Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.47
Bid: 0.44
Ask: 0.50
Change: 0.025 (5.62%)
Spread: 0.06 (13.636%)
Open: 0.445
High: 0.00
Low: 0.00
Prev. Close: 0.47
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Duyung PSC, Operational Update

25 Oct 2019 07:15

RNS Number : 1404R
Empyrean Energy PLC
25 October 2019
 

This announcement contains inside information

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

 

25 October 2019

 

Empyrean Energy PLC ("Empyrean" or the "Company")

Duyung PSC, Operational Update

 

Empyrean Energy Plc, the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide an operational update in relation to the drilling campaign in the Duyung PSC in the West Natuna basin, offshore Indonesia, in which Empyrean holds an 8.5% interest.

 

Empyrean has been advised by the operator, Conrad Petroleum Limited ("Conrad"), that following the Tambak-2 well successfully reaching a total depth of 1,650 feet on 15 October 2019, the top of the targeted Intra-Muda reservoir depth came in as prognosed approximately 10 feet up-dip to Conrad's Mako South-1 gas discovery well over 13.5 km away.

 

A full logging suite was acquired, including formation pressure measurements, confirming a 33 feet gross gas pay zone (30 feet net) with formation permeabilities calculated to be over 1 Darcy across the best quality zone. The pressures and gas-water contact depth in Tambak-2 are the same as those encountered in Mako South-1, confirming a very large "single-tank" or areal extent of the Mako gas field.

 

While preparing for a Drill Stem Test ("DST") across the intra-Muda reservoir, an inflatable open hole bridge plug ("packer"), used to isolate the gas-bearing reservoir for testing, failed. During operations to recover the packer, the well started flowing natural gas to surface. For safety reasons, the well was immediately shut in. Subsequently, utilizing the appropriate well control practices, the well was killed using heavy mud containing barite. A significant quantity of the heavy mud was lost in the highly permeable Intra-Muda reservoir. Following this operation, the well was conditioned, and the DST equipment set-in place into the wellbore. Two separate DST attempts failed to flow gas to the surface due to the heavy formation damage from the kill mud.

 

Miltos Xynogalas, Conrad Executive Director/CEO, commented: "The Tambak-2 well is an appraisal well of the Mako gas field accumulation located a significant distance from the Mako South-1 gas discovery and has delivered a result better than our pre-drill expectation. The result is likely to have a positive impact on Mako's gas-in-place and potentially recoverable volumes. Uncertainty in these parameters has been greatly reduced. The well confirmed the lateral extent of the high-quality reservoir and the presence of a continuous hydrocarbon accumulation. Initial petrophysical analysis suggests high gas saturations, while the gas mobility encountered during pressure measurements and the flow of gas while retrieving the packer confirms the ability of the hydrocarbons to flow to the surface. While the unsuccessful DST caused by the formation damage is disappointing, the well results are extremely encouraging for the development of the Mako gas field. Petrophysical analysis suggests any DST testing would have yielded similar high flow rates to the discovery well."

Tom Kelly, Empyrean CEO commented: "A valid flow test at Tambak-2 without kill mud being required due to the packer failure would have been desirable given the excellent quality reservoir seen on logs and the 33 feet of net gas pay. The logs confirm an excellent quality reservoir at an approximate 13.5km step out from Mako-South 1. This achievement alone is expected to have a positive bearing on resources and potential reserves. We now move on to Tambak-1 which in addition to appraising the intra-Muda sands of the Mako gas discovery, will also test the deeper lower Gabus target".

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 30 years' experience as a hydrocarbon geologist and geoscientist.

 

**ENDS**

 

For further information:

 

Empyrean Energy plc

Tom Kelly

Tel: +61 8 9380 9920

Cenkos Securities plc

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

St Brides Partners Ltd

Priit Piip

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

Tel: +44 (0) 20 7236 1177

 

The Mako Gas Field, Duyung PSC, Offshore Indonesia

 

The Mako gas field is an extremely large, shallow structural closure, with an area extent of over 350 square km. The reservoir is a Pliocene-age sandstone, with a gas-water contact at approximately 391m true vertical depth sub-sea. The field has excellent seismic definition with direct hydrocarbon indicators being very evident.

 

Having been drilled but not tested by prior operators of the acreage, the commercial viability of the Mako gas field was demonstrated by the Mako South-1 well drilled by Empyrean and its partner and operator, Conrad Petroleum Limited in 2017. The well was drilled to core and test the Mako reservoir, flowing up to 10.8 MMscf/d of dry gas on test. Overall four wells have penetrated the reservoir section, and while further appraisal is planned given the huge areal extent of the field, the reservoir distribution is reasonably well understood.

 

The Mako field is located in the prolific West Natuna basin, approximately 16 km from the WNTS pipeline system which delivers gas from Indonesia to Singapore. A plan of development has recently been approved by Indonesian authorities and initial gas marketing discussions have commenced, with a gas buyer in Singapore for the Mako gas. An independent report on the field's potential was recently carried out by Gaffney Cline & Associates, giving a 2C recoverable resource assessment of 276 Bcf and 392 Bcf of 3C recoverable resources.

 

Near Field Exploration Potential, To Be Tested in 2019

 

A series of prospects both beneath and above the Mako field have been mapped. Of particular note is the Tambak (formerly 'Mako Deep') prospect, a Lower Gabus structure that sits beneath the northern end of the Mako field. The target interval within Tambak exhibits seismic amplitude brightening, conformable with structural closure. The prospect has a prospective resource range of 200 to 300 Bcf with a mid-case 250 Bcf and a CoS of 45%.

 

At the southern end of the field, over the structure's crest, sits the Mako Shallow prospect. This again shows a very strong direct hydrocarbon indicators on seismic, conformable with closure in shallow Muda sandstones. The Shallow Muda prospect has potential to add a further 100 Bcf of recoverable resources and a very high CoS of 75%.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDEAKESAFANFEF
Date   Source Headline
16th Nov 20188:11 amRNSA £1 Million Placement
9th Nov 20187:30 amRNSIndependent Oil in-place Estimates for Block 29/11
4th Oct 20189:46 amRNSDirector/PDMR Shareholding
1st Oct 20188:40 amRNSPetroleum Contract for Block 29/11 signed
5th Sep 201812:20 pmRNSResult of Annual General Meeting
5th Sep 20189:38 amRNSCompany Presentation
5th Sep 20187:00 amRNSThird-party Independent STOIIP Audit, Block 29/11
30th Aug 20187:00 amRNSAlvares 1 Testing and Operations Update
13th Aug 20187:38 amRNSIRS Tax Refund
10th Aug 20187:00 amRNSPosting of Annual Report and Notice of AGM
6th Aug 20187:00 amRNSFinal Results
3rd Aug 20187:46 amRNSOperations Update from Mako Gas Discovery
17th Jul 20187:37 amRNSTax refunds totalling $1.3 million
18th Jun 20187:50 amRNSOil Migration Study Completed - Block 29/11
6th Jun 20187:00 amRNS31% Uplift in Prospective Resources in Block 29/11
23rd May 20187:00 amRNSCommercial gas flows at ~1,200 mcfpd from Dempsey
8th May 20187:00 amRNSCommercial Gas Flows From Dempsey
3rd May 20189:10 amRNSHoldings in Company
16th Apr 20187:25 amRNSDempsey Testing Update
12th Mar 20187:10 amRNSDempsey Testing Update
8th Mar 20187:15 amRNSDempsey Production Testing to Resume
20th Feb 20182:45 pmRNSExercise of Options
30th Jan 201810:45 amRNSGrant of Options and PDMR Notification
17th Jan 20187:00 amRNSProduction & Sales from Dempsey Well Commences
13th Dec 20177:14 amRNSDirector Retirement
12th Dec 20173:15 pmRNSInterim Results
11th Dec 20179:46 amRNSDempsey and Sacramento Basin Q&A report
8th Dec 20177:57 amRNSDempsey 1-15 well production update
4th Dec 20177:38 amRNSDempsey Gas well update
14th Nov 20177:28 amRNSDempsey Gas Well Update
1st Nov 20177:12 amRNSDempsey Gas Well Update
4th Oct 20177:00 amRNSDempsey Gas Well Update
28th Sep 201712:26 pmRNSNew Company Website
18th Sep 20177:45 amRNSDempsey Gas Well to Flow Test Multiple Zones
13th Sep 20177:23 amRNSFurther Significant Gas Shows at Dempsey
12th Sep 201710:00 amRNSHolding(s) in Company
11th Sep 20171:03 pmRNSResults of AGM
11th Sep 201710:08 amRNSCorporate Presentation
8th Sep 20177:29 amRNSSignificant Gas Shows at Dempsey 1-15 Well
7th Sep 20177:00 amRNSSeismic Data Results Exceed Expectations
4th Sep 20177:26 amRNSSignificant Gas Shows Continue at Dempsey
1st Sep 20177:11 amRNSHolding(s) in Company
31st Aug 20177:22 amRNSSignificant Gas Shows Continue at Dempsey
30th Aug 20178:21 amRNSSignificant Gas Shows in reservoir at Dempsey
29th Aug 20177:00 amRNSSignificant Gas Shows
23rd Aug 20177:25 amRNS3D survey Completed in Block 29/11 Offshore China
21st Aug 20177:51 amRNSDempsey 1-15 Natural Gas Well Drilling Update
18th Aug 201710:17 amRNSPosting of Annual Report and Notice of AGM
15th Aug 20171:30 pmRNSFinal Results
14th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.