/Seligi Production Sharing Contract and the Tanjong Baram Risk Services Contract.

 

Forward looking statements: This announcement may contain certain forward-looking statements with respect to EnQuest's expectation and plans, strategy, management's objectives, future performance, production, reserves, costs, revenues and other trend information. These statements and forecasts involve risk and uncertainty because they relate to events and depend upon circumstances that may occur in the future. There are a number of factors which could cause actual results or developments to differ materially from those expressed or implied by these forward looking statements and forecasts. The statements have been made with reference to forecast price changes, economic conditions and the current regulatory environment. Nothing in this presentation should be construed as a profit forecast. Past share performance cannot be relied on as a guide to future performance.

 

Glossary

 

DC Drill centre

ESP Electrical submersible pump

FPSO Floating production, storage and offloading vessel

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFMGZVVKVGNZM
Date   Source Headline
21st Apr 201610:15 amRNSHolding(s) in Company
19th Apr 20164:30 pmRNSEnQuest PLC Annual Report and Accounts Disclosure
14th Apr 20168:00 amRNSHolding(s) in Company
11th Apr 201610:26 amRNSHolding(s) in Company
17th Mar 20167:00 amRNSEnQuest PLC Preliminary Results
25th Feb 20166:14 pmRNSHolding(s) in Company
24th Feb 20168:52 amRNSDirectorate Change
22nd Feb 20167:00 amRNSAcquisition of additional interest in Kraken
2nd Feb 201612:07 pmRNSHolding(s) in Company
8th Jan 20161:27 pmRNSHolding(s) in Company
15th Dec 201512:09 pmRNSHolding(s) in Company
8th Dec 20157:00 amRNSOperations Update H2 2015
3rd Dec 20153:55 pmRNSHolding(s) in Company
27th Nov 20154:01 pmRNSHolding(s) in Company
28th Oct 20157:00 amRNSAlma/Galia first oil
8th Oct 20154:06 pmRNSHolding(s) in Company
2nd Sep 20154:29 pmRNSDirector/PDMR Shareholding
1st Sep 201512:50 pmRNSDirector/PDMR Shareholding
1st Sep 20157:04 amRNSEnQuest re: Aberdeen Office
21st Aug 20154:23 pmRNSDirector/PDMR Shareholding
20th Aug 20159:14 amRNSDirector/PDMR Shareholding
19th Aug 20157:00 amRNSEnQuest plc Interim Results Announcement
25th Jun 20157:00 amRNSDirectorate Change
29th May 20152:16 pmRNSHolding(s) in Company
27th May 20153:50 pmRNSResult of AGM
20th May 20154:25 pmRNSDirector/PDMR Shareholding
15th May 20157:00 amRNSENQUEST PLC, 15 MAY 2015. OPERATIONAL UPDATE
7th May 201510:30 amRNSHolding(s) in Company
5th May 20151:08 pmRNSResult of EnQuest plc's Noteholders meeting
1st May 20155:00 pmRNSDirector/PDMR Shareholding
23rd Apr 20154:48 pmRNSEnQuest PLC Annual Report and Accounts Disclosure
23rd Apr 201510:01 amRNSHolding(s) in Company
13th Apr 20154:55 pmRNSHolding(s) in Company
10th Apr 20157:00 amRNSEnquest PLC 5.5 per cent notes update
25th Mar 20158:45 amRNSHolding(s) in Company
23rd Mar 20156:03 pmRNSDirector/PDMR Shareholding
23rd Mar 20153:40 pmRNSDirector/PDMR Shareholding
23rd Mar 20153:30 pmRNSDirector/PDMR Shareholding
19th Mar 20154:07 pmRNSDirector/PDMR Shareholding
19th Mar 20157:00 amRNSENQUEST PLC, Results for the year ended 31 Dec 14
17th Mar 20153:15 pmRNSHolding(s) in Company
2nd Feb 20157:00 amRNSEnQuest exits Tunisia
23rd Jan 20157:00 amRNSEnquest PLC, Trading and Operations Update
24th Dec 201412:10 pmRNSDirector/PDMR Shareholding
16th Dec 201411:00 amRNSDirector/PDMR Shareholding
2nd Dec 20144:29 pmRNSDirector/PDMR Shareholding
28th Nov 20144:20 pmRNSDirector/PDMR Shareholding
25th Nov 20145:10 pmRNSDirector/PDMR Shareholding
21st Nov 201411:56 amRNSDirector/PDMR Shareholding
12th Nov 20147:00 amRNSInterim Management Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.