Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

21 Nov 2005 11:36

Empyrean Energy PLC21 November 2005 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling update Glantal Gas Project Germany Mobilisation of the drilling rig and associated equipment to the Glantal-1 wellsite has commenced and "rig up" activities in preparation for the spud in of theGlantal-1 well will continue over the next several days. The drilling contractor has completed the conductor hole and installed andcemented 13" casing at 20 metres. The drilling contractor will now prepare forthe "spud in" of the 121/4" hole below the conductor pipe. The Glantal-1 well is targeting reservoirs, estimated by the independent expertto have the potential to contain recoverable reserves of between 1.2 and 6.2trillion cubic feet of natural gas. The Glantal-1 well is designed to test theseal quality of overlying sediments and determine whether natural gas has beeneffectively trapped in economic quantities. Eagle Oil Pool Development Project, San Joaquin Basin, California, USA Victoria Petroleum NL ("Vicpet"; ASX Ticker : (VPE)), the operator of the EagleOil Pool Development Project has advised that the rig contracted to drill theEagle North-1 well is expected to arrive on location in late December 2005 foranticipated drilling to commence late December 2005 or early January 2006. Empyrean's independent consultant has estimated a P10 potential of up to 22.7million barrels of recoverable oil and 22.7 billion cubic feet of associatedgas, as compared to Vicpet (and other participants in the Eagle Oil PoolDevelopment Project) who have estimated the P10 potential reserve estimate forthe Eagle Oil Pool Development Project at up to a recoverable 34 million barrelsof oil and 58 billion cubic feet of gas. It must be noted that both of the above reserve estimates are interpretations ofdata and there are subjective assumptions made in the calculations. Empyrean'sconsultant has been more conservative. Successful drilling and testing willprovide the participants with more accurate potential reserve figures. It is anticipated that due to the requirements of the ASX Vicpet, as theoperator, and the other participants will be announcing daily drilling reports.As Empyrean is governed by the AIM Rules and not the ASX, it is not Empyrean'sintention to make daily announcements during the drilling campaign but rather toannounce all matters of a material nature, as stipulated by the AIM Rules. Empyrean will make further announcements when the definitive dates forcommencement of drilling are known for both Glantal-1 and the Eagle Oil PoolDevelopment Project. Chris LambertEmpyrean Energy plcTel: +44 (0) 207 932 2442 Laurence Read/Amanda HarrisConduit PR Tel : +44(0) 207 618 8760Mob: +44 (0) 7979 955 923 David NewtonHB CorporateTel: +44 (0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jun 20153:31 pmRNSHolding(s) in Company
21st May 20157:50 amRNSQ1 2015 Production Update from Sugarloaf AMI
27th Apr 201512:45 pmRNSHolding(s) in Company
8th Apr 201510:45 amRNSHedging contracts with Macquarie Bank Limited
1st Apr 20159:15 amRNSMacquarie Bank Facility Re-finance and drawdown
26th Mar 20158:00 amRNSQ4 2014 Production from Sugarloaf AMI, Texas
2nd Mar 20159:42 amRNSCorrection: Exercise of Options
2nd Mar 20159:15 amRNSExercise of Options
4th Feb 20159:53 amRNSForm 8.5 (EPT/NON-RI)
4th Feb 20157:50 amRNSUpdate on Strategic Review; Termination of FSP
30th Jan 20159:09 amRNSForm 8.5 (EPT/NON-RI)
28th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
27th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
26th Jan 20159:08 amRNSForm 8.5 (EPT/NON-RI)
23rd Jan 20151:27 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Jan 201510:11 amRNSForm 8.5 (EPT/NON-RI)
22nd Jan 20159:47 amRNSForm 8.5 (EPT/NON-RI)
21st Jan 20159:15 amRNSForm 8.5 (EPT/NON-RI)
20th Jan 20159:37 amRNSForm 8.5 (EPT/NON-RI)
16th Jan 20151:52 pmRNSForm 8.3 - Empyrean Energy PLC
16th Jan 201511:54 amRNSForm 8.5 (EPT/NON-RI)
15th Jan 20159:45 amRNSForm 8.5 (EPT/NON-RI)
14th Jan 20156:29 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20155:27 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20154:47 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20159:26 amRNSForm 8.5 (EPT/NON-RI)
13th Jan 20159:56 amRNSForm 8.5 (EPT/NON-RI)
12th Jan 20155:19 pmRNSForm 8.3 - Empyrean Energy PLC
12th Jan 20159:28 amRNSForm 8.5 (EPT/NON-RI)
9th Jan 20159:49 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20153:49 pmRNSForm 8.3 - Empyrean Energy PLC
8th Jan 20159:25 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20157:00 amRNSRepays USD 2m of Macquarie Facility
7th Jan 20159:13 amRNSForm 8.5 (EPT/NON-RI)
6th Jan 201510:10 amRNSForm 8.5 (EPT/NON-RI)
30th Dec 20147:40 amRNSInterim Results
23rd Dec 201412:33 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Dec 201410:07 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 201411:25 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 20147:00 amBUSForm 8.3 - Empyrean Energy plc
18th Dec 201410:32 amRNSForm 8.3 - Empyrean Energy PLC
17th Dec 201410:43 amRNSForm 8.5 (EPT/NON-RI)
15th Dec 201410:34 amRNSForm 8.5 (EPT/NON-RI)
12th Dec 20149:13 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 201410:00 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 20148:30 amRNSQ3 2014 Production from Sugarloaf AMI, Texas
10th Dec 201411:29 amRNSForm 8.5 (EPT/NON-RI)
9th Dec 201410:42 amRNSForm 8.3 - Empyrean Energy PLC
5th Dec 201412:16 pmRNSForm 8.3 - Empyrean Energy PLC
4th Dec 20148:35 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.