Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.075    0.0075 (11.11%)
Bid:
0.07
Ask:
0.08
Spread: 0.01 (14.286%)
Market Cap: £4.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Duyung PSC, Operational Update

24 Sep 2019 07:00

RNS Number : 3497N
Empyrean Energy PLC
24 September 2019
 

This announcement contains inside information

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

 

24 September 2019

 

Empyrean Energy PLC ("Empyrean" or the "Company")

Duyung PSC, Operational Update

 

Empyrean Energy Plc, the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide an operational update in relation to the upcoming drilling campaign at the Duyung PSC in the West Natuna basin, offshore Indonesia, in which Empyrean holds an 8.5% interest.

 

Empyrean has been advised that the Asian Endeavour-1 jack up rig, owned by China Oilfield Services Limited ("COSL"), has mobilised from Singapore and is now en-route to the location for the first well in the drilling campaign. Drilling operations are expected to commence on time and a further announcement will be made when rigging up is complete and drilling operations commence.

 

The campaign will comprise of two wells, an appraisal well designed to primarily appraise the intra-Muda sandstone reservoir (Mako gas field discovery) in the southern area of the Mako field and an exploration well designed to test the Tambak prospect beneath the central area of the Mako gas field, after appraising the Mako gas field at that location. For further information on the drilling campaign, refer to the announcement made on 19 August 2019.

 

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 29 years' experience as a hydrocarbon geologist and geoscientist.

 

**ENDS**

 

For further information:

 

Empyrean Energy plc

 

Tom Kelly

Tel: +61 8 9380 9920

 

 

 

 

Cenkos Securities plc

 

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

 

 

 

 

St Brides Partners Ltd

 

Priit Piip

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

Tel: +44 (0) 20 7236 1177

 

The Mako Gas Field, Duyung PSC, Offshore Indonesia

 

The Mako gas field is an extremely large, shallow structural closure, with an area extent of over 350 square km. The reservoir is a Pliocene-age sandstone, with a gas-water contact at approximately 391m true vertical depth sub-sea. The field has excellent seismic definition with direct hydrocarbon indicators being very evident.

 

Having been drilled but not tested by prior operators of the acreage, the commercial viability of the Mako gas field was demonstrated by the Mako South-1 well drilled by Empyrean and its partner and operator, Conrad Petroleum Limited in 2017. The well was drilled to core and test the Mako reservoir, flowing up to 10.8 MMscf/d of dry gas on test. Overall four wells have penetrated the reservoir section, and while further appraisal is planned given the huge areal extent of the field, the reservoir distribution is reasonably well understood.

 

The Mako field is located in the prolific West Natuna basin, approximately 16 km from the WNTS pipeline system which delivers gas from Indonesia to Singapore. A plan of development has recently been approved by Indonesian authorities and initial gas marketing discussions have commenced, with a gas buyer in Singapore for the Mako gas. An independent report on the field's potential was recently carried out by Gaffney Cline & Associates, giving a 2C recoverable resource assessment of 276 Bcf and 392 Bcf of 3C recoverable resources.

 

Near Field Exploration Potential, To Be Tested in 2019

 

A series of prospects both beneath and above the Mako field have been mapped. Of particular note is the Tambak (formerly 'Mako Deep') prospect, a Lower Gabus structure that sits beneath the northern end of the Mako field. The target interval within Tambak exhibits seismic amplitude brightening, conformable with structural closure. The prospect has a prospective resource range of 200 to 300 Bcf with a mid-case 250 Bcf and a CoS of 45%.

 

At the southern end of the field, over the structure's crest, sits the Mako Shallow prospect. This again shows a very strong direct hydrocarbon indicators on seismic, conformable with closure in shallow Muda sandstones. The Shallow Muda prospect has potential to add a further 100 Bcf of recoverable resources and a very high CoS of 75%.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDEASNDAFDNEFF
Date   Source Headline
10th Feb 201112:27 pmRNSUpdate - Riverbend Project, onshore Texas, USA
20th Jan 20117:00 amRNSSugarloaf Update
23rd Dec 20107:00 amRNSHalf Yearly Report
20th Dec 20107:25 amRNSSugarloaf Project Operations Update
10th Dec 201011:01 amRNSSugarloaf Project Operations and Production Update
29th Nov 20107:00 amRNSSugarloaf Project, ("Sugarloaf"), Block B, Texas
23rd Nov 20107:27 amRNSSugarloaf Project ("Sugarloaf") Block B, Texas USA
18th Nov 20109:01 amRNSDraw down of Convertible Loan Facility
18th Nov 20107:00 amRNSChange of Adviser
9th Nov 20107:39 amRNSHercules Prospect, onshore Texas
5th Nov 20107:30 amRNSRiverbend Project, onshore Texas
3rd Nov 20107:00 amRNSNominated adviser and broker change of name
28th Oct 20101:09 pmRNSHolding(s) in Company
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
14th Oct 20107:41 amRNSSugarloaf Project Block B Update
23rd Sep 20107:24 amRNSSugarloaf Project Block B Update
13th Sep 20109:16 amRNSHolding(s) in Company
13th Sep 20107:29 amRNSRiverbend Project Update
8th Sep 20107:00 amRNSSugarloaf Project Block B Update
6th Sep 20107:05 amRNSHercules Prospect, BP America Well Update
20th Aug 20107:15 amRNSRiverbend Project Update
13th Aug 20107:45 amRNSSugarloaf Project Block B Update
13th Aug 20107:41 amRNSBulletin Board investigation
5th Aug 20107:41 amRNSSugarloaf Project Block B Update
15th Jul 20107:43 amRNSSugarloaf Project Block B Update
6th Jul 20107:58 amRNSSugarloaf Project Block B Update
2nd Jul 20107:55 amRNSSugarloaf Project Block B Update
28th Jun 201012:11 pmRNSDirector/PDMR Shareholding
23rd Jun 201010:16 amRNSResult of AGM
17th Jun 20107:58 amRNSHercules Prospect Update
8th Jun 20107:37 amRNSSugarloaf Project Block B Update
4th Jun 20107:00 amRNSSugarloaf Project Block B Update
1st Jun 20107:52 amRNSCartwright No.1 well spuds
28th May 201011:30 amRNSGrant of Options
28th May 20107:00 amRNSNotice of AGM
28th May 20107:00 amRNSFinal Results
21st May 20107:21 amRNSSugarloaf Project Block B Update
5th May 20107:20 amRNSSugarloaf Project Block B Update
4th May 20108:08 amRNSSugarloaf Project Block B Update
4th May 20108:05 amRNSGlantal Project
22nd Apr 20107:38 amRNSSugarloaf Project Block B Update
19th Apr 20107:58 amRNSSugarloaf Project Block B Update
14th Apr 20108:45 amRNSFurther Placing brings total raise to ?3.6 million

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.