Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.06    -0.004 (-6.25%)
Bid:
0.055
Ask:
0.065
Spread: 0.01 (18.182%)
Market Cap: £3.43m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Duyung PSC, Operational Update

25 Oct 2019 07:15

RNS Number : 1404R
Empyrean Energy PLC
25 October 2019
Β 

This announcement contains inside information

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

Β 

25 October 2019

Β 

Empyrean Energy PLC ("Empyrean" or the "Company")

Duyung PSC, Operational Update

Β 

Empyrean Energy Plc, the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide an operational update in relation to the drilling campaign in the Duyung PSC in the West Natuna basin, offshore Indonesia, in which Empyrean holds an 8.5% interest.

Β 

Empyrean has been advised by the operator, Conrad Petroleum Limited ("Conrad"), that following the Tambak-2 well successfully reaching a total depth of 1,650 feet on 15 October 2019, the top of the targeted Intra-Muda reservoir depth came in as prognosed approximately 10 feet up-dip to Conrad's Mako South-1 gas discovery well over 13.5 km away.

Β 

A full logging suite was acquired, including formation pressure measurements, confirming a 33 feet gross gas pay zone (30 feet net) with formation permeabilities calculated to be over 1 Darcy across the best quality zone. The pressures and gas-water contact depth in Tambak-2 are the same as those encountered in Mako South-1, confirming a very large "single-tank" or areal extent of the Mako gas field.

Β 

While preparing for a Drill Stem Test ("DST") across the intra-Muda reservoir, an inflatable open hole bridge plug ("packer"), used to isolate the gas-bearing reservoir for testing, failed. During operations to recover the packer, the well started flowing natural gas to surface. For safety reasons, the well was immediately shut in. Subsequently, utilizing the appropriate well control practices, the well was killed using heavy mud containing barite. A significant quantity of the heavy mud was lost in the highly permeable Intra-Muda reservoir. Following this operation, the well was conditioned, and the DST equipment set-in place into the wellbore. Two separate DST attempts failed to flow gas to the surface due to the heavy formation damage from the kill mud.

Β 

Miltos Xynogalas, Conrad Executive Director/CEO, commented: "The Tambak-2 well is an appraisal well of the Mako gas field accumulation located a significant distance from the Mako South-1 gas discovery and has delivered a result better than our pre-drill expectation. The result is likely to have a positive impact on Mako's gas-in-place and potentially recoverable volumes. Uncertainty in these parameters has been greatly reduced. The well confirmed the lateral extent of the high-quality reservoir and the presence of a continuous hydrocarbon accumulation. Initial petrophysical analysis suggests high gas saturations, while the gas mobility encountered during pressure measurements and the flow of gas while retrieving the packer confirms the ability of the hydrocarbons to flow to the surface. While the unsuccessful DST caused by the formation damage is disappointing, the well results are extremely encouraging for the development of the Mako gas field. Petrophysical analysis suggests any DST testing would have yielded similar high flow rates to the discovery well."

Tom Kelly, Empyrean CEO commented: "A valid flow test at Tambak-2 without kill mud being required due to the packer failure would have been desirable given the excellent quality reservoir seen on logs and the 33 feet of net gas pay. The logs confirm an excellent quality reservoir at an approximate 13.5km step out from Mako-South 1. This achievement alone is expected to have a positive bearing on resources and potential reserves. We now move on to Tambak-1 which in addition to appraising the intra-Muda sands of the Mako gas discovery, will also test the deeper lower Gabus target".

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 30 years' experience as a hydrocarbon geologist and geoscientist.

Β 

**ENDS**

Β 

For further information:

Β 

Empyrean Energy plc

Tom Kelly

Tel: +61 8 9380 9920

Cenkos Securities plc

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0)Β 131 220 9772

St Brides Partners Ltd

Priit Piip

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

Tel: +44 (0) 20 7236 1177

Β 

The Mako Gas Field, Duyung PSC, Offshore Indonesia

Β 

The Mako gas field is an extremely large, shallow structural closure, with an area extent of over 350 square km. The reservoir is a Pliocene-age sandstone, with a gas-water contact at approximately 391m true vertical depth sub-sea. The field has excellent seismic definition with direct hydrocarbon indicators being very evident.

Β 

Having been drilled but not tested by prior operators of the acreage, the commercial viability of the Mako gas field was demonstrated by the Mako South-1 well drilled by Empyrean and its partner and operator, Conrad Petroleum Limited in 2017. The well was drilled to core and test the Mako reservoir, flowing up to 10.8 MMscf/d of dry gas on test. Overall four wells have penetrated the reservoir section, and while further appraisal is planned given the huge areal extent of the field, the reservoir distribution is reasonably well understood.

Β 

The Mako field is located in the prolific West Natuna basin, approximately 16 km from the WNTS pipeline system which delivers gas from Indonesia to Singapore. A plan of development has recently been approved by Indonesian authorities and initial gas marketing discussions have commenced, with a gas buyer in Singapore for the Mako gas. An independent report on the field's potential was recently carried out by Gaffney Cline & Associates, giving a 2C recoverable resource assessment of 276 Bcf and 392 Bcf of 3C recoverable resources.

Β 

Near Field Exploration Potential, To Be Tested in 2019

Β 

A series of prospects both beneath and above the Mako field have been mapped. Of particular note is the Tambak (formerly 'Mako Deep') prospect, a Lower Gabus structure that sits beneath the northern end of the Mako field. The target interval within Tambak exhibits seismic amplitude brightening, conformable with structural closure. The prospect has a prospective resource range of 200 to 300 Bcf with a mid-case 250 Bcf and a CoS of 45%.

Β 

At the southern end of the field, over the structure's crest, sits the Mako Shallow prospect. This again shows a very strong direct hydrocarbon indicators on seismic, conformable with closure in shallow Muda sandstones. The Shallow Muda prospect has potential to add a further 100 Bcf of recoverable resources and a very high CoS of 75%.

Β 

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
Β 
END
Β 
Β 
UPDEAKESAFANFEF
Date   Source Headline
17th Jan 20187:00 amRNSProduction & Sales from Dempsey Well Commences
13th Dec 20177:14 amRNSDirector Retirement
12th Dec 20173:15 pmRNSInterim Results
11th Dec 20179:46 amRNSDempsey and Sacramento Basin Q&A report
8th Dec 20177:57 amRNSDempsey 1-15 well production update
4th Dec 20177:38 amRNSDempsey Gas well update
14th Nov 20177:28 amRNSDempsey Gas Well Update
1st Nov 20177:12 amRNSDempsey Gas Well Update
4th Oct 20177:00 amRNSDempsey Gas Well Update
28th Sep 201712:26 pmRNSNew Company Website
18th Sep 20177:45 amRNSDempsey Gas Well to Flow Test Multiple Zones
13th Sep 20177:23 amRNSFurther Significant Gas Shows at Dempsey
12th Sep 201710:00 amRNSHolding(s) in Company
11th Sep 20171:03 pmRNSResults of AGM
11th Sep 201710:08 amRNSCorporate Presentation
8th Sep 20177:29 amRNSSignificant Gas Shows at Dempsey 1-15 Well
7th Sep 20177:00 amRNSSeismic Data Results Exceed Expectations
4th Sep 20177:26 amRNSSignificant Gas Shows Continue at Dempsey
1st Sep 20177:11 amRNSHolding(s) in Company
31st Aug 20177:22 amRNSSignificant Gas Shows Continue at Dempsey
30th Aug 20178:21 amRNSSignificant Gas Shows in reservoir at Dempsey
29th Aug 20177:00 amRNSSignificant Gas Shows
23rd Aug 20177:25 amRNS3D survey Completed in Block 29/11 Offshore China
21st Aug 20177:51 amRNSDempsey 1-15 Natural Gas Well Drilling Update
18th Aug 201710:17 amRNSPosting of Annual Report and Notice of AGM
15th Aug 20171:30 pmRNSFinal Results
14th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
9th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
3rd Aug 20177:37 amRNS1Tcf+ Dempsey Natural Gas Well Drilling Ahead
2nd Aug 20173:30 pmRNSRaises £1,000,000 before costs at 8.5p per share
1st Aug 20178:01 amRNSDrilling to commence at Dempsey Well, California
20th Jul 20177:47 amRNSOperations Update for 1+ Tcf Dempsey Gas Well
10th Jul 20177:02 amRNSDrilling Contract Signed for 1Tcf+ Dempsey Well
6th Jul 20177:10 amRNSDrilling Permit Granted for 1Tcf+ Dempsey Well
5th Jul 20178:09 amRNSCompletion of Mako Well and Stabilised Flow Rates
28th Jun 20177:38 amRNSMako South-1 Gas Flow Test Results
26th Jun 20177:48 amRNSMako South-1 Well Drilling and Testing Update
21st Jun 20177:53 amRNSIncreased interest in Sacramento Basin Projects
20th Jun 20175:31 pmRNSEmpyrean raises £660,000
19th Jun 201711:15 amRNSHolding(s) in Company
19th Jun 20178:17 amRNSMako South-1 Well Drilling Update
16th Jun 20177:45 amRNSProjects Update
15th Jun 20179:11 amRNSOperational Presentation
15th Jun 20178:00 amRNSHolding(s) in Company
14th Jun 20179:16 amRNSAppointment of Board Director
13th Jun 201711:10 amRNSPlacing and Option Exercise to Advance Portfolio
13th Jun 201710:00 amRNSOption Amendment
8th Jun 201711:00 amRNS3D Survey Commences on Block 29/11, China
30th May 201712:30 pmRNSProjects Update
15th May 20171:43 pmRNSMulti Project Farm-In, Sacramento Basin,California

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.