Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.235
Bid: 0.22
Ask: 0.25
Change: -0.01 (-4.08%)
Spread: 0.03 (13.636%)
Open: 0.245
High: 0.00
Low: 0.00
Prev. Close: 0.245
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update - Tambak -1 Well Spud

4 Nov 2019 08:00

RNS Number : 1200S
Empyrean Energy PLC
04 November 2019
 

This announcement contains inside information

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

 

4 November 2019

 

Empyrean Energy PLC ("Empyrean" or the "Company")

Duyung PSC, Operational Update - Tambak -1 Well Spud

 

Empyrean Energy Plc, the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide an operational update in relation to the upcoming drilling campaign in the Duyung PSC in the West Natuna basin, offshore Indonesia, in which Empyrean holds an 8.5% interest.

 

Following the successful appraisal at Tambak-2, the Asian Endeavour-1 jack up rig has been on location since Friday 1st November and drilling of the Tambak-1 well has commenced. The Tambak-1 well is located approximately 4.5 km north of the Mako South-1 location and is designed to both appraise the extent of the Mako gas field as well to test the underlying Tambak prospect. The well will be drilled as a vertical well and is prognosed to intersect the top of the intra-Muda reservoir at a depth of approximately 1,276 feet below sea level. The well will be deepened below the base Muda unconformity (at a depth of approximately 1,696 feet) to test the underlying Lower Gabus section.

 

The well is planned to total depth at approximately 4,500 feet below sea level.

 

Total time to drill, log and test in the event of success is estimated to be approximately 33 days, after which the well will be plugged and abandoned and the rig de-mobilised.

 

The gross cost of the two well programme is expected to be approximately $17MM-19MM to the PSC partners on a fully tested basis, including rig mobilisation and de-mobilisation, for which Coro Energy Plc ("Coro") is funding US$10.5MM. Empyrean will fund 8.5% of the additional drilling campaign costs over and above the Coro funding.

 

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 30 years' experience as a hydrocarbon geologist and geoscientist.

 

**ENDS**

 

For further information:

 

Empyrean Energy plc

 

Tom Kelly

Tel: +61 8 9380 9920

 

 

 

 

Cenkos Securities plc

 

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

 

 

 

 

St Brides Partners Ltd

 

Priit Piip

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

Tel: +44 (0) 20 7236 1177

 

The Mako Gas Field, Duyung PSC, Offshore Indonesia

 

The Mako gas field is an extremely large, shallow structural closure, with an area extent of over 350 square km. The reservoir is a Pliocene-age sandstone, with a gas-water contact at approximately 391m true vertical depth sub-sea. The field has excellent seismic definition with direct hydrocarbon indicators being very evident.

 

Having been drilled but not tested by prior operators of the acreage, the commercial viability of the Mako gas field was demonstrated by the Mako South-1 well drilled by Empyrean and its partner and operator, Conrad Petroleum Limited in 2017. The well was drilled to core and test the Mako reservoir, flowing up to 10.8 MMscf/d of dry gas on test. Overall four wells have penetrated the reservoir section, and while further appraisal is planned given the huge areal extent of the field, the reservoir distribution is reasonably well understood.

 

The Mako field is located in the prolific West Natuna basin, approximately 16 km from the WNTS pipeline system which delivers gas from Indonesia to Singapore. A plan of development has recently been approved by Indonesian authorities and initial gas marketing discussions have commenced, with a gas buyer in Singapore for the Mako gas. An independent report on the field's potential was recently carried out by Gaffney Cline & Associates, giving a 2C recoverable resource assessment of 276 Bcf and 392 Bcf of 3C recoverable resources.

 

Near Field Exploration Potential, To Be Tested in 2019

 

A series of prospects both beneath and above the Mako field have been mapped. Of particular note is the Tambak (formerly 'Mako Deep') prospect, a Lower Gabus structure that sits beneath the northern end of the Mako field. The target interval within Tambak exhibits seismic amplitude brightening, conformable with structural closure. The prospect has a prospective resource range of 200 to 300 Bcf with a mid-case 250 Bcf and a CoS of 45%.

 

At the southern end of the field, over the structure's crest, sits the Mako Shallow prospect. This again shows a very strong direct hydrocarbon indicators on seismic, conformable with closure in shallow Muda sandstones. The Shallow Muda prospect has potential to add a further 100 Bcf of recoverable resources and a very high CoS of 75%.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBIBRTMBIMMTL
Date   Source Headline
20th Aug 20107:15 amRNSRiverbend Project Update
13th Aug 20107:45 amRNSSugarloaf Project Block B Update
13th Aug 20107:41 amRNSBulletin Board investigation
5th Aug 20107:41 amRNSSugarloaf Project Block B Update
15th Jul 20107:43 amRNSSugarloaf Project Block B Update
6th Jul 20107:58 amRNSSugarloaf Project Block B Update
2nd Jul 20107:55 amRNSSugarloaf Project Block B Update
28th Jun 201012:11 pmRNSDirector/PDMR Shareholding
23rd Jun 201010:16 amRNSResult of AGM
17th Jun 20107:58 amRNSHercules Prospect Update
8th Jun 20107:37 amRNSSugarloaf Project Block B Update
4th Jun 20107:00 amRNSSugarloaf Project Block B Update
1st Jun 20107:52 amRNSCartwright No.1 well spuds
28th May 201011:30 amRNSGrant of Options
28th May 20107:00 amRNSNotice of AGM
28th May 20107:00 amRNSFinal Results
21st May 20107:21 amRNSSugarloaf Project Block B Update
5th May 20107:20 amRNSSugarloaf Project Block B Update
4th May 20108:08 amRNSSugarloaf Project Block B Update
4th May 20108:05 amRNSGlantal Project
22nd Apr 20107:38 amRNSSugarloaf Project Block B Update
19th Apr 20107:58 amRNSSugarloaf Project Block B Update
14th Apr 20108:45 amRNSFurther Placing brings total raise to ?3.6 million
13th Apr 20107:42 amRNSSugarloaf Project Block B Update
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.