Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpire Metals Regulatory News (EEE)

Share Price Information for Empire Metals (EEE)

Share Price is delayed by 15 minutes
Get Live Data
34.20    0.10 (0.29%)
Bid:
33.40
Ask:
35.50
Spread: 2.10 (6.287%)
Market Cap: £252.25m
EEE Live PriceLast checked at - London Stock Exchange

Intraday Empire Metals Share Chart

Positive Mapping and Sampling Results at Walchen

7 Oct 2015 07:00

RNS Number : 4572B
Noricum Gold Limited
07 October 2015
 



Noricum Gold Limited / EPIC: NMG / Sector: Natural Resources

7 October 2015

Noricum Gold Limited ('Noricum Gold' or 'the Company')

Continued Positive Results from Mapping and Sampling, Walchen, Austria

 

Noricum Gold Limited, the European focused base and precious metals exploration and development company, is pleased to provide an update on its exploration activities at the Company's 100% owned Walchen VMS Deposit ('Walchen or the 'Project'), located in Austria.

 

Highlights

 

· Walchen's potential to host significant multi element mineralisation highlighted again through recent sampling of high grade dumps during a drill planning site visit:

o Rock samples returned grades of up to 2.25% copper ('Cu'), 0.8 g/t gold ('Au'), 94.9 g/t silver ('Ag'), 2.44% lead ('Pb') and 1.84% zinc ('Zn')

· Planning a drill programme to test the near surface mineralisation located in earlier mapping and sampling work this year

· Underground channel sampling of low-grade ore at Leopoldi drive in progress

· On-going exploration activities focused on outcrops and underground workings

· Low cost work programmes are being completed in tandem with activities in Georgia

 

Noricum Gold Managing Director Greg Kuenzel said, "Our work in Austria continues positively with a focus on the Walchen VMS deposit. Further multi-element mineralisation with solid grades have been received through sampling work undertaken in conjunction with our detailed mapping campaign, again reinforcing Walchen's potential, and therefore we are now planning for a first phase drill programme to test the near surface mineralisation.

 

"As our work in Georgia begins to pick up pace, we will continue to progress Walchen with a focus on the near surface outcropping mineralisation that was only recently uncovered by a new forestry road cutting. This road provides the perfect access for further exploration and will be utilised in the future drilling programme."

 

Sampling and Microscopy Programme

 

As part of an investigation of some accessible underground infrastructure, some dumps were sampled that contained ore mineralisation. All of the four samples taken had precious and base metal mineralisation of significance further reinforcing the merits of the Walchen area. The ore shown in the Leopoldi zone will be sampled in the near future. This was a lower grade zone that was not mined extensively in historical mining operations.

 

The table below shows the samples taken.

 

Sample no

Type

Cu (%)

Au (g/t)

Ag (g/t)

Pb (%)

Zn (%)

WAL-A1

Rock Sample

2.25

0.80

81.6

2.44

1.84

WAL-A2

Rock Sample

0.978

0.42

94.9

2.12

1.095

WAL-A3

Rock Sample

0.090

0.31

12.35

0.55

0.3840

WAL-B

Rock Sample

1.695

0.56

23.9

0.16

0.153

 

Some microscopy has also been completed on four mixed samples. The dominant sulphide in each of the samples was pyrite followed by chalcopyrite with associated sphalerite and galena, stannite and trace arsenopyrite and bismuth. Several different phases of sulphides were noted from different samples but as can be seen from the assay results all had significant mineralisation.

Walchen Overview

 

The volcanogenic massive sulphide (VMS) deposit of Walchen is located in the Eastern Alps, Styria Provence, central Austria. The deposit is 6km south-east of Oblarn, located in the Enns Valley and access is by sealed and then forestry roads. The nearest major town is Salzburg, 120km to the northwest.

 

The Walchen property hosts a previously producing mine, the data from which highlights the project's prospectivity. In consideration of this, the Company commenced an initial exploration programme in tandem with on-going review of the historic data.

 

It is unclear when mining initially started at Walchen, possibly in the 1200s, but later in 1434 an operational smelter was described in historical literature. Mining became increasingly important through the 17th and 18th centuries and in 1824 an annual production of 34kg of gold, 2550kg of silver and 406 tonnes of copper was reported. A short hiatus in mining was followed by intermittent production again between 1891 and 1958 when pyrite was mined to produce sulphuric acid.

 

The most recent mapping completed by Noricum has delineated three, north dipping, ore horizons. The southernmost mineralised horizon is well exposed laterally for 4km between the valley floor (835 masl) and 1550 masl. The northern mineralised horizon has less exposure at surface and can only be traced for 3km. The third horizon contains mainly carbonates and seems to be of less importance.

 

The ore minerals at Walchen are dominated by pyrite, with lesser amounts of the base metal sulphides chalcopyrite, galena and sphalerite. Pyrrhotite is present at deeper levels of the deposit. The average grade of the Walchen ore from 1942 was 1.71% Cu, 3.23% Zn, 2.48% Pb, 83g/t Ag, 0.5g/t Au. Recent assays have shown that pyrite and pyrrhotite can carry nickel and cobalt.

 

Historical exploration since the last cessation of mining has included an aerial geophysical survey utilising electromagnetic and radiometric methods was completed in 1980. The report detailing the survey mentions an anomaly at Walchen, and several other anomalies nearby, most are at relatively shallow depths.

 

The Company has published a Summary of Assays and Production Numbers from Historic Reports on its website. To view them, please go to www.noricumgold.com.

 

**ENDS**

 

For further information please visit www.noricumgold.com or contact:

 

Greg Kuenzel

Noricum Gold Limited

Company

Tel: 020 3326 1726

Ewan Leggat

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3470 0470

Elisabeth Cowell

St Brides Partners Ltd

PR

Tel: 020 7236 1177

Frank Buhagiar

St Brides Partners Ltd

PR

Tel: 020 7236 1177

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMFBLTMBJMBAA
Date   Source Headline
14th Mar 20254:31 pmRNSAdmission to Trading on OTCQB - Replacement
14th Mar 20257:00 amRNSAdmission to Trading on OTCQB in the United States
11th Mar 20257:00 amRNS-RNew Corporate Presentation
10th Mar 20257:00 amRNSHigh-Purity TiO2 Product Achieved
4th Mar 202512:29 pmRNSTR-1: Standard form for notification of holdings
27th Feb 20259:52 amRNS-RCORRECTION - Investor Presentation via IMC
27th Feb 20257:00 amRNS-RInvestor Presentation via Investor Meet Company
19th Feb 20257:00 amRNS-RInvestor Meet Company Spotlight Event
17th Feb 20257:00 amRNSMajor Drilling Campaign to Commence at Pitfield
13th Feb 20257:00 amRNSSignificant Progress Achieved on Process Flowsheet
4th Feb 20257:01 amRNS-RNew Corporate Presentation
29th Jan 20254:24 pmRNSExercise of Options
23rd Jan 20257:00 amRNSAppointment of Renowned Mining Executive to Board
10th Dec 20241:00 pmRNSHolding(s) in Company
9th Dec 20247:00 amRNSExceptional Testwork Results Achieved at Pitfield
7th Nov 20247:00 amRNSPitfield: Positive Drilling & Metallurgical Update
24th Oct 20247:00 amRNSDiamond Drilling at Pitfield Completed
30th Sep 20247:00 amRNSOversubscribed Placing to Raise £2.5 million
25th Sep 20247:00 amRNSEnvironmental Studies to Commence at Pitfield
18th Sep 20247:00 amRNSInterim Results
16th Sep 20247:00 amRNSNew Corporate Website and Branding
10th Sep 20247:00 amRNSDiamond Drilling to Commence at Pitfield Project
4th Sep 20247:00 amRNSPositive Results from Initial Processing Testwork
22nd Aug 20247:00 amRNSHigh Purity Anatase Confirmed Within Weathered Cap
12th Jun 20247:00 amRNSExploration Target for Pitfield Titanium Project
11th Jun 20247:01 amRNSFinal Results
11th Jun 20247:00 amRNSInvestor Events
5th Jun 20247:00 amRNSMajor New Titanium Dioxide Mineral Discovery
28th May 20247:00 amRNSResults from Pitfield Diamond Drilling Programme
15th May 20247:00 amRNSHigher Grade Mineralisation Identified
26th Apr 20247:00 amRNSStavely Project Update
25th Apr 20247:00 amRNSDrill Results Confirm Widespread High-Grade TiO2
18th Apr 20247:00 amRNSDrilling Successfully Completed at Pitfield
17th Apr 20247:00 amRNSPitfield Project JV to Include All Minerals
27th Mar 20247:00 amRNSPitfield Development Plan
13th Mar 20247:00 amRNSInvestor Presentation
5th Mar 202412:00 pmRNSUpdated Corporate Presentation
5th Mar 20247:00 amRNSFavourable Metallurgical Characteristics Confirmed
29th Feb 20247:00 amRNSDiamond Drilling to Commence & Grant of Options
23rd Feb 20247:00 amRNSRationalisation of Portfolio
6th Feb 20247:00 amRNSAppointment of Process Development Manager
5th Feb 20247:00 amRNSResource and Metallurgical Drilling to Commence
31st Jan 20247:00 amRNSHolding(s) in Company
29th Jan 20243:17 pmRNSDirector/PDMR Shareholding
22nd Jan 20247:01 amRNSExtensive, Shallow High-Grade Bedded Ti Confirmed
22nd Jan 20247:00 amRNSSaudi Strategic Investor Led Placing to Raise £3m
27th Dec 20232:40 pmRNSExercise of Options & Issue of Equity
19th Dec 20237:00 amRNSDrill Results: Additional High-Grade Titanium
8th Dec 20232:36 pmRNSExercise of Options & Issue of Equity
29th Nov 20233:32 pmRNSExercise of Warrants & Issue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.