Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

13 Apr 2006 09:57

Empyrean Energy PLC13 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update • Good oil shows encountered whilst drilling at Eagle North-1 in California, USA. • Oil encountered is in the target lower Mary Bellocchi oil sands. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA:Victoria Petroleum NL as operator for the Eagle North-1 horizontal well in theEagle Oil Pool Development Project in the San Joaquin Basin advises that at 2300hours Central Pacific Time 12 April 2006, the current operation at Eagle North-1horizontal well was drilling ahead at 4,272 metres (14,015 feet) measured depthafter encountering oil shows in the target lower Mary Bellochi oil sand. The operator has advised good oil shows for the drilling conditions were firstseen in drill cuttings at 4,255 metres (13,960 feet ) measured depth (4,152metres TVD KB) and continue to be present. The forward plan is to drill another 25 metres to 4,293 metres (14,085 feet) andthen pull out of the hole to run 4 1/2 inch casing. The well bore is currentlyat an angle of 87 degrees from the vertical. With the Kreyengagen Shale behind the 41/2 inch liner, the Gatchell target oilsands will be drilled with a normal pressured water based KCL-Clarizan mudminimising formation invasion and maximing the evaluation of the oil bearingpotential of the oil sand. Following setting of the intermediate 41/2 inch liner, a 3 3/4 inch horizontalwell bore will then be drilled over a distance of 320 metres to within 30 metresof the Mary Bellocchi-1 oil well. This horizontal well bore will then becompleted for production with a 2 7/8 inch slotted production liner. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This type of oil show is extremelyencouraging and we look forward to being able to provide a further update as ourcompletion operations progress." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PR Tel: +44 (0)207 429 6603 Mob: +44 (0)7974 982 512 Imran AhmadToby Howell HB-CorporateTel: +44(0)207 510 8600 Empyrean Energy plcTel : +44(0)207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.