Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmerald Energy Regulatory News (EEN)

  • There is currently no data for EEN

Syria Update

27 Jul 2007 07:00

Emerald Energy PLC27 July 2007 Emerald Energy Plc27 July 2007 Khurbet East No.2 Well Results, Block 26, Syria Emerald Energy Plc ("Emerald" or the "Company") would like to provide thefollowing update on activities in Block 26, Syria. The Khurbet East No.2 appraisal well has reached a total depth of 2,050 metres.The well was drilled to appraise the Khurbet East No.1 discovery, locatedapproximately 1.2 kilometres to the southwest of Khurbet East No.2, and wasplanned to penetrate the Tertiary Chilou and Cretaceous Massive formations. The Cretaceous Massive formation was encountered at 1,931 metres. Wireline logsindicated a gross hydrocarbon interval of 49 metres and a net hydrocarboninterval of 29 metres. No clear oil/water contact was seen on the logs andtherefore the thickness of the oil interval may be greater than currentlyinterpreted. A formation pressure sampler confirmed the hydrocarbon gradientthat was encountered in the Massive formation in the Khurbet East No.1 well. Well testing operations were conducted over the upper 10 metres, approximately,of the Massive formation. During a 16 hour flow period, oil flowed to surfaceunder natural flow through a 32/64 inch choke at an average rate of 710 barrelsper day, increasing to a final rate of 820 barrels per day. The oil was ofapproximately 26 degrees API gravity with a gas-to-oil ratio of approximately 15standard cubic feet per barrel. The results of the testing operation indicatevery good formation permeability and it is believed that this production ratewould be materially enhanced with artificial lift methods. The Tertiary Chilou formation was encountered at 1,317 metres. The results of aformation pressure sampler indicated this formation to be mainly water bearingat this location and it is therefore considered unlikely to contain hydrocarbonin sufficient quantities to support commercial development. The Khurbet East No.2 well has been suspended, retaining the options of furthertesting or future production from this location, and the rig has beende-mobilised from the location. Further appraisal of the Khurbet East discovery will now continue with theacquisition of a 3D seismic survey over the structure, planned to commence inSeptember 2007. The results of this survey will be used to plan further welllocations. Emeralds' Chief Executive Officer, Angus MacAskill, said: "We are very pleased with the results of the Massive formation which encountereda thicker oil bearing interval than seen in Khurbet East No.1 and establishedexcellent well productivity, both of which exceeded expectation. We now lookforward to progressing appraisal and development activities" Emerald holds a 50% interest in Block 26 through its fully owned subsidiary SNGOverseas Ltd. Enquiries: Helen Manning 020 7925 2440 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
14th Jul 20097:00 amRNSUpdate
13th Jul 20092:32 pmRNSRule 8.3- Emerald Energy Plc
13th Jul 20097:00 amRNSStatement regarding recent share price movement
30th Jun 200910:57 amRNSTotal Voting Rights
23rd Jun 20097:00 amRNSWell update
17th Jun 20093:09 pmRNSHolding(s) in Company
16th Jun 20097:00 amRNSOperations Update - Syria, Block 26
9th Jun 200911:58 amRNSShare award
9th Jun 20097:00 amRNSOperations Update
8th Jun 20094:27 pmRNSHolding(s) in Company
8th Jun 20097:00 amRNSSyrian Presentation
4th Jun 200911:01 amRNSHolding(s) in Company
29th May 200911:10 amRNSTotal Voting Rights
27th May 20097:00 amRNSOperations Update - Syria, Block 26
7th May 20092:29 pmRNSTotal Voting Rights
6th May 20097:00 amRNSOperations Update
30th Apr 20097:00 amRNSOperations Update - Syria, Block 26
24th Apr 20093:50 pmRNSResult of EGM
24th Apr 20093:48 pmRNSResult of AGM
24th Apr 20097:00 amRNSInterim Management Statement
23rd Apr 20097:00 amRNSOperations Update
22nd Apr 200910:35 amRNSHolding(s) in Company
20th Apr 200912:35 pmRNSHolding(s) in Company
15th Apr 20094:12 pmRNSConversion of Convertible Bonds
8th Apr 200911:55 amRNSAnnual Information Update
24th Mar 20097:00 amRNSDrilling Report
18th Mar 20091:05 pmRNSRule 9 waiver
18th Mar 200912:55 pmRNSNotice of documents for Inspection
18th Mar 200912:52 pmRNSDirector/PDMR Shareholding
16th Mar 20097:00 amRNSFinal Results
6th Mar 20097:00 amRNSDrilling Update
4th Mar 200910:00 amRNSOperations update
2nd Mar 20098:53 amRNSBlock listing six monthly return
24th Feb 20097:00 amRNSOperations update
11th Feb 20097:00 amRNSColombia - Operations Update
29th Jan 20099:19 amRNSNew Licence
26th Jan 20097:00 amRNSOperations Update
21st Jan 20098:00 amRNSDrilling Update
15th Jan 20097:00 amRNSDrilling Report
22nd Dec 20087:00 amRNSDrilling Update: Gigante No.2 Well
18th Dec 20084:35 pmRNSPrice Monitoring Extension
26th Nov 20082:52 pmRNSDirectorate Change
25th Nov 20084:39 pmRNSPrice Monitoring Extension
19th Nov 20087:00 amRNSYousefieh No.1 Exploration Well Result, Block 26
11th Nov 200810:59 amRNSDrilling results correction
10th Nov 20087:00 amRNSCapella Number 2 Drilling Results
5th Nov 200810:25 amRNSDrilling Report - Correction
5th Nov 20087:50 amRNSDrilling Report
20th Oct 20087:00 amRNSInterim Management Statement
6th Oct 20087:21 amRNSDrilling Commences on Yousefieh-1 Exploration Well

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.