Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.245    0.00 (0.00%)
Bid:
0.23
Ask:
0.26
Spread: 0.03 (13.043%)
Market Cap: £8.68m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Update Re SLM Gold Project

14 May 2015 07:00

The directors of ECR Minerals plc (the “Directors”) are pleased to provide the following update with regard to the SLM gold project in La Rioja Province, Argentina. The SLM project is 100% held by ECR’s wholly owned Argentine subsidiary Ochre Mining SA (“Ochre”).

A privately owned Argentine company named Esperanza Resources SA (“Esperanza”) has constructed and is in the process of commissioning a mineral processing plant (the “Plant”) in the Sierra de las Minas region of La Rioja. The Plant is configured to recover gold via gravity and flotation processes and is located approximately 4km, 9km and 44km (straight line distances) from Ochre’s JV, Maestro Agüero and El Abra gold prospects, respectively. Estimated distances by road are 8km, 12km and 79km, respectively.

The Plant was visited last week by Stephen Clayson, CEO of ECR, and a meeting was held with the owners and managers of Esperanza. A non-binding memorandum of understanding (the “MoU”) was signed between Esperanza and Ochre which provides for the parties to hold discussions aimed at forming a joint venture or other commercial arrangement for the processing of ore from Ochre’s licence areas by Esperanza.

There can be no assurance that such discussions will reach a satisfactory conclusion or that any arrangement will be entered into. Ochre will therefore continue to investigate the viability and economics of other potential processing options, such as heap leaching. Extraction of ore from any of Ochre’s licence areas and the development of any processing facility by Ochre would be subject to the necessary permits, including environmental permits, being obtained. No such permits have yet been applied for.

However, the Directors consider that the existence of the Plant and the willingness of the owners and managers thereof to enter into discussions with Ochre may constitute a significant opportunity in the context of the Company’s stated exploration strategy for the SLM project, which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis. A further announcement will be made in due course, following the conclusion of discussions with Esperanza.

Ochre has been advised that the Plant is targeting total processing capacity of 50 tonnes of ore per day by the end of year, although there is no guarantee this target will be achieved or that capacity will be available to process ore from Ochre’s licence areas. The Plant is presently processing ore extracted from a licence area located to the east of Ochre’s JV prospect.

Further to the Company’s announcement of 1 May 2015, geological mapping at the JV prospect will commence in the second half of May 2015 as planned. The results of bulk sampling carried out at the Maestro Agüero prospect in March 2015 are now expected in the first half of June 2015. Both the mapping and bulk sampling results will inform discussions with Esperanza and decisions by ECR as to the next steps for the SLM project.

Stephen Clayson, Chief Executive Officer of ECR, commented:

“It is encouraging to see the development of a modern processing plant close to Ochre’s gold prospects. The Plant is not located immediately adjacent to any deposit and has good road access for the trucking of feed material from various sources. Whilst there is no certainty at this stage that Ochre will enter into an agreement with Esperanza, we believe the potential synergy between Esperanza’s operations and our strategy for the SLM project area is readily apparent, as is the potential for cooperation between Ochre and Esperanza to enable that strategy to develop more quickly.”

This announcement has been reviewed by Richard Watts B.Eng. Mining, Fellow of the South African Institute of Mining & Metallurgy, a director of the Company with more than 40 years of experience in the mining industry.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the SLM gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR continues to review potential new investments on a highly selective basis, with a concentration on precious, base and strategic metals projects in Asia and South America.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
Paul Johnson, Non-Executive Chairman
Stephen Clayson, Director & CEO
Richard (Dick) Watts, Technical Director

Email: info@ecrminerals.com

Website: www.ecrminerals.com

Cairn Financial Advisers LLP Tel: +44 (0)207 148 7900
Nominated Adviser
Emma Earl/Jo Turner
Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550
Broker
Martin Lampshire

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

Copyright Business Wire 2015

Date   Source Headline
28th Jun 20134:29 pmBUSHalf-yearly Report
25th Jun 20135:00 pmBUSExtension of Due Diligence Period
12th Jun 20137:00 amBUSPLACING TO RAISE £450,000
22nd May 20137:00 amBUSPLACING TO RAISE £400,000
10th May 20132:27 pmBUSHolding(s) in Company
1st May 20134:22 pmBUSHolding(s) in Company
29th Apr 20134:35 pmBUSIssue of Equity
29th Apr 20132:00 pmBUSECR SECURES RIGHT TO EARN 50% INTEREST IN ITOGON GOLD-SILVER PROJECT, PHILIPPINES
5th Apr 20137:00 amBUSFINANCING UPDATE
2nd Apr 20139:28 amBUSRESULT OF AGM AND STATEMENT
7th Mar 20137:47 amBUSFinal Results
25th Feb 20131:06 pmBUSTHEMAC Resources Update
18th Feb 20133:22 pmBUSFINANCING UPDATE
15th Feb 20131:31 pmBUSTHEMAC Resources Update
11th Feb 20134:14 pmBUSCOMPLETION OF GOLD CREST SALE
31st Jan 20132:47 pmBUSTotal Voting Rights
31st Jan 20139:51 amBUSBOARD CHANGES
14th Jan 201311:52 amBUSResult of General Meeting and Update
28th Dec 20129:37 amBUSFinancing Update
24th Dec 20127:00 amBUSDisposal of Interest in Gold Crest and Its Subsidiary, ACS
19th Dec 20121:15 pmBUSTHEMAC RESOURCES UPDATE
6th Dec 20123:39 pmBUSTHEMAC Resources News Release
30th Nov 201212:00 pmBUSTotal Voting Rights
23rd Nov 20123:31 pmBUSIssue of Equity
19th Nov 201211:57 amBUSDirectorate Change
15th Nov 20121:47 pmBUSNegotiations re Sale of Shareholding in Gold Crest Holdings Ltd
30th Oct 20124:57 pmBUSIssue of Equity
25th Oct 20124:07 pmBUSEL ABRA GOLD PROSPECT UPDATE
22nd Oct 20127:00 amBUSUPDATE ON ACTIVITIES
3rd Oct 201210:13 amBUSHolding(s) in Company
3rd Oct 20127:52 amBUSTHEMAC Begins Work On Definitive Feasibility Study For Copper Flat Project
28th Sep 201212:17 pmBUSTotal Voting Rights
18th Sep 201210:44 amBUSUnderground Sampling in Progress at El Abra Gold Prospect
31st Aug 20126:08 pmBUSIssue of Equity - Replacement
31st Aug 20124:00 pmBUSECR's INTEREST IN THEMAC RESOURCES GROUP
31st Aug 201212:20 pmBUSTotal Voting Rights
29th Aug 20127:00 amBUSHolding(s) in Company
23rd Aug 20127:53 amBUSThemac Resources Files Copper Flat Prefeasibility Study
16th Aug 20123:00 pmBUSIssue of Equity
9th Aug 20121:00 pmBUSTHEMAC Resources Announces Further Positive Drill Results from Copper Flat Project
7th Aug 20127:00 amBUSProgress Update
31st Jul 20122:28 pmBUSTotal Voting Rights
20th Jul 201211:36 amBUSDirector/PDMR Shareholding
20th Jul 20129:57 amBUSDirector/PDMR Shareholding
19th Jul 20124:40 pmBUSDirector/PDMR Shareholding
19th Jul 20121:48 pmBUSTHEMAC Resources Announces Positive Results of Copper Flat Prefeasibility Study
10th Jul 20121:22 pmBUSIssue of Equity
2nd Jul 20127:00 amBUSTotal Voting Rights
29th Jun 20127:00 amBUSHalf-yearly Report
27th Jun 201212:47 pmBUSPositive Drilling Update from THEMAC Resources

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.