Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpire Metals Regulatory News (EEE)

Share Price Information for Empire Metals (EEE)

Share Price is delayed by 15 minutes
Get Live Data
34.10    -1.20 (-3.40%)
Bid:
34.05
Ask:
34.50
Spread: 0.45 (1.322%)
Market Cap: £251.51m
EEE Live PriceLast checked at - London Stock Exchange

Intraday Empire Metals Share Chart

Exploration Update for the Eclipse Gold Project

16 May 2022 07:00

RNS Number : 5300L
Empire Metals Limited
16 May 2022
 

To view the announcement with the illustrative images please use the following link:

http://www.rns-pdf.londonstockexchange.com/rns/5300L_1-2022-5-15.pdf

 

Empire Metals Limited / AIM: EEE / Sector: Natural Resources

16 May 2022

Empire Metals Limited

('Empire' or the 'Company')

 

Exploration Update for the Eclipse Gold Project

Drilling Increases Strike Length with Five out of Six Drill Holes Intercepting Mineralisation

 

Empire Metals Limited, the AIM-quoted resource exploration and development company, is pleased to announce the assay results of the Diamond Drill ('DD') programme at the Eclipse Gold Project ('Eclipse'), in Western Australia. The DD programme, the second carried out by Empire at Eclipse, was designed to gather further geological and structural information on the mineralised shear and to test for lodes below the gold-depleted zone of weathering.

 

Highlights:

· The recent drilling has confirmed that the gold mineralisation associated with the NW-striking and steeply SW-dipping shear zone ('Eclipse shear') extends over a strike length of more than 500 metres, an increase in strike length of over 300 metres from the previously reported extent of mineralisation along the Eclipse shear.

· Six DD holes for a total of 999m were completed, focused mainly on demonstrating that the gold mineralisation persists at depth around the Eclipse shaft and Jack's Dream shaft, and to test for continuity along strike between Eclipse and Jack's Dream and to the north-west of Jack's Dream.

· Five of the six DD holes intercepted mineralisation within the Eclipse shear, with significant intercepts reported as follows:

Ø 0.54m @ 2.61g/t Au from 138.72m downhole at ECDD22_002

Ø 0.61m @ 1.63g/t Au from 164.69m downhole at ECDD22_003

Ø 0.33m @ 4.28g/t Au from 165.3m downhole at ECDD22_003

Ø 0.41m @ 2.16g/t Au from 78.79m downhole at ECDD22_005

Ø 0.48m @ 1.64g/t Au from 81.09m downhole at ECDD22_005

Ø 0.5m @ 1.78g/t Au from 121.15m downhole at ECDD22_006

Ø 0.4m @ 1.25g/t Au from 122.98m downhole at ECDD22_006

 

· It is noteworthy that ECDD22_003 and ECDD22_005 have proven the continuity of gold mineralisation to the north-west of the Eclipse shaft indicating the potential for Jack's Dream mineralisation to link directly to the Eclipse lode. Furthermore, ECDD22_006 has demonstrated that the mineralisation at Jack's Dream is open to the north-west. Both areas had been previously under-explored.

· The significant intercept at depth in ECDD22_002, which was drilled below the Eclipse shaft has demonstrated that the Eclipse lode remains open at depth.

· Importantly, the structural data obtained from all six DD holes, which is currently under assessment, will provide important geological and structural data which will allow Empire to update and improve the geological model at Eclipse.

 

Shaun Bunn, Managing Director, said: "We are pleased to report the success of this strategically important diamond drill programme, which has intercepted significant mineralised zones in areas previously under-explored. The geological and structural data being gathered from the analysis of the diamond core will greatly assist in the development of a robust geological model for Eclipse and will allow us to focus our exploration on higher-grade targets along the Eclipse shear.

 

"We now look forward to moving the focus of our drilling campaigns to the high-grade lodes recently identified at Homeward Bound and extensions to the Eclipse shear, north-west of Jack's Dream."

 

The Eclipse Gold Project

The Eclipse Gold Project is comprised of a single mining licence (M27/153). The licence is located approximately 55km NNE of Kalgoorlie (refer Figure 1). The historical Eclipse gold mine has had multiple owners since its discovery in 1902. In the period from April 1905 to November 1910, the Eclipse shaft was developed to a depth of 258 feet and produced 954 tonnes @ 24.6 g/t Au for 754.25 oz Au (source: GSWA Mindex database).

 

The recently acquired high-grade Gindalbie Gold Project (the granted area contained within mining licence M27/158) sits adjacent to the eastern border of the Eclipse licence area and extends the current area for exploration by 200%.

 

Figure 1. Location Map - Location of Eclipse Gold Project (red), which contains the old Gindalbie townsite, and mining lease ML 27/158 (blue) which contains the Gindalbie Gold Project.

 

Since commencing its involvement at Eclipse in August 2020, Empire has completed four exploratory drilling programmes, consisting of 118 Reverse Circulation ('RC") drill holes for a total of 10,081 metres and nine diamond drill holes for a total of 1,200 metres.  

 

 Results from Current Diamond Drilling Campaign

The gold mineralisation at Eclipse is hosted in sheared felsic to intermediate volcanic and volcaniclastic sediments and associated with pyrite, pyrrhotite and quartz veining. Analyses of the structural data collected during the initial diamond drilling campaign in 2021 confirmed the gold mineralisation to be associated with shear foliation within the volcaniclastic sediments.

 

The current diamond drilling campaign, the second carried out by Empire at Eclipse, has been designed to gather further geological and structural information on the mineralised shear and to test for lodes below the gold-depleted zone of weathering.

 

Six DD holes for a total of 999m were completed, focused mainly on demonstrating that the gold mineralisation persists at depth around the Eclipse shaft and Jack's Dream shaft, and to test for continuity between Eclipse and Jack's Dream and to the north-west of Jack's Dream.

 

Five of the six DD holes intercepted the mineralised shear, with significant intercepts reported in Table 1 below.

Hole ID

Depth From (m)

Depth To

(m)

Interval (m)

Au (g/t)

Target

ECDD22_001

NSV 1

Step out to SW - EOH2 = 120.3m

ECDD22_002

135.06

140.32

5.26

0.95

Underneath Eclipse Shaft

EOH = 179.4m

 

incl

135.06

135.96

0.90

1.40

 

138.72

139.26

0.54

2.61

ECDD22_003

164.19

165.63

1.44

2.25

Continuity of Eclipse mineralisation to NW

EOH = 185.4m

incl

164.69

165.3

0.61

1.63

 

165.30

165.63

0.33

4.28

ECDD22_004

169.09

169.94

0.85

0.40

Continuity to Eclipse mineralisation to NW - EOH = 189.3m

ECDD22_005

57.56

60.3

2.74

0.41

Step out to SW of Jack's Dream

EOH = 180.3m

incl

57.56

58.24

0.68

1.10

 

77.2

85.86

8.66

0.47

incl

77.2

77.65

0.45

1.12

 

78.79

79.20

0.41

2.16

80.43

81.09

0.66

1.11

81.09

81.57

0.48

1.64

ECDD22_006

119.0

123.38

4.38

0.53

Step out to NW of Jack's Dream

EOH =143.9m

incl

121.15

121.65

0.50

1.78

122.98

123.38

0.40

1.25

Table 1. Significant gold intercepts at a downhole cut-off grade of >0.3g/t Au and >1g Au*m intervals. (1 NSV = no significant values. 2 EOH = End of Hole Depth)

 

It is noteworthy that ECDD22_003 and ECDD22_005 have proven the continuity of gold mineralisation to the north-west of the Eclipse shaft indicating the potential for Jack's Dream mineralisation to link directly to the Eclipse lode. Furthermore, ECDD22_006 has demonstrated that the mineralisation at Jack's Dream is open to the north-west. Both areas had been previously under-explored.

 

The significant intercept at depth in ECDD22_002, which was drilled below the Eclipse shaft has demonstrated that the Eclipse lode remains open at depth.

 

The next phase of the Empire's exploration programme will focus on further RC drilling campaigns centred around the high-grade lodes recently identified at Homeward Bound and extensions to the Eclipse shear, north-west of Jack's Dream. The data collected from this DD campaign will provide an important insight into the geological and structural controls that affect the high-grade lodes and will allow a more targeted approach to our future drill campaigns.

 

Competent Person Statement

The technical information in this report that relates to the Eclipse Gold Project has been compiled by Ms Louisa Stokes, an employee of Eclipse Exploration Pty Ltd, a wholly-owned subsidiary of Empire. Ms Stokes is a Member of the Australian Institute of Mining and Metallurgy. Ms Stokes is employed in the role of Exploration Geologist and has been planning the exploration activities for the Eclipse-Gindalbie project areas. Ms Stokes has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Ms Stokes consents to the inclusion in this release of the matters based on her information in the form and context in which it appears.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014, as incorporated into UK law by the European Union (Withdrawal) Act 2018, until the release of this announcement.

 

**ENDS**

For further information please visit www.empiremetals.co.uk  or contact:

Empire Metals Ltd

Shaun Bunn /Greg Kuenzel

Tel: 020 7907 9327

S. P. Angel Corporate Finance LLP (Nomad & Broker)

Ewan Leggat /Adam Cowl

Tel: 020 3470 0470

Shard Capital Partners LLP (Joint Broker)

Damon Heath

Tel: 020 7186 9950

St Brides Partners Ltd (Financial PR)

Susie Geliher/ Ana Ribeiro/ Selina Lovell

Tel: 020 7236 1177

About Empire Metals Limited

Empire Metals is an AIM-listed (LON: EEE) exploration and resource development company with a project portfolio comprising gold interests in Australia and Austria.

 

The Company's strategy is to develop a pipeline of projects at different stages in the development curve. Its initial focus has been on the high-grade Eclipse and Gindalbie Gold Projects in Western Australia. The Company expanded its exploration licence area in April 2022 from 9.5km2 to 1,728km2 with the acquisition of the Pitfield Copper-Gold Project and the Walton Copper-Gold Project in Western Australia, and the Stavely Copper-Gold Project in the Stavely Arc region of Victoria. 

 

Empire also holds a portfolio of three precious metals projects located an historically high-grade gold production region comprising the Rotgulden, Schonberg and Walchen prospects in central-southern Austria.

 

The Board continues to evaluate opportunities through which to realise the value of its wider portfolio and reviews further assets which meet the Company's investment criteria.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFLFSREAIELIF
Date   Source Headline
14th Mar 20254:31 pmRNSAdmission to Trading on OTCQB - Replacement
14th Mar 20257:00 amRNSAdmission to Trading on OTCQB in the United States
11th Mar 20257:00 amRNS-RNew Corporate Presentation
10th Mar 20257:00 amRNSHigh-Purity TiO2 Product Achieved
4th Mar 202512:29 pmRNSTR-1: Standard form for notification of holdings
27th Feb 20259:52 amRNS-RCORRECTION - Investor Presentation via IMC
27th Feb 20257:00 amRNS-RInvestor Presentation via Investor Meet Company
19th Feb 20257:00 amRNS-RInvestor Meet Company Spotlight Event
17th Feb 20257:00 amRNSMajor Drilling Campaign to Commence at Pitfield
13th Feb 20257:00 amRNSSignificant Progress Achieved on Process Flowsheet
4th Feb 20257:01 amRNS-RNew Corporate Presentation
29th Jan 20254:24 pmRNSExercise of Options
23rd Jan 20257:00 amRNSAppointment of Renowned Mining Executive to Board
10th Dec 20241:00 pmRNSHolding(s) in Company
9th Dec 20247:00 amRNSExceptional Testwork Results Achieved at Pitfield
7th Nov 20247:00 amRNSPitfield: Positive Drilling & Metallurgical Update
24th Oct 20247:00 amRNSDiamond Drilling at Pitfield Completed
30th Sep 20247:00 amRNSOversubscribed Placing to Raise £2.5 million
25th Sep 20247:00 amRNSEnvironmental Studies to Commence at Pitfield
18th Sep 20247:00 amRNSInterim Results
16th Sep 20247:00 amRNSNew Corporate Website and Branding
10th Sep 20247:00 amRNSDiamond Drilling to Commence at Pitfield Project
4th Sep 20247:00 amRNSPositive Results from Initial Processing Testwork
22nd Aug 20247:00 amRNSHigh Purity Anatase Confirmed Within Weathered Cap
12th Jun 20247:00 amRNSExploration Target for Pitfield Titanium Project
11th Jun 20247:01 amRNSFinal Results
11th Jun 20247:00 amRNSInvestor Events
5th Jun 20247:00 amRNSMajor New Titanium Dioxide Mineral Discovery
28th May 20247:00 amRNSResults from Pitfield Diamond Drilling Programme
15th May 20247:00 amRNSHigher Grade Mineralisation Identified
26th Apr 20247:00 amRNSStavely Project Update
25th Apr 20247:00 amRNSDrill Results Confirm Widespread High-Grade TiO2
18th Apr 20247:00 amRNSDrilling Successfully Completed at Pitfield
17th Apr 20247:00 amRNSPitfield Project JV to Include All Minerals
27th Mar 20247:00 amRNSPitfield Development Plan
13th Mar 20247:00 amRNSInvestor Presentation
5th Mar 202412:00 pmRNSUpdated Corporate Presentation
5th Mar 20247:00 amRNSFavourable Metallurgical Characteristics Confirmed
29th Feb 20247:00 amRNSDiamond Drilling to Commence & Grant of Options
23rd Feb 20247:00 amRNSRationalisation of Portfolio
6th Feb 20247:00 amRNSAppointment of Process Development Manager
5th Feb 20247:00 amRNSResource and Metallurgical Drilling to Commence
31st Jan 20247:00 amRNSHolding(s) in Company
29th Jan 20243:17 pmRNSDirector/PDMR Shareholding
22nd Jan 20247:01 amRNSExtensive, Shallow High-Grade Bedded Ti Confirmed
22nd Jan 20247:00 amRNSSaudi Strategic Investor Led Placing to Raise £3m
27th Dec 20232:40 pmRNSExercise of Options & Issue of Equity
19th Dec 20237:00 amRNSDrill Results: Additional High-Grade Titanium
8th Dec 20232:36 pmRNSExercise of Options & Issue of Equity
29th Nov 20233:32 pmRNSExercise of Warrants & Issue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.