Less Ads, More Data, More Tools Register for FREE

Pin to quick picksDCP.L Regulatory News (DCP)

  • There is currently no data for DCP

Trading Statement

25 Oct 2007 07:30

Diamondcorp Plc25 October 2007 DiamondCorp plc ("DiamondCorp" or the "Company") Trading Update for the three months ending 30 September 2007 25 October 2007 Highlights • Lace mine diamond recovery plant commissioned.• 9,290 carats of diamonds recovered during commissioning from 120,399 tonnes of tailings, including a 17.72 carat stone and a 13.81 carat stone.• 5,412 carats sold at tender for US$261,105.• More than 80% of the diamonds recovered to date are gem quality, including a high proportion of clear white stones, a significant proportion of fancy yellow stones, as well as more than 300 small pink and vivid purple diamonds and one small intense blue diamond.• As a result of the high quality of the diamonds recovered from the tailings, a programme for accelerated development of the Lace underground mine has been adopted.• After the quarter, the Company's option to purchase Sonop was terminated. As a result, trading in the Company's shares was restored on AIM.• Management worked with Investec Bank during the quarter to progress the process of obtaining a listing for DiamondCorp's shares on the JSE Limited. South African Operations - Lace Diamond Mine (DiamondCorp 74%) During the quarter, commissioning of a 1.6 million tonne per annum dense mediaseparation plant was completed at the Company's 74% owned Lace diamond mine,near Kroonstad, 200km southwest of Johannesburg. During commissioning, 120,399tonnes of tailings were treated for the recovery of 9,290 carats of diamonds,representing a recovered grade of 7.72 carats per hundred tonnes (cpht). Approximately 40% of the tailings treated during commissioning have beenstockpiled awaiting re-crushing to liberate additional diamonds locked up in+6mm to 28mm kimberlite particles. This material is currently being processedthrough the recrush circuit which was not operational during commissioning.Since commencement of the recrush circuit, the recovered grade of run of minetailings has been in excess of the budgeted 10.8 cpht. The recrush material willnow be treated in a campaign to clear the stockpile. Once this is cleared, theplant should achieve a steady state production of approximately 4,000 tonnes oftailings material per day. During the period, 5,412 carats recovered during commissioning were sold attender for proceeds of US$261,105. DiamondCorp will hold another tender of Lacediamonds before the end of the year. In assessing the first tender parcel, the company's independent diamond advisersWWW International Diamond Consultants noted that the colour of the Lace diamondswas above world average and the better-quality parcels contained a healthyproportion of well formed crystal and octahedron sawable shapes. More than 80% of the production is gem quality, and management is pleased withthe significant proportion of fancy coloured stones in the production. More than7% of production comprises fancy intense yellow stones, and to date more than300 small intense pink and vivid purple diamonds have been recovered. One smallintense blue diamond has also been recovered. Commenting on the production, DiamondCorp's managing director Paul Loudon said:"The quality of the stones is exceeding our expectations and the significantproportion of fancy coloured stones including the rarest diamond of them all -an intense blue diamond - augurs well for high quality production fromunderground at Lace. As a result, management has formulated an accelerateddevelopment plan which aims to introduce pipe material into the mine plan by thethird quarter of next year." The accelerated plan involves a sinking decline shaft into the unmined portionof the Lace satellite pipe which was only mined by open pit methods to a depthof 50m. Bulk testing followed by trial underground mining of the satellite pipekimberlite via the decline shaft will be undertaken simultaneously with therefurbishment of the existing 360m deep 4.6m x 2.7m vertical shaft whichaccesses the main Lace pipe. Snowden Mining Industry Consultants Pty Ltd hasbeen engaged to work with Lace management in completing a Scoping Study on theaccelerated development plan during the current quarter. Operations - Other During the quarter, the Company signed an option agreement to acquire SonopDiamond Mining (Pty) Limited, South Africa's largest private diamond miningcompany for 7.5 million DiamondCorp shares and US$45 million in cash. As aresult of signing the option, the company's shares were suspended from tradingon AIM. During October, DiamondCorp and Sonop mutually agreed to terminate theoption and, accordingly, DiamondCorp has requested that trading in its ordinaryshares on AIM be restored. DiamondCorp continues to evaluate the Sonop assets aspart of its ongoing programme to expand its diamond production base in SouthAfrica. During the quarter, management also assessed a number of other diamondproduction opportunities and several of these opportunities are beingprogressed. No activities were undertaken on the Company's explorationproperties during the quarter. Corporate Management worked with Investec Bank during the quarter to progress the processof obtaining a listing for DiamondCorp's shares on the JSE Limited. For further information, please contact: Paul Loudon, Managing Director and CEODiamondcorp plc+44 20 7256 2651 Joe Nally/Simon SouthwoodCenkos Securities plc+44 20 7397 8900 Robert Smith/Cindy StoutjesdykInvestec Bank Limited+27 11 286 7662 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Apr 20107:30 amRNSOperational Update
13th Apr 20103:32 pmRNSHolding(s) in Company
8th Apr 20104:06 pmRNSHolding(s) in Company
8th Apr 20102:42 pmRNSHolding(s) in Company
6th Apr 20104:02 pmRNSHolding(s) in Company
1st Apr 20103:45 pmRNSResult of EGM - Replacement
1st Apr 20101:00 pmRNSResult of EGM
15th Mar 20102:56 pmRNSIssue of Equity Replacement
15th Mar 20107:00 amRNSIssue of Equity
12th Feb 201010:30 amRNSAppointment of Joint Broker
10th Feb 20107:00 amRNSMarket Update
21st Jan 201012:45 pmRNSIssue of Equity
16th Dec 20095:00 pmRNSNotice of EGM
24th Nov 20097:30 amRNSDrilling Update
17th Nov 20097:00 amRNSBotswana Drilling Update
16th Nov 20093:30 pmRNSIssue of Equity
3rd Nov 20091:45 pmRNSIssue of Equity
14th Oct 20097:00 amRNSUpdate on Offer Talks and Financial Position
5th Oct 20097:00 amRNSStatement re Possible Offer
30th Sep 200912:30 pmRNSHalf Yearly Report
31st Jul 200911:00 amRNSLace Mine Update
24th Jun 20094:30 pmRNSOperational Update
7th May 20097:30 amRNSAGM Statement
31st Mar 20097:30 amRNSFinal Results
30th Mar 20097:30 amRNSOperational Update - Crushing Circuit
5th Feb 200912:00 pmRNSGrant of mining right
27th Jan 200910:00 amRNSTrading Statement
17th Dec 20089:00 amRNSHolding(s) in Company
14th Nov 20083:49 pmRNSHolding(s) in Company
14th Nov 20088:42 amRNSDirectorate Change
14th Nov 20088:00 amRNSDirector/PDMR Shareholding
13th Nov 20088:00 amRNSHolding(s) in Company
12th Nov 200810:10 amRNSEIIB announces increased private equity investment
7th Nov 200811:26 amRNSIssue of Equity
29th Sep 20088:00 amRNSInterim Results
1st Sep 20084:00 pmRNSResult of EGM
15th Aug 200812:00 pmRNSNotice of GM and posting of c
28th Jul 20089:00 amRNSLoan Facility
4th Jul 20082:00 pmRNSResult of AGM
3rd Jul 20087:30 amRNSMARKET UPDATE - JULY 2008
20th Jun 200811:00 amRNSHolding(s) in Company
30th May 200812:00 pmRNSDirector/PDMR Shareholding
28th May 20084:00 pmRNSAGM statement and Annual Repo
23rd May 20084:00 pmRNSIssue of Equity
30th Apr 20089:00 amRNSExercise of warrants
8th Apr 20087:30 amRNSSenior Management Appointment
31st Mar 20087:02 amRNSNotice of dual listing
20th Mar 200810:00 amRNSNotice of dual listing
4th Mar 20087:00 amRNSFinal Results
15th Feb 20087:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.